Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Proposed Amended Rule (PAR) 1135 – Emissions of Oxides of Nitrogen from Electricity Generating Facilities

Forecast
2016071006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Moreno Compressor Modernization Project is a joint initiative by San Diego Gas and Electric and Southern California Gas Company to modernize the Moreno Compressor Station in Moreno Valley, California. The project is designed to ensure compliance with South Coast AQMD Rules 1100, 1110.2, and 1134 regarding the reduction of nitrogen oxide emissions. The scope is divided into two primary components: the SDG&E Component and the Southern California Edison Component. The SDG&E Component involves constructing a new Plant 4 featuring two gas turbines with Selective Catalytic Reduction systems, two electric-motor-driven reciprocating compressors, and two natural gas-fired emergency engines with Non-Selective Catalytic Reduction systems. Upon completion, nine existing compressors and four emergency engines will be decommissioned and abandoned in place. The Southern California Edison Component focuses on enhancing the electrical infrastructure to improve reliability and resilience for the station. This work is executed in three phases: establishing temporary construction power via the Ginger 12-kV circuit, upgrading that circuit to a 12-kV super circuit through the installation of approximately three miles of additional circuitry and the replacement of roughly 50 distribution poles, and implementing permanent circuit upgrades including 4,800 feet of new overhead conductor. The project has undergone comprehensive environmental evaluation under CEQA, with the South Coast AQMD issuing a Notice of Determination to certify that the electrical modifications meet all necessary environmental and mitigation standards.

General Info

SDG&E and SoCalGas are modernizing Moreno Compressor Station to reduce emissions and upgrade power.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → South Coast Air Quality Management District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Farzaneh KhalajAir Quality Specialist

Full Description

Show more
San Diego Gas & Electric (SDG&E) owns and Southern California Gas Company (SoCalGas) operates an integrated natural gas delivery system consisting of pipelines, storage fields, compressor stations, and regulator stations which are interconnected and jointly managed as a single system. In accordance with the requirements to reduce emissions of nitrogen oxides (NOx) according to the specified timelines as set forth in South Coast AQMD South Coast AQMD Rule 1110.2 – Emissions from Gaseous- and Liquid-Fueled Engines, Rule 1100 – Implementation Schedule for NOx Facilities, and Rule 1134 – Emissions of Oxides of Nitrogen from Stationary Gas Turbines, SoCalGas and SDG&E have jointly proposed the Moreno Compressor Modernization Project (MCM Project) to modify and modernize the Moreno Compressor Station (MCS). The MCM Project is comprised of two components: 1) the SDG&E Component to upgrade the existing compressor system and make other ancillary improvements primarily located within the MCS that will be constructed and operated by SDG&E; and 2) the Southern California Edison (SCE) Component to make improvements to the electric utilities located around the MCS that will be constructed and operated by SCE. The SDG&E Component seeks to construct new Plant 4 to be comprised of: 1) a new compressor building to house: a) two new compressor gas turbines, each rated at 5,825 horsepower (HP) (South Coast AQMD Application Numbers (A/Ns) 629922 and 629924); b) two Selective Catalytic Reduction (SCR) systems with oxidation catalyst, and a Continuous Emissions Monitoring System for NOx (A/Ns 629923 and 629925); and c) new connections to an existing storage tank under South Coast AQMD Permit Number (P/N) G73134 to supply aqueous ammonia to the new SCR systems; 2) another new compressor building to house two new electric-motor-driven reciprocating compressors, each rated at 4,250 HP, which do not require South Coast AQMD permits because no emissions are expected; 3) a concrete pad adjacent to the new compressor building with: a) two new natural gas-fired emergency engines, each rated at 824 HP, (A/Ns 629926 and 629928); and b) two Non-Selective Catalytic Reduction systems (A/Ns 629927 and 629929); and 4) other ancillary improvements. After the new equipment becomes fully operational, the following equipment will be decommissioned: nine existing compressors referred to as Units D1 to D4 under P/N E03678, Unit D5 under P/N G21244, Unit D6 under P/N G21245, Unit D7 under P/N G21246, Unit D8 under P/N G21247, and Unit D9 under P/N G21248; and four existing natural gas-fired emergency engines referred to as Unit D12 under P/N D41508, Unit D13 under P/N G32495, Unit D14 under P/N D41509, and Unit D15 under P/N G35582. All decommissioned equipment will be abandoned in place. The environmental impacts from the SDG&E Component were previously analyzed in the Final Subsequent Environmental Assessment for Proposed Amended Rule 1110.2 – Emissions from Gaseous- and Liquid-Fueled Engines, and Proposed Amended Rule 1100 – Implementation Schedule for NOx Facilities (November 2019 Final SEA for PAR 1110.2 and PAR 1100), which was certified by the South Coast AQMD Governing Board on November 1, 2019, and the Final Subsequent Environmental Assessment for Proposed Amended Rule 1134 – Emissions of Oxides of Nitrogen from Stationary Gas Turbines (April 2019 Final SEA for PAR 1134), which was certified by the South Coast AQMD Governing Board on April 5, 2019. Both of these documents tier off of the Final Program Environmental Impact Report for the 2016 Air Quality Management Plan (March 2017 Final Program EIR for the 2016 AQMP), which was certified by the South Coast AQMD Governing Board on March 3, 2017. Notices of Decision for the November 2019 Final SEA for PAR 1110.2 and PAR 1100, and for the April 2019 Final SEA for PAR 1134 were filed with the Office of the Secretary for Resources for posting, and a Notice of Determination for the March 2017 Final Program EIR for the 2016 AQMP was filed and posted with the Clerks of the Counties of Los Angeles, Orange, Riverside and San Bernardino and the Governor’s Office of Planning and Research – State Clearinghouse. As such, the CEQA evaluation of the SDG&E Component is complete and is not the focus of the Addendum to the November 2019 Final Subsequent Environmental Assessment for Proposed Amended Rule 1110.2 and Proposed Amended Rule 1100, the April 2019 Final Subsequent Environmental Assessment for Proposed Amended Rule 1134, and the March 2017 Final Program Environmental Impact Report for the 2016 Air Quality Management Plan (Addendum) which has been prepared for the SCE Component of MCM Project or this Notice of Determination. The SCE Component proposes the following three phases of modifications to the existing Ginger 12 kilovolt (kV) circuit: A. Temporary construction power: Extend the existing Ginger 12-kV circuit from the existing electrical poles on Virginia Street to specifically provide electricity to the temporary construction laydown areas in support of the construction of the MCM Project. Temporary construction power will be located completely within the Facility and will involve: 1) less than 50 feet of underground trenching; 2) installation of temporary power poles, metering equipment, and a step-down transformer to be located adjacent to the eastern boundary of the MCS; 3) removal and replacement of one existing distribution pole; 4) installation of one new permanent distribution pole; and 5) installation of one temporary distribution pole that will be removed after construction is complete. B. Ginger 12-kV super circuit: Upgrade/enhance the existing Ginger 12-kV circuit to a 12-kV “super circuit” to increase the reliability and resilience of the electrical supply to the MCS by: 1) installing approximately three miles of additional 12-kV circuit along portions of an approximately six-mile segment of the existing 12-kV circuit; 2) installing approximately eight new wood or composite fiberglass distribution poles; and 3) replacing approximately 50 distribution poles, and replacement of approximately five existing joint distribution/subtransmission poles with five wood joint distribution/subtransmission poles. Additionally, the Ginger 12-kV super circuit includes making additional circuit improvements along an approximately three-mile portion of the existing Ginger 12-kV circuit which include: 1) installation of a new conductor outside of SCE’s existing Moreno Substation; 2) installation of new cable within new and existing ducts along Ironwood Avenue; 3) installation of new overhead conductors; 4) replacing a switch along Ironwood Avenue; and 5) installing a voltage regulator south of Ironwood Avenue. In total, the additional circuit improvements involve replacing two existing joint distribution/subtransmission poles and installing three new wood or composite distribution poles along Ironwood Avenue. C. Permanent circuit upgrades: Install approximately 4,800 feet of new overhead conductor on up to 35 poles that currently carry one 115-kV circuit and one 12-kV circuit; potentially replace all 35 poles depending on their condition; and install one new 12-kV rated switch on one of the poles. SCE will also make minor circuit configuration adjustments, as needed, to integrate the Ginger 12-kV super circuit into the final grid configuration. The permanent circuit upgrades will occur subsequent to the Ginger 12-kV super circuit upgrades described in Section B. The SCE Component of the MCM Project was not previously analyzed in the November 2019 Final SEA for PAR 1110.2 and PAR 1100, the April 2019 Final SEA for PAR 1134, and the March 2017 Final Program EIR for the 2016 AQMP. Thus, South Coast AQMD has prepared an Addendum specific to the SCE Component of the MCM Project which tiers off of the November 2019 Final SEA for PAR 1110.2 and PAR 1100, April 2019 Final SEA for PAR 1134, and March 2017 Final Program EIR for the 2016 AQMP. As such, the SCE Component of the MCM Project is the focus of this Notice of Determination.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
On-Call Solid Waste Data Analysis and Economic Services
Solicitation # 26-202-S
Seattle Public Utilities is seeking an on-call consultant to provide expert research, economic analysis, modeling, and reporting services to support the city's Zero Waste goals. This five-year contract, with an estimated value of 625,000 dollars, focuses on leveraging extensive solid waste datasets to evaluate the effectiveness, equity, and feasibility of programs and financial incentives. The selected consultant will be responsible for conducting waste characterization, developing predictive economic models for tonnages and trip frequencies, and performing cost-benefit and risk analyses. Key deliverables include production-ready reproducible code for GitHub, plain-language reports, data visualizations, and industry publications. The procurement process requires a comprehensive proposal by November 13, 2026, evaluated on staff qualifications, technical approach, modeling proficiency, and a mandatory WMBE Inclusion Plan for contracts exceeding 343,000 dollars. Awardees must comply with strict City of Seattle standards, including ADA and WCAG digital accessibility, ethics codes, and specific insurance requirements such as Commercial General Liability. Work will be executed through individual Work Assignments issued on an on-call basis, with payments processed within 30 days of invoice receipt. Consultants must also certify no organizational conflicts of interest and adhere to federal and city debarment regulations.
Seattle Public Utilities

POSTED

about 11 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541620
New
SLED
BIG WAVE NEW BRIDGE
Solicitation # 2027-RFP - Big Wave Bridge-00211
The County of San Mateo, through the Planning and Building department, is soliciting proposals for a qualified consultant to secure resource agency and encroachment permits for the construction of the Big Wave New Bridge. Located at 386 Airport Street in Half Moon Bay, the bridge will span a wetland drainage area between a Big Wave parcel to the north and a County-owned parcel to the south to ensure pedestrian path continuity toward the Princeton area. This project is conducted under the conditions of approval for Planning Permit PLN2013-00451. It is important to note that the actual construction of the bridge and the application for the building permit are explicitly excluded from the consultant's scope of work. The contract has a term of one year, with an anticipated award date of November 24, 2026. Proposals must be submitted via the eProcurement portal by November 16, 2026, and must be divided into a technical proposal and a separate fee proposal. Award selection is based on a points-based scoring method where firm qualifications, project approach, proposed schedule, and price are each weighted at 25 percent. The County provides a procurement preference for local businesses and non-profits. All communications regarding the RFP must be handled through the authorized contact persons, Camille Leung and Amy Tang, or the eProcurement portal.
Planning and Building

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details

More opportunities from California → South Coast Air Quality Management District

Same awarding agency

NAICS: 924110
SLED
Cost Recovery Provision in the Proposed Addendum to the Cooperative Agreement Between the South Coast AQMD and the Ports of Long Beach and Los AngelesThe South Coast Air Quality Management District has established a cost recovery provision through an addendum to the Cooperative Agreement with the Ports of Long Beach and Los Angeles. Under this agreement, each port is required to allocate 20 million dollars, totaling 40 million dollars, to support regional off-port zero-emission truck charging and fueling infrastructure projects. These projects are specifically intended to support the off-port operations of zero-emission drayage trucks registered in the Ports Drayage Truck Registry. The South Coast AQMD is responsible for the management, distribution, monitoring, and reporting of the funds. To implement this provision, the South Coast AQMD and each port must enter into a memorandum of understanding covering project selection requirements, the process for uncommitted funds, reporting, public processes, and the term of the agreement. The South Coast AQMD is authorized to recover fund administration and project management costs through an administrative fee not exceeding 10 percent of the total project cost. This initiative is statutorily exempt from the California Environmental Quality Act under CEQA Guidelines Section 15273 and was approved by the South Coast AQMD Governing Board on August 7, 2026.
Administration of Air and Water Resource and Solid Waste Management Programs

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS