Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from North Carolina was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Severn-Tyndale SDIP

Closed
FY27-ITBCON-08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work involves mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and the installation or reworking of stone to fill voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The project is located in Haleiwa, Oahu, Hawaii, and is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified entities under NAICS code 237990. The contract requires a rigorous quality control and inspection process consisting of preparatory, initial, and follow-up phases, culminating in punch-out, pre-final, and final acceptance inspections. Contractors must adhere to specific ASTM standards for stone materials and comply with USACE EM 385-1-1 safety regulations, including the appointment of a Site Safety and Health Officer with an OSHA 30-hour certification. Key personnel, such as the Project Manager and Quality Control System Manager, are subject to approval by the Contracting Officer. Financial terms include monthly invoicing and a liquidated damages penalty of 2,297 dollars per calendar day of delay. Bidders must provide a bid guarantee and subsequent performance and payment bonds to ensure contract fulfillment.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is serving as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19,300,000.00 dollars, the project scope involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks subcontractors for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. All subcontractors must utilize union labor and be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. The project strongly encourages participation from SLBE, ELBE, DBE, MBE, WBE, and SBE certified firms, and offers assistance to these firms in obtaining bonding lines of credit or insurance. Bids are due by August 27, 2026, at 2:00 PM PT, and will be based on Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Severn-Tyndale Storm Drainage Improvement Project (SDIP) involves replacing approximately 500 linear feet of undersized and deteriorating 48-inch to 66-inch corrugated metal pipe between Tyndale Avenue and Chandworth Road in Charlotte, North Carolina, to mitigate recurring residential flooding and enable upstream stormwater improvements currently in design that will resolve seven outstanding service requests for failing infrastructure. The estimated project cost is $11,500,000, with work including installation of new drainage structures such as precast box culverts, temporary water line relocation, and foundation protection at four specified properties. The solicitation, issued under the number FY27-ITBCON-08 and posted on July 7, 2026, requires physical bid submissions to be delivered by 2:00 p.m. on August 12, 2026, to the First Floor Conference Room at 5100 Brookshire Boulevard, Charlotte, NC 28216; electronic submissions through the city’s online portal are prohibited. The project is governed by municipal specifications including CLDS 20.03 and CLDS 10.17B, with implied adherence to NCDOT standards for manhole frames and asphalt paving. Special contract requirements under the Charlotte Business Inclusion (CBI) Program mandate compliance with MBE and WBE participation goals of 6% and 4% respectively, necessitating submission of a finalized CBI Form 3 within 24 hours if the goals are not met and requiring Letters of Intent for MWSBE self-performance. Bid security is required per Article 8 of the Instructions to Bidders, and while no formal contract type, evaluation factors, inspection protocols, packaging standards, or accounting codes are specified in the documentation, the point of contact for the procurement is Bridgette Maxie at the City of Charlotte’s Charlotte Water department. The place of performance is confined to the Severn and Tyndale Avenue areas within North Carolina, and all bids must comply with state regulations and local procurement procedures.

General Info

Replace 500 ft of aging storm pipe in Charlotte to stop flooding, cost $11.5M, MBE/WBE goals, bid due Aug 12, 2026.

Agency

North Carolina → City Of CharlotteView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

NC, USA

Set-Aside

NONE

Documents

(4)

FY27-ITBCON-08 Addendum No. 1 to Invitation to Bid

PDFamendment

Severn-Tyndale SDIP Electronic Bid Form PJ7530150039

XLSXebid-form

Severn-Tyndale Storm Drainage Improvement Project Advertisement for Bids

PDFadvertisement-for-bids

Charlotte Water Construction Invitation to Bid - Procurement Portal Instructions

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City Of Charlotte
Contacts1 person available
OfficeNC, USA
Organization / Agency
North Carolina → City Of Charlotte
View Agency Profile
Office AddressNC, USA
Contacts
Bridgette Maxie

Full Description

Show more
The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from Storm Water’s queue, which will address seven requests for service for failing infrastructure and flooding. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area. The estimated cost of the project is $11,500,000.

More opportunities from North Carolina → City Of Charlotte

Same awarding agency

NAICS: 423120
New
SLED
CATS Bus Operations Bus Air Conditioning and Heating Parts
Solicitation # 269-2027-2186
The Charlotte Area Transit System Bus Operations Division (CATS-BOD) has issued solicitation 269-2027-2186 for a unit price, indefinite quantity contract to supply air conditioning and heating components for transit buses. The contract, effective February 26, 2027, covers a wide range of parts from manufacturers such as Thermo King, Carrier, and NFI, including blowers, compressors, coils, filters, and various gaskets and valves. This is a procurement for an indefinite amount with no minimum purchase requirement, where the City of Charlotte will issue specific quantities through individual purchase orders. The City intends to award the contract to the lowest responsive and responsible bidder, evaluating factors such as vendor experience, quality, delivery, workmanship, and inventory control capabilities. Suppliers must adhere to strict regulatory and administrative requirements, including Buy America certification for iron, steel, and manufactured products, as well as compliance with various federal non-discrimination, accessibility (ADA), and anti-lobbying laws. All shipments must be made FOB Destination, with the vendor responsible for ensuring packaging is sufficient to prevent damage and that all cartons are clearly marked with the purchase order number and department name. The contract includes a minimum one-year manufacturer warranty on all components, and the vendor is responsible for administering warranty claims at no cost to the City. Additionally, vendors must maintain specific insurance coverage, including automobile liability and pollution coverage, and must submit invoices within sixty days of delivery to ensure payment within the City's thirty-day terms.
Motor Vehicle Supplies and New Parts Merchant Wholesalers

POSTED

5 days ago

DEADLINE

in about 1 month
View Details