This Solicitation opportunity from California was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PWAV Site Characterization Drilling Program (MW-1 and IW-1), and Drilling, Construction, Development and Testing of Well 37

Closed
22-654BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Palmdale Water District is soliciting bids for the Site Characterization Drilling Program for MW-1 and IW-1, along with the drilling, construction, development, and testing of Well 37, under solicitation number 22-654B. The work involves all labor, materials, and services necessary to install permanent well casings with corrosion protection, complete annular sealing using sand-cement grout, install lockable well covers and concrete surface seals, conduct aquifer pumping and injection tests to evaluate yield and efficiency, chemically disinfect the wells per regulatory standards, and fully restore the site after construction. The project must comply with California Department of Water Resources Bulletins 74-81 and 74-90, as well as industry standards from AWWA, NSF/ANSI, and ASTM, and all applicable federal, state, and local regulations. The contract award will follow the Lowest Price Technically Acceptable (LPTA) method, where responsiveness and responsibility are mandatory thresholds—proposals missing required documentation such as equipment source information, site inspection logs, or insurance and bonding certificates will be rejected without further evaluation. Bidders must submit all documentation electronically via the OpenGov portal by the deadline of August 18, 2026, and must affirmatively certify compliance with multiple conditions, including non-collusion, electronic signature consent, sanctions compliance under Executive Order N-6-22, and adherence to Iran Contracting Act restrictions, each triggering specific submission requirements. Prior to mobilization, contractors must secure approvals for construction schedules, drilling permits, safety plans, and noise abatement measures, and are prohibited from subcontracting with debarred entities. The contractor assumes full responsibility for safety, compliance, and liability throughout the project, with final acceptance occurring on-site after inspection and approval by the District’s Engineer, who acts as the sole authority on work quality and conformity. While no formal FAR clauses or federal accounting identifiers are included, the contract references local requirements such as payment requests through the CIPO system, bonded insurance coverage, and indemnification obligations, reflecting its status as a municipal, rather than federal, procurement. Payment details, contract value, and FOB terms are not specified in the solicitation, and no formal contract type such as firm fixed price is declared, though the structure and LPTA evaluation imply a fixed-price arrangement. The scope is confined to the District’s property in Palmdale, California, with no indication of additional locations or

General Info

Palmdale Water District seeks proposals for PWAV Site Characterization Drilling by May 30, 2026.

Documents

27

20251111_PWD_PWAV_Field_Testing_Specs_FINAL Technical Specifications

PDF, High priority: read this firstspecifications
High

2026 Community Workforce Agreement - Palmdale Water District

PDF, High priority: read this firstcontract-document
High

Addendum No. 1 for Palmdale Water District Drilling Project

PDF, High priority: read this firstaddendum
High

Agreement Specification No. {Spec No.} - Palmdale Water District

PDF, High priority: read this first9 pages · contract-document
High

Conceptual Well Design Profile MW-1 Addendum 3

PDF, High priority: read this firstspecifications
High

Equipment Material Source Information Form

PDF, High priority: read this first1 page · equipment-material-source-form
High

ITB 22-654B PWAV Site Characterization Drilling Program

PDF, High priority: read this firstitb
High

ITB 22-654B PWAV Site Characterization Drilling Program

PDF, High priority: read this firstitb
High

ITB 22-654B PWAV Site Characterization Drilling Program

PDF, High priority: read this firstitb
High

ITB 22-654B PWAV Site Characterization Drilling Program

PDF, High priority: read this firstitb
High

ITB 22-654B PWAV Site Characterization Drilling Program and Well 37 Construction

PDF, High priority: read this firstitb
High

Palmdale Water District Community Workforce Agreement 2019

PDF, High priority: read this firstcontract-document
High

Palmdale Water District Community Workforce Agreement Letter of Assent

DOCX, High priority: read this firstletter-of-assent
High

Palmdale Water District Standard Specifications for Water Distribution System Construction January 2024

PDF, High priority: read this firstspecifications
High

PWD List of Approved Materials 2025

PDF, High priority: read this firstapproved-materials-list
High

PWD PWAV Full-Scale Injection Well IW-1 Technical Specifications Volume 2

PDF, High priority: read this firstspecifications
High

PWD PWAV Monitoring Well MW-1 Technical Specifications Volume 1

PDF, High priority: read this firstspecifications
High

PWD Standard Specification Drawings July 2025

PDF, High priority: read this firstspecifications
High

PWD Standard Specifications for Water Distribution System Construction July 2025

PDF, High priority: read this firstspecifications
High

Standard Specification Drawings for Water Meter and Fire Hydrant Installations

PDF, High priority: read this firstspecifications
High

Technical Specifications Volume 3 - Palmdale Water District Well 37

PDF, High priority: read this firstspecifications
High

2026 CWA Letter of Assent Template

PDF, Low priorityletter-of-assent
Low

Executive Order N-6-22 on Russia-Ukraine Sanctions Compliance

PDF, Low priority4 pages · executive-order
Low

Pre-Bid Meeting Sign-In Sheet for 22-654B Well 37 July 21, 2026

PDF, Low prioritypre-bid-sign-in-sheet
Low

Pre-Bid Meeting Sign-In Sheet for 22-654B Well 37 July 28, 2026

PDF, Low prioritypre-bid-sign-in-sheet
Low

PWD List of Approved Materials for Water System Components

PDF, Low priorityapproved-materials-list
Low

Vendor Contact and Certification List for Drilling Services

CSV, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 30, 2026 to Aug 18, 2026. The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering
Contacts2 people available
OfficePalmdale, CA, 93550, USA
Organization / AgencyCalifornia → Engineering
Office AddressPalmdale, CA, 93550, USA
Contacts
Shadi BaderEngineering Manager/Grant Writer
Jennifer VillaManagement Analyst

Interested Companies (28)

DXP EnterprisesAnaheim, CA
Yellow Jacket Drilling ServicesRancho Cucamonga, CA
Best Drilling and PumpColton, CA

See All 28 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Palmdale Irrigation District was formed in 1918 under the provisions of Division 11 of the Water Code of the State of California to supply irrigation water to the approximately 4,500 acres of agricultural land within its boundaries. Under this Code, the District's primary functions were, and continue to be, to acquire, control, conserve, store, and distribute water for the beneficial use of inhabitants and water users within the District. The Palmdale Water District (District) is an independent special district governed by a five-member Board of Directors who serve the public by division. Special districts provide accountability and a means to vote selectively and provide customers the opportunity to express their preferences more precisely. The most basic virtue of a special district is to allow citizens to customize government to suit their needs.

More opportunities from California → Engineering

Same awarding agency

NAICS: 236220
New
SLED
Public Safety Center - Market Sounding Survey
Solicitation # 27-007
The City of Hayward is conducting a Market Sounding Survey via Request for Information 27-007 to gather industry feedback on the feasibility and delivery structure of a proposed Public Safety Center. This project aims to replace the obsolete Hayward Police Headquarters with a new facility featuring a police headquarters, an indoor shooting range, and expanded services for the Youth and Family Services Bureau. Conceptual designs suggest a total building size of 98,712 square feet, with the CANG site recommended over the City Center site due to budget and parking advantages. Estimated project costs range from 247 million dollars for the CANG site to 352 million dollars for the City Center site. The City is specifically exploring a public-private partnership delivery method and requires responses from interested firms by November 13, 2026. Submissions must be made electronically through the OpenGov portal and should include a firm profile, risk assessments, and key personnel resumes. Compliance requirements include adherence to ADA upgrades, DIR registration for prevailing wage projects, and certifications regarding nondiscriminatory affirmative action and non-involvement in nuclear weapons development. This RFI is for informational purposes and does not constitute a formal solicitation or a guarantee of a future contract award.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS