This Solicitation opportunity from California was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Purchase of Pad Mounted and Overhead Power Capacitors
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Alameda, through its Engineering and Operations agency, is soliciting bids for the purchase of 15 kV class, three-phase switched power capacitor banks for a 60 Hz medium-voltage distribution system. The scope includes the delivery of five pad-mounted vacuum switched capacitor banks and two overhead mounted vacuum switched capacitor banks, both requiring SEL 734W microprocessor-based controllers. All equipment must be designed and tested according to ANSI, IEEE, NEC, and NEMA 3R standards, featuring corrosion-resistant construction and UV-resistant finishes. The contract requires a guaranteed lead time not exceeding 36 weeks from award to delivery at the AMP Service Yard, with a warranty period of 12 months from installation or 18 months from shipment. The agreement will be awarded to the lowest responsive and responsible bidder based on overall lump sum pricing, though the agency reserves the right to issue separate awards by capacitor type. A five percent preference is available for certified local businesses. Bidders must submit technical data sheets, delivery schedules, and experience references by November 4, 2026. Key administrative terms include NET 30 payment terms, F.O.B. Destination shipping with prepaid charges, and a requirement for the manufacturer to provide 48-hour notice prior to delivery. Final inspection and acceptance will occur at the buyer's plant following mandatory factory testing of insulation resistance, applied voltage, and functional controls.
General Info
Place of Performance
Set-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
44 mandatory49 requirements in 9 areas
- Submission11 · 11 must001
Quotation Validity Period
- Compliance6 · 6 must025
Binding Agreement Execution
- Quality Assurance5 · 5 must042
Equipment Warranty Period
- 46 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 49 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Supply of Shunt Capacitor Banks for Various SitesOpen now, due in 47 days
- Power Supply Unit (NSN 6130014909917) ManufacturingOpen now, due in 15 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Interested Companies (28)
See All 28 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from California → Engineering and Operations
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
