Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Special Notice opportunity from Department Of Transportation was posted on November 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre Bid Meeting -WY FLAP SHE 26(1), Red Grade Road, Phase 1

Closed
6982AF26SN000001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is seeking competitive subcontractor quotes for asphalt repairs associated with the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This solicitation is for bidding purposes to assist the prime contractor in preparing their project bid and is not a formal subcontract agreement. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt work necessary for project completion. Interested contractors must submit their proposals by November 27, 2026, via email to Shane Phillips. Submissions must include company contact information, itemized pricing, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all qualified contractors are encouraged to apply, there is a specific emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included for the selected contractor.
D.R. Phillips, LLC

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
Construction of the Dulles West Boulevard, RFQ 704022
Solicitation # RFQ 704022
The County of Loudoun, Virginia, is seeking a qualified contractor for the construction of Dulles West Boulevard under solicitation RFQ 704022. This lump sum project involves the creation of a four-lane median-divided roadway approximately 4,400 linear feet in length, connecting Northstar Boulevard and Arcola Boulevard. The scope of work includes the installation of ten-foot-wide shared-use paths on both sides of the road, two signalized intersections at Stone Springs and Arcola Boulevards, roadway improvements to Stone Springs Boulevard, two new stormwater management facilities, and two major culvert crossings. General requirements encompass surveying, construction layout, earthwork, rock excavation, and strict adherence to Virginia Stormwater Management Program and VDOT Land Use permits. The contract will be awarded to the lowest responsive and responsible bidder based on a lump sum bid, with a preference for Loudoun County and Commonwealth of Virginia vendors in the event of a tie. Bidders must provide a bid bond, and the successful contractor must furnish payment and performance bonds within fifteen calendar days of award. Performance must align with the 2020 VDOT Road and Bridge Specifications and comply with OSHA, ADA, and prevailing wage requirements. Key technical standards include specific density requirements for control strips and strict chemical concentration limits for liners. Payment is processed via applications for payment, with the Engineer of Record recommending certificates for payment within seven calendar days. Bids must be submitted by December 17, 2026, at 4:00 p.m. Eastern time.
Loudoun County

POSTED

about 5 hours ago

DEADLINE

in 30 days
NAICS: 237310
New
SLED
Multi-Purpose Path along Barlow Road (Phase 2)
Solicitation # 50012
The City of Hudson, Ohio, is soliciting bids for Phase 2 of the Multi-Purpose Path along Barlow Road in Summit County. The project scope involves the installation of approximately 200 lineal feet of seven-foot wide Class C concrete trail, along with grading, pavement striping, storm improvements, and road improvements. Depending on necessity, railroad improvements may also be required. Technical execution must adhere to a hierarchy of standards, prioritizing City of Hudson plans and engineering standards, followed by Norfolk Southern and ODOT Construction and Material Specifications. Specific requirements include the use of ADA-compliant brick red truncated domes for curb ramps and Type 1 fast dry, water-based acrylic paint for pavement markings. Bids must be submitted electronically via Bid Express by December 8, 2026. The contract will be awarded to the lowest and best bidder based on compliance, financial ability, and a minimum of three years of experience in similar projects. The successful contractor must provide a performance bond, payment bonds, and three specific insurance policies. Labor must be compensated according to Summit County prevailing wage rates per Ohio Revised Code Chapter 4115. The deadline for substantial completion of Phase 2, including all punch list items, is April 30, 2027, with liquidated damages of 1,000 dollars per day for delays and 500 dollars per event for non-notification.
City of Hudson

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
American Legion Bridge and I-270 Multimodal Corridor Presolicitation Information Memorandum
Solicitation # BPM059773
The Maryland Department of Transportation State Highway Administration is issuing a Presolicitation Information Memorandum for the American Legion Bridge and I-270 Multimodal Corridor project. This proposed Public-Private Partnership utilizes a Design-Build-Finance-Operate-Maintain structure to implement significant corridor improvements. The technical scope involves adding two new High Occupancy Toll managed lanes in each direction on I-495 from the Virginia border to the I-270 west spur, and converting one existing HOV lane to a HOT lane while adding one new HOT lane in each direction on the I-270 west spur. The project aims to enhance trip reliability, reduce travel times, and improve multimodal options while adhering to the August 2022 federal Record of Decision. The procurement process is intended to follow a best-value determination approach using trade-off analysis, beginning with a Request for Qualifications to establish a shortlist before soliciting final technical and financial proposals. While this is a preliminary memorandum to gather industry input, the framework specifies that the developer will be responsible for all design and construction work, including the provision of performance and payment bonds. Funding for the project is structured to be payable solely from collected toll revenues or appropriations from the Maryland General Assembly. Interested parties must submit a One-on-One Meeting Request Form by December 18, 2026, to engage in market-sounding meetings.

POSTED

about 6 hours ago

DEADLINE

in about 1 year

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Arvada, WY, 82831, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this first762 pages · specifications
High
PDF, Low priority88 pages · other
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA

Full Description

Show more

WY FLAP SHE 26(1) Red Grade Road, Phase 1


This Pre-Bid Meeting has been changed to a in-person meeting.


Special Notice:


The Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFLHD) will be conducting a IN PERSON Pre-Bid meeting for WY FLAP SHE 26(1) Red Grade Road, Phase 1 on November 13, 2025, at 9:00 a.m. Mountain Time. Meeting at the Base Trailhead Parking Lot (right at the beginning of the project ~MP 1) County Highway 26.


Please send an email to CFL Acquisitions, Sign up to see this detail if you would like to attend.  Please ensure that  WY FLAP SHE 26(1) Red Grade Road, Phase 1 Attn: Kelly Palmer or Laura Slauter is in the subject line.  


The project site is currently accessible and available for viewing prior to the meeting and throughout the Solicitation timeframe, weather permitting.


THIS IS A NON-MANDATORY MEETING.


Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.


PROJECT DESCRIPTION:  The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues.


SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two (2) schedules and one (1) option:


  • Schedule A is approximately 1.8-miles (~MP 1.0 to ~MP 2.8) and includes the majority of large cuts and retaining walls.
  • Schedule B is approximately 2.6-miles (~MP 1.0 to ~MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles.
  • Option X includes the rehabilitation of the Aspen’s Parking Lot at ~MP 2.7.

The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.


More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Solicitation # 6982AF27B000005
The Bridges on Delicate Arch Road project (UT NP ARCH 100(2)) is a construction effort within Arches National Park, Utah, managed by the Federal Highway Administration Central Federal Lands Highway Division. The project aims to resolve chronic flooding and sediment deposition issues caused by inadequate culverts at Salt Valley Wash, Salt Wash, and Winter Camp Wash. The scope of work involves the design and construction of three 100-foot span concrete bridges, roadway realignment at Salt Valley Wash, and raising the roadway profile to accommodate a 10-year design frequency. Additionally, the project includes full depth reclamation or pavement removal and a 4-inch asphalt overlay for various roadway and parking areas, including the Wolfe Ranch and Wolfe Ranch Auxiliary parking lots. Solicited as a full and open competition with a HUBZone price preference under NAICS 237310, the contract is estimated between $10 million and $20 million. The anticipated schedule begins with an award in November 2026 and a notice to proceed in December 2026, with completion expected by December 2028. Award will be granted to the lowest responsive and responsible bidder. Key technical requirements include adherence to FP-14 standard specifications, the use of drilled shaft foundations, and strict compliance with the Buy American Act and Davis-Bacon Act. The project is divided into a primary requirement (Schedule A) and two options (Option X and Option Y) based on funding availability.
Highway, Street, and Bridge Construction

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Federal
CFLHD Indefinite Delivery, Indefinite Quantity (IDIQ) for Architect-Engineer Design Services
Solicitation # 6982AF26R000004
The Federal Highway Administration, Central Federal Lands Highway Division (CFLHD) is soliciting qualifications to award up to three Full-Service Indefinite Delivery, Indefinite Quantity (IDIQ) Firm-Fixed-Price contracts for Architect and Engineering (A-E) services. With a shared maximum value of 60 million dollars over a five-year period and a minimum order guarantee of 25,000 dollars per contract, these awards will support transportation engineering needs for various Federal Land Management Agencies. The scope of work focuses on the planning, environmental compliance, and design of rural low-volume roadways across 14 states, including Arizona, California, Colorado, Hawaii, Kansas, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, Utah, and Wyoming. Required services encompass project management, highway design using context-sensitive principles, geotechnical and structural engineering, and hydraulic/hydrologic analysis. Selection is conducted as a two-phased process in accordance with the Brooks Act, where price is not evaluated during the initial qualification phase. Firms are evaluated based on their project delivery process and QA/QC programs, professional qualifications, use of innovative delivery methods, workload management strategies, and past performance from the last six years. Short-listed firms will be required to provide oral presentations. This is a full and open competition with at least one award reserved as a small business set-aside. All prime contractors and subcontractors must be licensed and registered to practice in the states where work is performed. Submissions must be provided via SF 330, limited to 50 pages, and submitted electronically by November 20, 2026.
Engineering Services

POSTED

4 days ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
Federal
CO OMAD 300(71) Minuteman Missile Access
Solicitation # 6982AF27B000010
The Office of Missile Air Defense Program (OMAD) solicitation 6982AF27B000010 is a total small business set-aside for the maintenance and improvement of Minuteman Missile Access Roads across southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. This firm-fixed-price contract, issued by the Federal Highway Administration Central Federal Lands Highway Division, has an estimated value between 5 million and 10 million dollars. The scope of work involves roadway reconditioning, the addition of a four-inch aggregate surface course with a maximum width of 24 feet and a 4 percent crown, the replacement of culverts, and signage improvements across approximately 114 miles of roadway. All work must be performed on the existing roadway bench in accordance with FP-24 Standard Specifications. The contract is divided into three schedules, with award based on the lowest responsive and responsible bidder. Evaluation priority is given to Schedule C, followed by Schedule B, and then Schedule A, provided funds are available. Performance must begin within 10 calendar days of the notice to proceed, with completion dates ranging from August 9, 2027, for Schedule A to September 13, 2027, for Schedule C. Bidders must submit a comprehensive package including SF-1442, bid schedules, a bid guarantee, and resumes for key personnel. The project requires strict adherence to the Davis-Bacon Act, the Buy American Act, and specific quality control standards, including the appointment of a Quality Control Manager and the use of Masterworks for electronic documentation.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
Federal
ND OMAD 2025(1) Minuteman Missile Access Road
Solicitation # 6982AF27B000011
Solicitation 6982AF27B000011 is a firm fixed price request for bids issued by the FHWA Central Federal Lands Highway Division for the maintenance and improvement of Minuteman Missile Access Roads in North Dakota. This total small business set-aside project, with an estimated value between 2 million and 5 million dollars, covers approximately 40.84 to 44.84 miles of roadway across Bottineau, McHenry, McLean, and Ward counties. The scope of work includes roadway reconditioning by scarifying to a minimum 4-inch depth, adding a 4-inch aggregate surface course with a maximum width of 24 feet and a 4 percent crown, and replacing culverts. All work must remain on the existing roadway bench and adhere to FP-24 Standard Specifications and MUTCD traffic control standards, with a requirement to limit public traffic delays to 30 minutes per passage. The contract will be awarded to the lowest responsive and responsible bidder, with the government evaluating bid schedules in order of priority from Schedule C to A based on funds availability. Bidders must submit physical, sealed bid packages by December 2, 2026, as electronic submissions are not accepted. Required documentation includes SF-1442, bid schedules, an authority to bind certificate, and bid guarantees. Performance and payment bonds are required per FAR 52.228-15, and the Davis-Bacon Act applies to wage requirements. The successful contractor must commence work within 10 calendar days of the notice to proceed and is responsible for quality control and maintaining specified liability insurance until final acceptance.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237310
Federal
CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Solicitation # 6982AF27B000009
The CO BR UCPO Blue Mesa Road project is a pre-solicitation effort by the Department of Transportation's Central Federal Lands Division to rehabilitate a 1.44-mile corridor in Gunnison County, Colorado. This corridor provides critical access to the Bureau of Reclamation Power Plant and Pine Creek Trailhead within the Curecanti National Recreational Area. The project is designated as a total small business set-aside under NAICS code 237310, with an estimated cost range between 2,000,000 and 5,000,000 dollars. The scope of work is divided into three primary components. Schedule A involves the rehabilitation of 0.86 miles of gravel road into asphalt concrete pavement, the reconstruction of 0.24 miles of existing asphalt to raise the roadway profile at the US 50 intersection, and various drainage, signing, and rockfall mitigation improvements. Option X includes the paving of an additional 0.34 miles of gravel road from the BOR gate to the power plant, along with conduit installation for a future automatic gate. Option Y focuses specifically on the installation of 2,215 linear feet of 6-inch HDPE electric conduit and associated utility trenching to provide power to the security gate. The anticipated project timeline begins with advertisement in November 2026, followed by an award in January 2027 and a notice to proceed in April 2027. Construction is scheduled to take place from May 2027 through October 2027. A non-mandatory pre-bid site visit is scheduled for November 4, 2026.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS