Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Purified Water Replenishment - San Jacinto Valley Advanced Water Purification Facility

Active
purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eastern Municipal Water District is soliciting bids for the Purified Water Replenishment project in California, which is divided into two primary components. Schedule A covers the San Jacinto Valley Advanced Water Purification Facility, encompassing grading, site work, process building construction, and comprehensive mechanical, electrical, and instrumentation services. Schedule B focuses on the PWR Brine Ponds, including site clearing, civil work, pond lining, and associated mechanical and electrical integration. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Bids will only be accepted from prequalified contractors and electrical subcontractors. The primary NAICS code is 237110, though several other industry classifications are applicable. Interested parties must submit their responses by October 20, 2026.

General Info

Bids for California water purification and brine pond construction due October 20, 2026.

Agency

Eastern Municipal Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEastern Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
Eastern Municipal Water District
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The work is comprised of two major components: San Jacinto Valley Advanced Water Purification Facility (SJVAWPF) and Brine Ponds. San Jacinto Valley Advanced Water Purification Facility work falls under Schedule A and includes, but is not limited to, grading and site work, construction of process building, mechanical work and equipment, pipeline work and equipment, electrical, instrumentation, control work and equipment, short-circuit, coordination, arc flash study, and process control and integration services. PWR Brine Ponds work falls under Schedule B and includes, but is not limited to, site clearing, civil work, pond lining, pond evaporator and mechanical work, site electrical, instrument and control work, short-circuit, coordination, arc flash study, and process control and integration services. Proposals (bids) for this project will only be accepted from prequalified Contractors and prequalified Electrical Subcontractors. For other subcontracting opportunities, please contact firms on the prequalified contractors list found in Volume 1 of Specification No. 1472W, which can be downloaded here: https://vendors.planetbids.com/portal/25577/bo/bo-detail/145417 In addition to NAICS code 237110, the following industry classifications are applicable: 237990, 238140, 238160, 238190, 238220, 238220, 238310, 238320, and 238330.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Technical and environmental services are also required, including surveying, testing and inspections, settlement monitoring, videography, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage their participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis.
Filanc

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the overall commissioning and disinfection of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, DBE, and DVB. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services. Point of contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements encompass drainage improvements, electrical upgrades, instrumentation and controls, piping systems, excavation of cobbles and boulders, welding, disinfection, and surface restoration. This opportunity is designated as a small business set-aside, specifically welcoming SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. James W. Fowler Co. provides support for M/W/DBE subcontractors in securing bonding, insurance, lines of credit, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project also encourages the utilization of apprentices and requires quality control testing.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details