PVRWRF Secondary Clarifiers 5, 6, and 8 Rehabilitation Project

Closed
1592SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

about 24 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contractor is required to perform comprehensive rehabilitation work on Secondary Clarifiers Nos. 5, 6, and 8 at the Perris Valley Regional Water Reclamation Facility, including the removal and replacement of all major mechanical components such as spiral scrapers, center columns, feedwells, bridges, scum troughs, baffles, weirs, and associated electrical and control systems. Only one clarifier may be worked on at a time to ensure continuous plant operation, and the contractor must use approved shop drawings provided by two pre-selected manufacturers without substitution, while also developing additional submittals for ancillary components not previously covered. The scope further includes removal and replacement of concrete foundations around center columns and the new RAS sump, rehabilitation of existing concrete surfaces, coating of effluent troughs, replacement of utility water piping, and the replacement and installation of sluice and stop gates upstream of each clarifier, along with other miscellaneous improvements detailed in the contract drawings and specifications. A bid bond of 10 percent is required, and all work must adhere strictly to the contract documents and drawings provided.

General Info

Rehabilitate three clarifiers one at a time using approved components and drawings, replace mechanical and concrete systems, install gates, and comply strictly with specifications.

Agency

California → Construction Department of Eastern Municipal Water DistrictView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

PVRWRF - 1301 Case Rd, Perris, CA 92570, CA, USA

Set-Aside

NONE

Documents

(13)

Specification No. 1592S - Perris Valley Regional Water Reclamation Facility Secondary Clarifiers Rehabilitation

PDFspecifications

Specification 1592S Proposal Package for Perris Valley Water Reclamation Facility

PDFrfp

Specification No. 15925 Perris Valley Secondary Clarifier Rehabilitation NIB

PDFnib

Appendix D - PVRWRF Plant 2 As-Builts_Part 3.pdf

PDF

Appendix F - PVRWRF Expansion Plant 3 As-Builts_Part2.pdf

PDF

Specification 1592S Pre-Bid Walk Sign-In Sheet

PDFsign-in-sheet

1592W Drawings.pdf

PDF

Appendix F - PVRWRF Expansion Plant 3 As-Builts_Part1.pdf

PDF

Appendix D - PVRWRF Plant 2 As-Builts_Part 2.pdf

PDF

Appendix E - PVRWRF Plant 2 Secondary Clarifier No. 8 As-Builts

PDFas-builts

Appendices A-C for Contract Submittals and Testing Results

PDFappendices

Appendix D - PVRWRF Plant 2 As-Builts_Part 1.pdf

PDF

Appendix G - PVRWRF Plant 3 Expansion Geotechnical Report

PDFgeotechnical-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Department of Eastern Municipal Water District
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Construction Department of Eastern Municipal Water District
View Agency Profile
Office AddressCA, USA
Contacts
Jennifer Morgenstern xContact

Full Description

Show more
Scope: SC-02 - Scope of Work. Under these Specifications the Contractor shall perform all work in accordance with these specifications and the contract drawings. The work is generally described as follows: A. Removal and replacement of secondary clarifier mechanisms and accessories within existing Secondary Clarifier Nos. 5, 6, and 8 at the Perris Valley Regional Water Reclamation Facility (PVRWRF), including new spiral scrapers, center column, feedwell, floor baffle, bridge, scum trough, scum baffle, scum weir, Stamford baffle, and electrical and control elements. B. The District has shortlisted two secondary clarifier mechanism manufacturers, which shall be used without equal. The District has entered into contracts with both manufacturers to obtain approved shop drawings (only) for the secondary clarifier equipment to expedite the schedule. The Contractor shall procure the secondary clarifier equipment using the approved shop drawings. The Contractor shall review the approved shop drawings and develop additional submittals as required for ancillary component associated with the clarifiers, which were not previously covered. The treatment plant must be kept in operation at all times, so only one clarifier may be worked on at a time. C. Removal and replacement of the concrete foundation around the center columns and new RAS sump. D. Rehabilitation of the existing concrete surface of the secondary clarifiers, as required. E. Coating of the secondary clarifier effluent trough, as indicated on the contract drawings. F. Replacement of the utility water piping supplying the secondary clarifiers. G. Replacement of existing sluice gates upstream of Secondary Clarifier Nos. 5, 6, and 8. H. Installation of new stop gates upstream of Secondary Clarifier Nos. 5, 6, and 8. I. Miscellaneous improvements to the secondary clarifiers, as shown on the drawings or listed in the specifications.
Notes: Bid Results will be available in PlanetBids once time for receiving bids has expired.
Bid Bond: 10.00%

More opportunities from California → Construction Department of Eastern Municipal Water District

Same awarding agency

NAICS: 237110
SLED
Matthews Transmission Pipeline
Solicitation # 1577W
The Eastern Municipal Water District is soliciting bids for Specification No. 1577W, a public works project in the City of Menifee, California, focused on the construction of three pressurized potable water pipelines: the Matthews Pipeline, the Watson Pipeline, and the Romoland Feeder Extension. The scope includes installing these pipelines and their connections to existing infrastructure, with the Matthews Pipeline specifically crossing Metrolink and SR-74/Caltrans rights-of-way. The project requires adherence to strict technical standards, including NSF 61 and NSF 600 approval for potable water materials and compliance with Cal Osha and ADA regulations. Environmental protections are a key component, requiring a CEQA Mitigation Monitoring and Reporting Program that includes biological surveys for burrowing owls and nesting birds, as well as the development of a Paleontological Resources Impact Mitigation Program. The contract will be awarded to the lowest qualified bidder based on the total bid price. Bids must be submitted electronically via PlanetBids by September 23, 2026, and must include a 10% bid bond submitted through Surety 2000. A mandatory site walk-through is scheduled for September 3, 2026, and attendance by a company employee is required for a bid to be considered responsive. Awarded contractors must provide performance and payment bonds equal to 100% of the contract amount and submit a quality-control plan within 10 days of the notice of award. Additional requirements include providing resumes for key personnel, adhering to prevailing wage rates, and submitting various certifications, including Cal Osha compliance history and, for larger contracts, certifications regarding economic sanctions.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS