Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Prequalification for the Kitchener Wastewater Treatment Plant Administration Building

Active
PQ2026-20International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Region of Waterloo is seeking pre-qualified General Contractors and Mechanical sub-contractors for the construction of a new 725 m2 single-storey administration building and SCADA Control Centre at the Kitchener Wastewater Treatment Plant. This project, with an estimated cost of 15 million dollars, involves a LEED Silver Shadow design and requires the facility to be built as a post-disaster building with a raised reinforced concrete floor slab on steel piles to exceed regional flood elevations. The scope includes comprehensive site works such as grading, landscaping, an asphalt parking lot, a new sanitary wet well with a pumping station, and the installation of an automatic security gate. A critical requirement is the maintenance of all existing utilities and SCADA systems throughout construction, requiring close coordination with the Network Integrator to ensure a seamless transition to the new control centre without interrupting plant operations. The pre-qualification process requires submissions by October 6, 2026, and is based on CCDC 11-2019 standards, with the final construction contract utilizing CCDC 2. Applicants must demonstrate at least five years of business longevity, provide a WSIB clearance certificate, and submit a statement of financial stability along with a bonding company letter confirming limits for bid, performance, and labour and material payment bonds. Evaluation is based on a combination of pass/fail criteria and numerical scoring focusing on company profile and related experience, specifically regarding sustainable building practices, excess soil management, and the ability to operate on active treatment plant sites. All submissions must be uploaded in PDF format via the Region's electronic portal, and proponents must certify compliance with the Accessibility for Ontarians with Disabilities Act, 2005. Tendering is expected in late 2026, with construction scheduled to begin in Spring 2027.

General Info

Region of Waterloo seeks pre-qualified contractors for 15 million dollar wastewater facility project.

Agency

Region of WaterlooView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(1)

PQ2026-20: Kitchener Wastewater Treatment Plant Administration Building Prequalification

PDFrfpq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRegion of Waterloo
ContactsNo contacts available
OfficeCAN
Organization / Agency
Region of Waterloo
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
Qualified General Contractors and Mechanical sub-contractors are invited to submit PRE-QUALIFICATION information for the construction of a new administration building including a SCADA Control Centre for the Kitchener Wastewater Treatment Plant (KWWTP), located at 368 Mill Park Dr., Kitchener, ON.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full-motion Weapons System Trainer flight simulator facility for the HC-130J aircraft at USCG Base Elizabeth City, North Carolina. The facility will be approximately 13,000 gross square feet and will include a simulator bay for a Government Furnished, Government Installed mobile simulator, as well as classrooms, debriefing areas, administrative offices, and various support spaces for mechanical, electrical, and telecommunications systems. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued under the DHS National Multiple Award Construction Contract III, Pool Two, with a magnitude estimate of approximately 16 million dollars and a period of performance of 719 calendar days from award. Key technical requirements include the integration of a manufacturer-specific Siemens Building Automation System to ensure compatibility with existing installation-wide systems and compliance with UFC 4-010-06 for cybersecurity of facility-related control systems. The award will be based on a best-value tradeoff between price and non-price factors, specifically focusing on planning, organization, communication, and the contractor's construction approach. Security requirements are stringent, requiring all on-site personnel to be US citizens, with specific registration through RAPIDGate for long-term access and the signing of non-disclosure agreements for sensitive information. Quality control is managed through a rigorous system complying with FAR 52.246-12 and various ASTM standards for materials testing.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work including the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine, all featuring overhead cranes. Additional requirements include the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical scope covers extensive site preparation, specialized foundations using rigid inclusions and load transfer mats, electrical utilities, and mitigation for impacted wetlands. The contract duration is set for 1828 calendar days and encompasses a wide range of trades, from demolition and abatement to mechanical, electrical, and structural steel work. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB firms under NAICS code 236220. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to receive the bid invitation and access the necessary project documents.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Region of Waterloo

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS