Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Professional Services, Testing, Balancing, and Commissioning Services for Various Projects

Active
2026-263State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Collin County, Texas, is soliciting professional services for Testing, Adjusting, and Balancing (TAB) and Building Commissioning (Cx) for various projects on an as-needed basis. Managed by the Construction and Projects department, these services ensure that public works and county-owned facilities meet design intent and state energy codes. The scope of work primarily covers base building systems, including HVAC, chilled water, condenser water, hot water, and HVAC control systems, with optional add-ons for electrical power distribution, lighting controls, fire alarms, security, and communication systems. Commissioning services must follow the ACG Commissioning Guideline and are executed across five phases: pre-design, design, construction, acceptance, and post-acceptance. The selection process is based on a points-based evaluation of demonstrated competence and qualifications, with the highest weight placed on performance on past representative projects. The County will select the most highly qualified provider and subsequently negotiate a fair and reasonable price in accordance with Texas Local Government Code 2254.004. Proponents must hold commissioning certification from the AABC Commissioning Group (ACG) and submit a Statement of Qualifications not exceeding 25 pages. The resulting professional services agreement requires monthly invoicing with supporting documentation and compliance with the Texas Government Code regarding payments. All work must adhere to the highest engineering standards and comply with federal, state, and local laws, including the Americans with Disabilities Act.

General Info

Collin County seeks qualified professionals for TAB and building commissioning services as needed.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

5

Collin County Engineering Services Agreement

PDF, High priority: read this firstcontract-document
High

Collin County RFQ 2026-263: Professional Services, Testing, Balancing, and Commissioning Services

PDF, High priority: read this firstrfq
High

Collin County RFQ 2026-263 Legal Notice - Testing, Balancing, and Commissioning

DOCX, Low priority1 page · presolicitation
Low

Conflict of Interest Questionnaire for Local Government Vendor

PDF, Low priority2 pages · conflict-of-interest-questionnaire
Low

IRS Form W-9 Request for Taxpayer Identification Number and Certification

PDF, Low priority6 pages · tax-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Construction and Projects
Contacts1 person available
OfficeMcKinney, TX, 75071, USA
Office AddressMcKinney, TX, 75071, USA
Contacts

Full Description

Show more
Collin County , Texas, Testing, Adjusting, and Balancing (TAB) and Building Commissioning (Cx) are mandatory quality-control processes managed through the Collin County Construction and Projects department and governed by strict county construction standards and state energy codes. These procedures ensure that public works, commercial sites, and county-owned facilities operate efficiently and meet design intent.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Texas → Construction and Projects

Same awarding agency

NAICS: 238190
New
SLED
Construction, CCSO Subsurface Water Intrusion
Solicitation # 2026-404
Collin County, Texas, has issued Invitation for Bid 2026-404 for the Construction, CCSO Subsurface Water Intrusion project. The contract involves providing all labor, supervision, materials, and equipment to repair moisture-related deterioration at the lower level of the south side of a building, following previous unsuccessful waterproofing attempts. The project has a probable construction cost of 200,000 dollars, and for evaluation purposes, a 100,000 dollar allowance for unknowns is added to all bids. The contract will be awarded to the lowest and best responsible bidder based on compliance with requirements, completion time, bidder qualifications, and proposed subcontractors. The selected contractor must provide a performance bond, payment bond, and a two-year maintenance bond within ten days of the award, and demonstrate acceptable insurance coverage 24 hours before starting work. Performance requirements include adhering to the Construction General permit TXR150000 and MS4 permits, as well as providing a trench safety plan sealed by a Texas Professional Engineer. All materials must be delivered in original, unbroken packaging and stored on raised platforms to prevent moisture exposure. The project timeline begins ten calendar days after the Notice to Proceed, and the contractor must submit a detailed progress chart prior to that notice. Compliance with E-Verify and ADA regulations is mandatory, and failure to pay stipulated wage rates will result in a penalty of 60 dollars per day per worker.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
SLED
Construction, CCADF Sprinkler Heads Replacement
Solicitation # 2026-389
Solicitation 2026-389 is an Invitation for Bid issued by Collin County, Texas, for the replacement of institutional sprinkler heads within Clusters 1, 3, 4, and 5 of the Collin County Jail in McKinney. The project is driven by the need to reduce maintenance costs and prevent inmate tampering by installing current tamper-resistant models. The estimated construction cost is 150,000 dollars. The contractor is responsible for providing all labor, materials, and equipment, ensuring the system is designed in accordance with NFPA 13 requirements. Work must commence within ten calendar days of a written Notice to Proceed, which is issued after the delivery of executed contracts, insurance proof, a progress schedule, and required bonds. The contract requires performance and payment bonds each totaling 100 percent of the contract price, and bidders must adhere to Texas prevailing wage laws and E-Verify employment eligibility requirements. All equipment must bear UL listing or marking, and specific storage protocols are mandated to prevent rust and damage, including a three-inch clear space below stored piping. The Architect serves as the Owner's Representative to verify work quality and compliance. Bids must be submitted via the OpenGov portal or as signed hard copies in sealed envelopes by the November 19, 2026, deadline. Evaluation factors include the bidder's ability to meet minimum responsibility standards and the submission of a Conflict of Interest Questionnaire.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

7 days ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS