Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oklahoma was posted on August 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Prequalification For Water Pipeline Line Stop And Temporary Bypass

Closed
RFQ-PREQUALIFICATION-2024.02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves prequalification for installing water pipeline line stops and temporary bypass connections to an existing 60-inch Ductile Iron Pipe (DIP) water transmission main. The scope includes installing and maintaining two line stops at two separate locations, as well as establishing and managing two temporary bypasses that connect the active 60-inch DIP waterline to a newly constructed 60-inch steel water transmission main. The project aims to ensure continuous water flow and system integrity during pipeline modifications or upgrades. The solicitation, issued by the City of Oklahoma City and its Trusts, is open to qualified contractors with a project size estimated between $500,000 and $1,500,000. Respondents who previously submitted a response to RFQ-PREQUALIFICATION-2024.01 are not required to reapply. The deadline for responses is September 11, 2024, and additional project details can be accessed through the provided link.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCity of Oklahoma City and its Trusts
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Prequalification to install Water Pipeline LIne stop and temporary bypass connecting to existing 60-inch Ductile Iron Pipe. Install and maintain, line stops (2) per connection at two locations and will install and maintain temporary bypasses (2) connecting to existing active waterline 60-inch DIP water transmission main to a newly constructed 60-inch Steel water transmission main.  
NOTE: Applicants that responded to RFQ-PREQUALIFICATION-2024.01 need not reapply.  

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS