Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Protective Coating Application – Exterior Surfaces

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

A subcontract has been issued by the City of Independence, Missouri, for the application of weather-resistant, protective coating systems to the exterior surfaces of Filter No. 10, aimed at preventing corrosion and environmental degradation. The work requires the use of durable, long-lasting materials capable of withstanding harsh outdoor conditions to ensure the structural integrity and operational longevity of the facility. Bids must be submitted by August 25, 2026, with the solicitation posted on July 20, 2026, and are to be performed at the location of Filter No. 10 in Independence, Missouri. The North American Industry Classification System code 238990 indicates this is a specialized construction service, likely involving surface preparation, coating application, and inspection protocols to meet industry standards for protective finishes. All responsible contractors are invited to respond, with no set-aside provisions specified, and further details are available through the provided public procurement link.

General Info

Apply weather-resistant coating to Filter No. 10 in Independence, MO by August 25, 2026.

Agency

Missouri → City of IndependenceView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

MO, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → City of Independence
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → City of Independence
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Application of weather-resistant, protective coating systems to the exterior surfaces of Filter No. 10 to prevent corrosion and environmental degradation.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Confined Space Entry and Site Safety ComplianceThe contract requires the performance of waste cleanup operations within confined spaces, with strict adherence to atmospheric monitoring protocols and full compliance with Cal/OSHA safety standards, including the use of the official Confined Space Entry Checklist. All activities must prioritize worker safety through proper ventilation, gas detection, rescue preparedness, and documented entry procedures as mandated by state regulations. The work is specifically scoped for a site located in Butte, California, and demands experienced contractors capable of handling hazardous materials in restricted environments under high-safety protocol. This is a subcontract opportunity issued by the California Department of Transportation with a posting date of July 20, 2026, and a response deadline of August 6, 2026. The NAICS code 238990 indicates it falls under miscellaneous construction-related services, primarily targeting specialized environmental remediation and confined space access work. Participation is open to qualified subcontractors without set-aside restrictions, and all proposals must align with state-mandated safety and operational frameworks. The contract is accessible through the Cal eProcure portal, and successful bidders will be expected to execute work under the oversight of California DOT’s site-specific requirements.
California Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Missouri → City of Independence

Same awarding agency

NAICS: 237990
New
SLED
Courtney Bend Water Treatment Plant Paste Slaker ReplacementThe City of Independence, Missouri is soliciting bids for the replacement of paste slaker units and ancillary equipment at the Courtney Bend Water Treatment Plant under solicitation number 26042, with a response deadline of September 3, 2026. Bids must be submitted exclusively online via PublicPurchase.com, and paper, fax, or email submissions will not be accepted. A virtual bid opening will be held using Microsoft Teams, with login details provided. The NAICS code for this procurement is 237990, and it is classified as a solicitation under SLED government procurement. The contract requires full compliance with Missouri prevailing wage laws as outlined in Annual Wage Order No. 33, effective May 28, 2026, which mandates payment of at least one and one-half times the prevailing hourly rate for overtime work. Contractors must submit completed affidavits affirming adherence to Missouri’s prevailing wage requirements, and failure to do so disqualifies the bid. Additional mandatory certifications include confirmation of enrollment in E-Verify, prohibition on knowingly employing unauthorized aliens, and assurance that the bidder and its principals are not suspended or debarred by federal, state, or local authorities. Contractors must also certify they are not engaging in, and will not engage during the contract term, any boycott of goods or services from the State of Israel in compliance with Missouri Revised Statute 34.600. A payment, performance, and maintenance bond is required, with the contractor obligated to ensure all work endures without defects for a full year following completion and acceptance. Non-collusion and conflict of interest affidavits must be signed, affirming no financial interest by city officials and no collusion in the bidding process. While specific technical specifications, quantities, delivery schedules, and contract value are not provided in the documentation, the scope centers on supplying and installing new lime slaking units. The place of performance is in Jackson County, Missouri, and all compliance documentation must be submitted as part of the bid package.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details