Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from North Carolina was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Irwin Creek Stormwater Improvements Project

Closed
FY26-ITBCon-43State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
WPCP IMPROVEMENTS-ARPA-SFRF WASTEWATER INFRASTRUCTURE PROJECT PHASE 2
Solicitation # PE-61055-NONST-2027-000000004
The City of Ray City is soliciting sealed bids for the ARPA-SFRF Wastewater Infrastructure Project Phase 2, which focuses on Wastewater Treatment Plant (WPCP) improvements. The scope of work requires the provision of all necessary labor, materials, and equipment to complete various upgrades, including influent pumping station modifications, bypass pumping, the construction of new plant headworks with mechanical and manual bar screens, flow metering equipment, and automatic wastewater samplers, as well as associated sitework and surface restoration. Bids must be submitted to the City Clerk at Ray City Hall no later than 2:00 PM local time on September 11, 2026. Any bids submitted after this deadline will be disqualified, and once the closing time has passed, no bid may be withdrawn for a period of sixty days. To be considered a certified bidder, interested parties must obtain a formal bid package directly from the project engineer, Coastal Engineering Consultants, Inc. While electronic copies of the documents are available via email at no cost, full printed sets of the plans and specifications can be purchased for a non-refundable fee of $150.00 to cover printing and shipping. Contract documents are also available for examination at the Ray City Hall. This solicitation is managed by the City of Ray City, Georgia, and serves as a critical component of the city's wastewater infrastructure enhancement efforts.
City of Ray City

POSTED

about 6 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
INVITATION TO BID - Blackwater River Pump Station Improvements
Solicitation # invitation-bid-blackwater-river-pump-station-improvements
Crowder Construction Company is soliciting bids from certified Minority and Women-Owned Business Enterprise (M/WBE) firms for the Blackwater River Pump Station Improvements project located in Virginia. The company is seeking subcontractors and suppliers for various trades, including erosion control, hauling, demolition, asphalt paving, masonry, coatings, roofing, HVAC, and electrical work. To encourage participation, Crowder Construction is willing to adjust the scope of work by breaking down or combining elements into economically feasible units. Interested firms are requested to include a copy of their certification with their submission and may review project plans and specifications either online or in person by scheduling an appointment. All quotes must be submitted to the Crowder Construction Company office no later than September 2, 2026, at 3:00 PM. The company has expressed a willingness to negotiate terms with responsible bidders and offers support for firms needing assistance with bonding, insurance, or capital. Additionally, quick pay agreements are available to help subcontractors and suppliers manage cash flow demands. Prospective bidders should contact McKenna Lackey via email or phone to indicate their intent to bid or to request further information regarding the project requirements.
Crowder Construction Company

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
Sanitary Sewer & Recycled Water Project in CA
Solicitation # sanitary-sewer-recycled-water-project-ca
Garney Pacific, Inc. is soliciting subcontractor quotes for the Sanitary Sewer and Recycled Water Project located in Colusa, California, on behalf of the City of Colusa. The scope of work involves general construction and the installation of approximately 13,000 linear feet of infrastructure, including new sewer gravity mains, recycled water mains, sewer force mains, and sewer manholes, as well as pavement grinding and overlay. This solicitation is categorized under NAICS code 237990 and includes various small business set-aside opportunities, such as Small Disadvantaged Business, Women-Owned Small Business, HUBZone, and Veteran-Owned Small Business designations. Interested subcontractors must submit their quotes by the deadline of September 1, 2026, at 3:00 PM PT. All participating subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. While Garney Pacific, Inc. will reimburse subcontractors for required bond premiums, bidders must provide their bond rate at the time of the quote. The contract will be governed by Garney Standard Purchase Order and Subcontract forms, and any proposed exceptions to these terms must be submitted as redlines and comments alongside the bid. Participation from Disadvantaged Business Enterprise (DBE) firms is highly encouraged.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project is a firm-fixed-price solicitation issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work involves mobilization and demobilization, dredging and ocean disposal of approximately 4,260 cubic yards of material, and repairs to the revetted mole, including stone rework, vegetation removal, and CRM wall repair. The project is located in Haleiwa, Oahu, Hawaii, and has an estimated value between $1,000,000 and $5,000,000. The performance period is set for 200 calendar days from the date of the Notice to Proceed. This solicitation is an Invitation for Bid (IFB) intended for small businesses, including various set-asides such as Small Disadvantaged Business, Women-Owned Small Business, HUBZone, and Veteran-Owned Small Business. Contractors are required to adhere to strict technical, safety, and administrative standards. Key personnel, including a Project Manager, Project Superintendent, Quality Control Manager, and Site Safety and Health Officer, must be proposed and are subject to government approval. Safety compliance must meet USACE EM 385-1-1 standards, and contractors must submit monthly exposure reports to avoid payment retentions. Quality control involves a three-phase inspection process, and all stone materials must meet specific ASTM international standards. Additionally, bidders must provide a bid guarantee and are required to furnish performance and payment bonds. The contract is subject to the Davis-Bacon Act regarding prevailing wages, and the government reserves the right to reject unsuitable materials at various stages of the project.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is soliciting subcontractor bids for the SBWRP Reverse Osmosis System project located in San Diego, California. The project, owned by the City of San Diego, involves the design and removal of existing trailer-mounted Electrodialysis Reversal (EDR), slab-mounted Membrane Filtration (MF), and Reverse Osmosis (RO) units. These will be replaced with new slab-mounted MF and RO units to create a demineralization facility at the South Bay Water Reclamation Plant, specifically aimed at reducing the total dissolved solids in reclaimed water. The estimated bid value for this project is $19,300,000.00. Garney Pacific is seeking quotes for a wide range of trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. As a general contractor, Garney Pacific, Inc. is actively seeking participation from SLBE and ELBE firms, including those with DBE, MBE, WBE, or SBE certifications. The solicitation includes various set-aside categories such as Small Business, Women-Owned Small Business, and Veteran-Owned Small Business. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. While Garney will reimburse subcontractors for bond premiums, bidders must provide their bond rate at the time of their quote. The basis of contracting will be the Garney Standard Purchase Order and Subcontract forms. The deadline for bid submissions is August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Irwin Creek Stormwater Improvements Project involves the installation and upgrading of stormwater infrastructure at the Irwin Creek WWTP, specifically targeting three stormwater outfall locations. The work includes constructing a new manhole pump station at outfall 1 with associated pumps, piping, valves, and civil, electrical, and instrumentation systems, as well as retrofitting existing manholes at outfalls 2 and 3 with permanent pumping systems, discharge piping, valves, and new manhole lids. The entire scope requires complete integration of aboveground and buried infrastructure, with all work to be performed on-site in Charlotte, North Carolina. Bids must be submitted as sealed physical documents by 10:00 A.M. on August 4, 2026, to the Contracts Administration Section at 5100 Brookshire Boulevard, Charlotte, NC, as electronic submissions via the BonfireHub portal are prohibited for construction bids. The solicitation, issued on July 7, 2026 under FY26-ITBCon-43, is classified under NAICS code 237990 and administered by the City of Charlotte’s Charlotte Water department. Addendum No. 1, issued on July 9, 2026, removed all references to the Charlotte Business Inclusion Program and its associated MWSBE participation goal, streamlining bidder requirements. Bidders are required to submit CBI Form 3 within 24 hours after bid submission as a conditional requirement, though no minimum participation threshold now exists. The project does not specify a contract value, pricing structure, delivery schedule, or formal evaluation factors in the available materials, and no standard FAR clauses, packaging requirements, inspection criteria, or payment office details are provided. The procurement follows a traditional Invitation to Bid format, implying a Firm-Fixed-Price contract, but the exact award basis, contract type, and technical standards are not explicitly stated in the disclosed documentation. Only Laura Osborne from Charlotte Water is listed as a point of contact, with no designated COR, COTR, or PCO identified.

General Info

Install stormwater infrastructure at Irwin Creek WWTP outfalls in Charlotte, NC; sealed bids due August 4, 2026.

Agency

North Carolina → City Of CharlotteView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

NC, USA

Set-Aside

NONE

Documents

(4)

Addendum No. 1 FY26-ITBCON-43 Irwin Creek Stormwater Improvements Project

PDFamendment

Pre-Bid Attendance.pdf

PDF

Charlotte Water Construction Invitation to Bid - Procurement Portal Instructions

PDFspecial-notice

C-111 Advertisement for Bids - Irwin Creek Stormwater Improvements Project

PDFadvertisement-for-bids

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City Of Charlotte
Contacts1 person available
OfficeNC, USA
Organization / Agency
North Carolina → City Of Charlotte
View Agency Profile
Office AddressNC, USA
Contacts
Laura Osborne

Full Description

Show more
The Project consists of installing and upgrading the Irwin Creek WWTP stormwater system. The work to be included in this project is: 1. Construction of one new manhole pump station, including installation of one manhole, pumps, piping, and valves at the stormwater outfall 1 location. 2. Installation of permanent pumps, discharge piping, valves, and manhole lid replacement within the existing manhole at the stormwater outfall 2 location. 3. Installation of permanent pumps, discharge piping, valves, and manhole lid replacement within the existing manhole at the stormwater outfall 3 location. 4. Construction and installation of all buried discharge piping (outfall location 1), civil, electrical, and instrumentation.

More opportunities from North Carolina → City Of Charlotte

Same awarding agency

NAICS: 423120
New
SLED
CATS Bus Operations Bus Air Conditioning and Heating Parts
Solicitation # 269-2027-2186
The Charlotte Area Transit System Bus Operations Division (CATS-BOD) has issued solicitation 269-2027-2186 for a unit price, indefinite quantity contract to supply air conditioning and heating components for transit buses. The contract, effective February 26, 2027, covers a wide range of parts from manufacturers such as Thermo King, Carrier, and NFI, including blowers, compressors, coils, filters, and various gaskets and valves. This is a procurement for an indefinite amount with no minimum purchase requirement, where the City of Charlotte will issue specific quantities through individual purchase orders. The City intends to award the contract to the lowest responsive and responsible bidder, evaluating factors such as vendor experience, quality, delivery, workmanship, and inventory control capabilities. Suppliers must adhere to strict regulatory and administrative requirements, including Buy America certification for iron, steel, and manufactured products, as well as compliance with various federal non-discrimination, accessibility (ADA), and anti-lobbying laws. All shipments must be made FOB Destination, with the vendor responsible for ensuring packaging is sufficient to prevent damage and that all cartons are clearly marked with the purchase order number and department name. The contract includes a minimum one-year manufacturer warranty on all components, and the vendor is responsible for administering warranty claims at no cost to the City. Additionally, vendors must maintain specific insurance coverage, including automobile liability and pollution coverage, and must submit invoices within sixty days of delivery to ensure payment within the City's thirty-day terms.
Motor Vehicle Supplies and New Parts Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in about 1 month
View Details