Pre-Cast Concrete & Headwall Construction

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the District of Squamish focuses on the installation of headwalls and pre-cast concrete elements for wastewater projects. The scope of work involves the placement of pre-cast concrete structures and the installation of rock armour and riprap to ensure outfall headwall protection in accordance with ACI standards. The primary objective is the delivery of a fully installed headwall and a rock-protected outfall termination. The project is categorized under NAICS code 238110 and was posted on September 4, 2026, with a response deadline of October 2, 2026. The contractor will operate as a subcontractor to prime contractors to complete these specialized infrastructure requirements within the District of Squamish.

General Info

Subcontract for installing headwalls and pre-cast concrete wastewater elements in District of Squamish.

Agency

District of SquamishView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of R26-66.

The full solicitation package (18 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wastewater Treatment Plant Outfall Extension Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Squamish
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Squamish
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs headwalls and pre-cast concrete elements for prime contractors on District of Squamish wastewater projects. Performs placement of pre-cast concrete structures and installation of rock armour/riprap for outfall headwall protection per ACI standards. Delivers the installed headwall and rock-protected outfall termination.

Similar Contracts

Same NAICS industry code

More opportunities from District of Squamish

Same awarding agency

NAICS: 237110
International
Wastewater Treatment Plant Outfall Extension Construction
Solicitation # R26-66
The District of Squamish is soliciting proposals for the Wastewater Treatment Plant Outfall Extension Construction project, identified as solicitation R26-66. The project requires the relocation and extension of the existing river outfall approximately 340 meters downstream to improve dilution conditions caused by changing river channel morphology. The scope of work encompasses pre-construction surveys, tree clearing, mobilization, the installation and commissioning of new infrastructure including HDPE and steel piping and diffusers, and final site restoration. Construction is anticipated to start by November 30, 2026, with a substantial completion date of March 26, 2027. Notably, all in-stream works must be completed within a strict window between January 1, 2027, and January 31, 2027. The project is subject to several critical regulatory approvals and environmental mandates, including authorizations from Transport Canada under the Canadian Navigable Waters Act, the Ministry of Water, Land and Resource Stewardship under the Dike Maintenance Act and Water Sustainability Act, and the Wildlife Act for access to the Skwelwil’em Squamish Estuary Wildlife Management Area. Environmental compliance is paramount, requiring a third-party Registered Professional Biologist to serve as the Environmental Monitor with the authority to suspend operations. Contractors must adhere to Fisheries and Oceans Canada guidelines to protect fish habitats, specifically regarding Bull Trout. Additionally, the project requires adherence to a Chance Find Procedure for archaeological resources and the designation of a prime contractor under the Workers Compensation Act. Proposals are due by October 2, 2026, and will be evaluated based on technical requirements, experience, and pricing.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 15 days
View Details
NAICS: 541690
International
Archaeological Consulting Services
Solicitation # R26-68
The District of Squamish is seeking professional archaeological consulting services for the Pemberton-Laurelwood Bridge Project, which involves constructing a multi-modal bridge across the Mamquam Blind Channel. The primary objective is to conduct Archaeological Impact Assessments and develop Chance Find Management Protocols to ensure compliance with the Heritage Conservation Act and provincial regulatory requirements. The scope of work includes managing permit applications with the BC Archaeology Branch and First Nations, conducting field investigations with an assumed excavation depth of two meters, and maintaining ongoing consultation with the Skwxwú7mesh Úxwumixw (Squamish Nation). Key deliverables include project schedules, work plans, draft and final AIA reports, and spatial data. Proponents must be professional members of the British Columbia Association of Professional Archeologists and provide a valid District of Squamish Business Licence, a WorkSafe BC Clearance Letter, and commercial general liability insurance of at least five million dollars per occurrence. Proposals are due by September 22, 2026, and will be evaluated based on a combination of rated technical criteria and pricing. The successful candidate will be selected based on a total score ranking and invited to enter direct contract negotiations. The contract requires the supplier to indemnify the District and adhere to strict confidentiality and intellectual property standards.
Other Scientific and Technical Consulting Services

POSTED

22 days ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS