Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Presolicitation opportunity from Oregon was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Solicitation Notice: City of Eugene Transportation System Plan Update

Closed
S-73000-00018147State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project in California. The scope of work involves the design of four monitoring wells and nine injection wells (seven operating and two standby) to replenish purified water into the Chino Groundwater Basin at an anticipated volume of 15,000 acre-feet per year. Key deliverables include a Basis of Design Report at the 30 percent design level, detailed design documents, and procurement packages for drilling and construction. The project must adhere to California Code of Regulations Title 22 for indirect potable reuse and follow ASCE (2007) guidelines for the Geotechnical Baseline Report. Construction for injection and monitoring wells is targeted to begin by May 2028, with well equipping starting by July 2029. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The selection process ranks consultants based on a 100-point scale, evaluating the team's qualifications and the consultant's understanding of the scope and efficiency. The top-ranked consultant will negotiate a not-to-exceed contract subject to approval by the IEUA Board of Directors. Compliance requirements include the Davis-Bacon Act, the Buy America Preference for Infrastructure Projects, and DBE requirements. Invoicing is conducted monthly via a standard Excel template with payments made through ACH.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
NAICS: 541330
New
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves providing professional engineering services to design a system that delivers purified water from the Advanced Water Purification Facility to injection wells. Key responsibilities include conducting utility research and field investigations, developing a basis of design across multiple disciplines, creating design drawings at 30, 60, 90, and final levels, and providing engineering support during the bid award process. The contract is structured as a not-to-exceed agreement, with the final fee to be negotiated with the top-ranked consultant. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted via PlanetBids by January 26, 2027. Evaluation is based on a 100-point scale, including a 20-point interview component for the top three ranked firms. Consultants must comply with strict DBE requirements, federal and state grant funding mandates, and the Agency's Engineering Design Guidelines. All payments are processed via ACH, and the Agency retains ownership of all project materials and data.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
NAICS: 541330
New
SLED
On-Call Structural Engineering Services
Solicitation # 27-079
Johnson County Community College is soliciting proposals for on-call structural engineering services to support projects involving building improvements, roadways, parking lots, sidewalks, drainage, lighting, and utilities, including water, electrical, gas, and sanitary sewer. The scope of work encompasses research, design, mapping, surveying, the preparation of plans and specifications, cost estimating, submittals review, and the creation of AutoCAD drawings. Additionally, the selected firm will provide construction management, inspection, and administrative support to assist the Campus Services Department with planning infrastructure capital improvements and budgets. The contract will be awarded to the respondent determined to be most advantageous to the College, with evaluation factors including price, conformance to specifications, quality, and past performance with the institution. Bidders must submit a proposal in PDF format not exceeding 50 pages and 7MB, utilizing Calibri 11pt font. Pricing must be submitted separately via a provided Excel file in the ProcureWare portal rather than within the main proposal. Required documentation includes a company overview, past performance descriptions, and specific exhibits detailing points of contact, the proposed team, and an organizational chart. Contractors must maintain minimum insurance coverages and provide certificates of insurance upon contract execution. There is no specified set-aside status for this solicitation.
Johnson County Community College

POSTED

about 5 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Oregon Department of Transportation is issuing a pre-solicitation notice for the City of Eugene Transportation System Plan Update. The project aims to update the existing plan to align with recent Transportation Planning Rules and establish an integrated multi-modal transportation network capable of supporting planned land uses over a twenty-year planning horizon. Key objectives include developing a planning framework with goals and performance measures, creating a funding and financing strategy, and conducting technical assessments of roadway, bicycle, pedestrian, transit, air, and rail facilities. The update must incorporate Vision Zero safety commitments, regional greenhouse gas reduction targets, and adhere to the Envision Eugene Comprehensive Plan and various state and regional planning goals. This notice is not a request for proposal, and a full solicitation package is not yet available. The project will be solicited via a Mini-RFP, and eligibility is strictly limited to consultants who have been awarded a Price Agreement from the TLUP-21 Price Agreement series under the Transportation System Planning discipline. The Mini-RFP is expected to close approximately 14 to 30 calendar days after it is posted on OregonBuys. Primary administrative contact for the procurement is Sarika Herigstad, while pre-solicitation inquiries should be directed to Sarah Peters.

General Info

Pre-solicitation notice for updating the City of Eugene's multi-modal Transportation System Plan.

Place of Performance

Salem, OR, 97301, USA

Set-Aside

NONE

Documents

1
PDF, Low priority3 pages · presolicitation
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 63 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
Contacts2 people available
OfficeSalem, OR, 97301, USA
Office AddressSalem, OR, 97301, USA
Contacts
Sarika HerigstadPurchaser

Full Description

Show more
This is a Pre-Solicitation Notice for the City of Eugene Transportation System Plan Update.

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238160
New
SLED
Davis Slough three roofs replacement
Solicitation # 00018265
The Oregon Department of Transportation is soliciting bids for the replacement of metal roofs, insulation, and gutters on three buildings at the Davis Slough Maintenance Station in Coos Bay: Storage building #04, Maintenance building #01, and Electrical storage building #03. The scope of work includes the demolition and removal of existing materials and the installation of new systems, including fasteners, ridge caps, and eave trim. The contractor is responsible for obtaining the Coos County Building Department permit and coordinating all inspections. Performance is subject to State Buy America requirements, BOLI prevailing wage rates, and Oregon OSHA safety standards. Substantial completion is required by March 31, 2027, with final completion by April 10, 2027. Award will be granted to the responsible bidder submitting the lowest responsive bid, evaluated based on total price using lump sum, unit price, or a combination of both. Bidders must provide bid security equal to 10% of the total bid amount and must submit a record of three similar projects completed within the last three years. Required certifications include non-discrimination in subcontracting and adherence to workplace policies regarding sexual harassment and discrimination. There is no set-aside status specified for this solicitation. All materials must be delivered in original packaging and stored according to specific moisture control and stacking guidelines to ensure quality.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS