Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Precision Installation & RF Alignment

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA9302 Aftc PzzView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

NONE

Documents

This scope was carved out of PZZG0917.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RAM Replacement, Installation, and Disposal

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9302 Aftc Pzz
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA9302 Aftc Pzz
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical installation of RAM for prime contractors on Benefield Anechoic Facility projects. Installs RAM blocks with precise geometric alignment and zero gap tolerance to prevent RF leakage. Utilizes HEPA filtration, negative-pressure containment, and 6-mil polyethylene sheeting to prevent carbon-dust migration. Adheres to strict environmental and safety protocols for chemical retardant containment. Delivers a fully installed RAM system.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Ruby Creek Park & Ride Construction
Solicitation # ruby-creek-park-ride-construction
The Ruby Creek Park and Ride Construction project involves the development of a fully operational 273-stall facility located near the intersection of SW Sedgwick Road and Sidney Road SW in Port Orchard, Washington. Managed by James W. Fowler Co. for Kitsap Transit, the scope of work encompasses comprehensive infrastructure and passenger amenities. Key deliverables include asphalt paving, curbs, gutters, sidewalks, and stormwater piping, alongside specialized technology such as passenger vehicle chargers, inductive bus chargers, CCTV, lighting, and general utilities. To enhance the passenger experience, the facility will also feature bus shelters, a ticketing kiosk, and restrooms, complemented by professional landscaping. This solicitation is a small business set-aside, and James W. Fowler Co. is actively seeking subcontractor and supplier pricing across various trades and materials. The project emphasizes inclusivity, specifically encouraging participation from minority, women, and disadvantaged business enterprises (M/W/DBE), as well as the utilization of apprentices. To support these efforts, the prime contractor is prepared to divide contract requirements into smaller portions where feasible and assist M/W/DBE firms in securing necessary equipment, supplies, bonding, lines of credit, or insurance. Interested parties can access detailed plans and specifications via the James W. Fowler website, with a response deadline established for September 30, 2026.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of Defense → FA9302 Aftc Pzz

Same awarding agency

NAICS: 332311
New
Federal
Vinyl Shelters / Sunshades-RAMP 7
Solicitation # FA930226R0008
Solicitation FA930226R0008 is a request for proposals for a total small business set-aside contract to manufacture, assemble, and install four prefabricated aircraft sunshades on Ramp 7 at Edwards Air Force Base, California. The project involves the design and construction of four 190-foot wide clear span structures featuring hot-dip zinc-coated steel frames and 28 oz flame-retardant translucent tan PVC coated fabric. The scope of work includes structural and lighting design, site preparation, LED lighting installation, and lightning protection, all of which must comply with UFC, FAA, and California building codes. The structures must be capable of withstanding sustained wind speeds of 110 mph and include a minimum 10-year warranty. The government will award a single firm-fixed-price contract using a best value tradeoff process. Evaluation is based on three equally important factors: price, technical capability, and past performance, though non-price factors are collectively weighted more heavily than price. The period of performance is scheduled from September 30, 2026, to September 29, 2027, with delivery terms set as FOB Destination. Offerors must submit electronic proposals in four distinct volumes, including a price proposal and past performance references from the last three years. Due to the location's proximity to active aircraft operations and classified work areas, the contractor must adhere to strict airfield safety, OPSEC, and base access requirements, including criminal background checks for all personnel.
Prefabricated Metal Building and Component Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 326150
New
Federal
RAM Replacement, Installation, and Disposal
Solicitation # PZZG0917
The United States Air Force is conducting market research to identify qualified sources for a five-year IDIQ contract to replace, install, and dispose of medium-power Radar Absorbing Material (RAM) at the Benefield Anechoic Facility (BAF) at Edwards Air Force Base, California. The objective is to upgrade electromagnetic energy absorption capabilities to support higher-power Systems Under Test without thermal or performance degradation. The requirement involves the manufacture of RAM in four distinct configurations (A, B, C, and D) with standardized 24 by 24 inch bases, professional installation including surface preparation and legacy RAM demolition, and environmentally compliant disposal of decommissioned materials. Technical requirements specify that the RAM must be open-cell foam capable of withstanding at least 2 Watts per square inch for one hour and must meet NRL Report 8093 flammability standards. Installation requires precise geometric alignment with zero gap tolerance to prevent RF leakage. Environmental safety is paramount, requiring the use of HEPA filtration, negative-pressure containment, and 6-mil polyethylene sheeting to prevent carbon-dust migration. All waste must be transported via closed vehicles to EPA-certified facilities, with the contractor providing a formal Certificate of Disposal within 30 days of completion. This is currently a sources sought notice under NAICS code 326150, and interested offerors must be able to support all aspects of the requirement to be considered.
Urethane and Other Foam Product (except Polystyrene) Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 811210
New
Federal
Test Support Equipment Control and Monitoring Systems (TSECMS)
Solicitation # FA930226Q0135
The Department of War intends to award a sole-source, firm-fixed-price contract to Siemens Industry Inc. for the maintenance and support of Test Support Equipment Control and Monitoring Systems (TSECMS) at Edwards Air Force Base, California. The scope of work covers buildings 1020, 1030, and 1040, focusing on the management, repair, and commissioning of Siemens Control Systems to ensure the readiness of facility HVAC and Chamber Support Equipment. Key deliverables include 24/7 technical support, preventive and corrective maintenance, and the migration of legacy building automation system infrastructure to a modern, open-protocol BAS platform utilizing BACnet/IP. The contract structure consists of a base period from October 5, 2026, to October 4, 2027, with four subsequent one-year option periods extending through October 4, 2031. The decision to sole-source this requirement is based on the proprietary nature of the Siemens Apogee software and hardware. The government determined that only Siemens factory-trained technicians possess the necessary proprietary diagnostic tools, such as Comtool, ZoneRX, and Datafox, required to interface with legacy field controller architecture. Market research concluded that third-party maintenance would introduce unacceptable mission risks, including the voiding of OEM warranties and the inability to access Tier-3 engineering escalation, which is critical for life-safety and mission-critical assets in the Anechoic Chamber testing environment. The contractor is required to comply with strict Operations Security policies and environmental regulations, including Air Force Manual 32-7002, and must utilize the Wide Area WorkFlow system for all electronic invoicing and payment requests.
Electronic and Precision Equipment Repair and Maintenance

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS