Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 27, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

QRP EQUIPMENT PREVENTIVE MAINTENANCE SERVICE

Awarded
M6739915T0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation (MTC) is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off (PTO) system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The project is complete once the Facility Maintenance Department verifies proper clutch engagement and PTO operation under load. This is a small business set-aside opportunity under NAICS code 811310, open to various SBA-certified categories including VOSB, SDVOSB, WOSB, and HUBZone businesses. Proposals must be submitted via email to Angie Mahoney by November 3, 2026, and must include a lump sum bid sheet, a completed supplier packet with a W-9 and self-certification form, and proof of insurance. Award will be based on best value, considering the contractor's qualifications, experience, and the itemized cost breakdown. The contract is subject to Federal Acquisition Regulation (FAR) clauses regarding the Buy American Act, combating trafficking in persons, and Service Contract Labor Standards per Wage Determination No. 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
**Certified SB/DVBE Only** IFPQ Boiler Inspection, Maintenance, Repair, Testing, and Reporting in Los Angeles County
Solicitation # 07A6539
The California Department of Transportation (Caltrans) is soliciting price quotes for an Invitation for Price Quote (IFPQ 07A6539) to provide comprehensive boiler inspection, maintenance, repair, testing, and reporting services at the District 7 Office facility in Los Angeles, California. The scope of work includes annual and quarterly preventative maintenance for three Unilux water tube boilers and six boiler pumps, ensuring compliance with manufacturer standards, ASME Code, OSHA requirements, and South Coast Air Quality Management District standards. This is a set-aside solicitation exclusively for certified Small Business (SB), Microbusiness (MB), or Disabled Veteran Business Enterprise (DVBE) entities. The contract will be awarded to the responsible bidder offering the lowest price quote who meets all specifications. Key operational requirements include a 48-hour response time for routine service requests and a strict prohibition on subcontracting any portion of the work. The contractor must adhere to State General Prevailing Wage Rates for Los Angeles County and provide a payment bond for any service request exceeding 25,000 dollars. Required submission documents include a Price Quote Proposal, Bidder Certification Sheet, Non-Collusion Declaration, and certifications for California Civil Rights Laws and the Darfur Contracting Act. Invoicing is conducted monthly in arrears and must be accompanied by certified payroll records and DVBE utilization reports. The agreement is subject to a budget contingency clause, meaning it is enforceable only if sufficient funds are provided by the California State Legislature or the United States Government.
California Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in 15 days
NAICS: 811310
New
SLED
Dietary Equipment Service Agreement
Solicitation # BPM059212
Clifton T. Perkins Hospital Center is soliciting bids for a Dietary Equipment Service Agreement to provide inspections and maintenance for industrial food and beverage equipment within the facility's main kitchens. This Small Business Reserve Procurement is limited to vendors certified by the Governor's Office of Small, Minority and Women Business Affairs. The scope of work includes regular inspections for wear and tear, preventive maintenance, and specific calibration for refrigeration, freezers, cooking appliances, sanitation and warewashing equipment, ventilation, and ice machines. The contract is an Indefinite Quantity agreement with Fixed Unit Prices, featuring a one-year base period and a total award cap of 50,000 dollars. Qualified bidders must hold a Maryland HVACR license issued by the Department of Labor and provide three professional references demonstrating at least three years of relevant experience. Because the facility is a secure psychiatric hospital, contractors must adhere to strict safety and conduct guidelines, including tool inventory controls, patient confidentiality agreements, and professional dress codes. Site visits must be requested by email to the Procurement Officer by October 20, 2026. Bids must be submitted exclusively via the eMMA portal by November 4, 2026, at 2:00 pm. Award will be granted to the responsible bidder offering the most favorable bid price.
Clifton T. Perkins Hospital Center

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 16 hours ago

DEADLINE

in about 2 months

General Info

Contract Value

$96,908.02

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Marine Corps Air Ground Combat Center NREA Division Recycling Program, TWENTYNINE PALMS, CA, 92278, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Solicitation M67399-15-T-0018: QRP Equipment Preventive Maintenance Service

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Commanding Officer
Contacts2 people available
OfficeTWENTYNINE PALMS, CA, 92278-8108, USA
Office AddressTWENTYNINE PALMS, CA, 92278-8108, USA
Contacts
Patrick L. DoyleBusiness Support Specialist

Full Description

Show more
Heavy Equipment Preventive Maintenance Qualified Recycling Program (QRP) MCAGCC, Twentynine Palms, CA 1 .1 Introduction: The Marine Corps Regional Contracting Office (RCO) is procuring maintenance and service for heavy equipment located at NREA Division Recycling Program, Marine Air Ground Task Force Training Command (MAGTFTC)/Marine Corps Air Ground Combat Center (MCAGCC), Twentynine Palms, California. 1.2 General: The contractor shall provide all management, supervision, labor, materials, supplies and equipment to perform twice a year on the listed equipment. The contractor shall provide qualified, trained, skilled personnel for maintenance and inspection of the equipment as set forth in this contract. The objective of scheduled routine maintenance and repair is to eliminate or minimize equipment malfunction, breakdown and deterioration. Contractor maintenance must ensure continuous, safe, and satisfactory operation of all equipment, their parts and components per manufacture specifications and guidelines. The contractor shall schedule routine maintenance to include all tasks herein described. The contractor shall inventory, supply, repair and replace all parts that have become unsafe due to wear and tear. The contractor shall use genuine manufacturer's parts or approved or equal (to be approved by COR) for all replacements. The contractor shall provide the appropriate tools and testing equipment for scheduled maintenance as required by this contract. The contractor shall provide all of the necessary repair parts, materials and supplies to maintain, service, inspect and test the equipment as required by this contract. The contractor shall be responsible for all parts related to preventive maintenance as described in the equipment logs (aka: maintenance specifications as outlined in the owner's manual). Unless otherwise specified herein, the contractor shall provide all supplies, personnel, equipment, tools, materials, supervision, and other items or services necessary to perform the management and operation of motor vehicle maintenance functions as defined in this Performance Work Statement (PWS). All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards and, to the extent feasible and reasonable. All supplies, materials, and equipment to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Checklist Approval - The contractor shall submit to the COR a schedule and description of the scheduled routine maintenance (preventative maintenance (PM)) tasks that the contractor recommends. The contractor shall prepare this schedule and tasks description in a checklist format similar to the one provided in Attachment A. The COR must approve the proposed "Scheduled Routine Maintenance Task Checklist" prior to contract work commencement. Minimum Requirements - The contractor shall provide a trained mechanic to inspect and service every equipment and related peripheral equipment twice a year, every 6 month of the year to maintain the equipment to manufacturer's specifications. Following the manufacturer's recommendations, the contractor shall also perform more involved maintenance at different intervals. The mechanic shall sign off on every item of the checklist. The mechanic shall leave a copy of this signed checklist with the COR following that period's routine maintenance visit. Checklist format example is listed on Attachment A. 1.4 Government Personnel: The Contracting Officer (CO) is the individual executing this contract on behalf of the government and is responsible for the overall administration of the contract. He/she is the only person authorized to make any changes in the prices, terms or other conditions of the contract. The Contracting Officers Representative (COR) is responsible for giving the contractor any special technical instruction or guidance necessary to ensure contract execution. The COR has NO authority to alter the terms and conditions of the contract. The COR will be appointed after contract award. 1.5 Contractor Personnel: The contractor shall have a competent on-site representative authorized to act on behalf of the contractor, available to the COR and/or CO to receive instructions or information regarding work under the contract. The on-site representative must be able to fluently speak and understand English. In the case of emergency, the on-site representative shall provide a phone number to the COR and/or CO within 14 calendar days of award where he/she can be contacted 24 hours per day 7 days a week. The contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the contractor to maintain close surveillance over personnel employed to perform work on the contract. No unauthorized personnel are permitted on the premises. 1.6 List of Employees: Contactor shall furnish names of all personnel performing work on this contract no later than 14 calendar days after award. No unidentified or unauthorized personnel are permitted on the work site. 1.7 Work Schedule: Operating hours shall meet mission requirements. Vehicle maintenance normal hours of operation shall be 0600-1400 hours daily, Monday - Friday, excluding Federal holidays. Upon notification by the COR, the contractor shall provide services to support weekend/holiday training schedule. Contractor employees will check-in and out with the COR each time inspection and maintenance is being performed under this contract. Within 14 calendar days after contract award, the contractor shall submit to the COR and/or CO, a complete work schedule for approval. Contact the COR and/or CO at least 48 hours prior to scheduled inspection and maintenance. When conditions occur that require a change in the inspection/maintenance schedule the contractor will notify the COR immediately. The COR and the contractor will agree to the revised schedule before proceeding with the new schedule. The work performed under this contract shall be subject to inspection by the COR. 1.8 Safety: A safety plan is required to be submitted to the COR and/or CO within 14 calendar days after contract award. The COR's approval of the plan is required prior to the commencement of work. The contractor shall perform services under the contract in compliance with the safety requirements defined in all applicable Federal, State and local laws, regulations and ordinances, including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration. When questionable, the most stringent shall apply. The contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of employees and of members of the public and shall comply with all applicable safety and health regulations and requirements. The contractor shall provide to the government the Material Safety Data Sheets (MSDS) for all chemicals used prior to those compounds being brought into the facility. The contractor shall ensure employees have safety education when engaged in activities involving Government facilities, personnel, or equipment. The contractor shall require their personnel to wear safety shoes/boots IAW OSHA standards. The contractor shall maintain an accurate record of, and shall report to the COR and CO, all cases of death, occupational disease, or traumatic injury to employees of the public and any property damage as a result of performance under this contract. 2.0 Scope 2.1 The Contractor is responsible to provide any required corrective maintenance that must be performed prior to the start of the preventative maintenance period to make the equipment mechanically sound and fully functional at 100%. The Contractor is responsible for providing the professional maintenance services, labor and materials necessary to perform BI-ANNUAL preventative maintenance for CATERPILLAR EXCAVATOR, SCRAP HANDLER and LOADER, CASE SKID STEER, AL-JON LOGGER BALER and JLG TELEHANDLER as outlined in applicable equipment technical manual. Work is to be completed at QRP facilities, Bldg. 2096 or 2085, where the equipment is utilized. The Contractor is responsible for providing the professional diagnostic services, labor and materials necessary to perform corrective maintenance, as required for CATERPILLAR EXCAVATOR, SCRAP HANDLER and LOADER, CASE SKID STEER, AL-JON LOGGER BALER and JLG TELEHANDLER equipment outlined. Work is to be completed at QRP facilities, Bldg. 2096 or 2085, where the equipment is utilized. The contractor shall not use any materials, chemicals, or compounds which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied. The contractor shall provide intermediate maintenance, preventive maintenance and scheduled inspections/tests; repair/replace unserviceable parts, assemblies, subassemblies and components; refinish, fabricate parts, make modifications; repair accessories and auxiliary equipment, and body and structural repair. The contractor shall maintain all vehicles to the standards contained in original equipment manufacturer (OEM) directives and technical manuals. The contractor shall provide, issue, and add all replenishment fluids/lubricants to include; engine oils, transmission, brake and hydraulic fluids, gear lubricants, and coolants that meet the standards set forth in original equipment manufacturer (OEM) directives and technical manuals. Inspect brake system for proper operation Inspect cooling system Inspect exhaust and heat shields Inspect steering and suspension Inspect fuel system Lubricate carriage and steering Inspect transmission fluid Inspect air filter Check and replace engine oil Inspect belts and hoses Inspect all lights and verify proper operation Inspect tires and inflate to the proper psi Check wheel lugs for proper torque Top off all fluids The contractor shall provide on-site maintenance for vehicles and equipment which because of their design or immobility cannot economically be delivered to the vehicle maintenance facility. The contractor shall develop a list of these assets, by registration number, keep the list current, and provide the COR a copy within 14 days after contract awarded and update changes as they occur. The contractor shall establish and implement key control procedures in the Quality Control Plan to ensure keys issued to the contractor by the Government are properly safeguarded and not used by unauthorized personnel. The contractor shall not duplicate keys issued by the Government. The contractor shall comply with Federal drug-free workplace and work force requirements IAW the Federal Acquisition Regulations. The contractor shall provide motor vehicle and equipment repair parts equal to or that exceeds the quality of replacement parts supplied by the original equipment manufacturer (OEM). Commercially purchased or contractor rebuilt parts may be used if they equal or exceed the quality of the original parts. The contractor shall fill in all items on the Equipment Inspection Form; when performing maintenance. All required services are performed and no more than one customer complaint is received per service. Contractor response time does not exceed the limits set forth in this contract. No more than one late arrival per service. 2.2 All parts and labor as required for preventative maintenance on the following equipment per the applicable technical manual: EQUIPMENT MODEL NUMBER SERIAL NUMBER QTY Caterpillar Excavator 345CL PJW00654 1 Caterpillar Loader 950G CAT0950G 1 Caterpillar Scrap Handler M325D CBD00007 1 Case Skid Steer 440CT N6M432030 1 Aljon Balers 400 Logger 13134 1 Aljon Balers 400 Logger 14681 1 JLK 6K Telehandler G6-42A 160028333 1 2.3 Performance period for this contract will be no more than 14 days from the date of award, and will run continuously for 1 year with the provision for 4 extensions of this contract for an additional 1 year period. 2.4 Over and Above Work - Repair Estimates The estimate shall include labor hours, materials, service call cost, price of the part and estimated repair time (days). The costs shall be listed separately. In the event that repairs are not ordered, due to equipment being beyond economical repair or equipment having met its life expectancy; the contractor shall invoice for the service call under the appropriate CLIN for service. A minor repair is defined as a repair that cost $3,000.00 or less and including not to exceed three hours of work. If the repair is ordered, the COR will sign the written estimate. The contractor will provide a copy of the signed written estimate to the COR. A major repair is defined as a repair that exceeds $3,000.00 and exceeds three hours of work. A written estimate will be required for a major repair. Contractor shall not begin repairs without written approval from the COR or Contracting Officer to proceed with repairs. For parts that have been replaced, the old parts shall be turned over to the COR (this excludes the fluids). All repair parts shall be provided at cost. 2.5 Disposal of Removed Materials and Equipment The contractor shall be responsible for the off-site disposal of all removed materials and equipment except those items specifically designated to be retained by the government. The contractor shall not allow debris to accumulate. The contractor shall ensure the work place is cleaned at the end of each day. No materials or debris shall be burned/buried on the site. The contractor shall follow all applicable local environmental disposal laws and regulations. Hazardous Waste generated from vehicle maintenance must be properly stored and disposed of at the Hazardous Waste Management Branch. If the contractor so desires, they may turn in used oil, antifreeze, etc. for recycling to NREA-HWMB, Building 2095 Rifle Range Road, Twentynine Palms, CA. Hours of operations are 0730 to 1500 hrs. If turned in for recycling or disposal, fluids must be in separate containers. Do not mix the items together. 2.6 Information Library The contractor shall have and maintain, for the duration of the contract period, a reference library consisting of manufacturer's equipment maintenance schedules, equipment schematics, layouts, parts list, etc., and other basic information needed to properly maintain the included systems. Upon completion of the contract or termination, the government shall become sole owners of these records. The contractor agrees to maintain complete accurate records of ALL maintenance services performed, repairs made, and replacement parts used and billed for during the period of this contract. Maximum use shall be made of the preventive maintenance requirements. All equipment defects and deviations from normal operating characteristic and specifications shall be recorded on the preventive maintenance services. The contractor agrees to furnish the COR with a copy of each completed work log. That work log shall be annotated with a description of the problem, the corrective actions taken by the contractor personnel and the name of the contractor personnel that performed the work. 43.0 INSURANCE REQUIREMENTS Personal Injury, Property Loss or Damage (Liability). The contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the contractor's personnel in the performance of this contract. The contractor's assumption of absolute liability is independent of any insurance policies. Insurance. The contractor, at its own expense, shall provide and maintain during the entire period of performance of this contract, whatever insurance is legally necessary. Time for Submission of Evidence of Insurance. The contractor shall provide evidence of the insurance required under contract within ten (14) days after contract award. The government may rescind or terminate the contract if the contractor fails to timely submit insurance certificates. Worker's Compensation Insurance. The contractor agrees to provide all employees with worker's compensation benefits as required by law. 4.0 ACCIDENTS AND INJURY The contractor and his employees shall comply with all OSHA regulations. The treatment of injuries sustained by the contractor's employees shall be the responsibility of the contractor. 5.0 GOVERNMENT FURNISHED PROPERTY/UTILITY The Government will not provide any Government Furnished Property 6.0 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP) Plan: This plan is designed to provide an effective surveillance method to promote effective contractor performance. The QASP provides a method for the COR to monitor contractor performance, advise the contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The contractor, not the government, is responsible for management and quality control to meet the terms of the contract. The role of the government is to conduct quality assurance to ensure that contract standards are achieved. Performance Objective: Performs all equipment maintenance services set forth in the performance work statement (PWS). Performance Threshold: All required services are performed and no more than one customer complaint is received per month. Contractor response time does not exceed the limits set forth in this contract. No more than one late arrival per month. Surveillance: The COR will receive and document all complaints from government personnel regarding the service provided. If appropriate the COR will send the complaints to the contractor for corrective action. The Government shall evaluate the contractor's performance under this contract. All surveillance observations shall be recorded by the Government. When an observation indicates defective performance, the COR shall request the contractor's representative to initial the observation. All observations of incomplete or defective performance, or safety and health standards violated shall be recorded. Standard: The performance standard is that the government receives no more than one customer complaint per month and that the contractor does not deviate from the response time limit more than once per month. The COR shall notify the Contracting Officer of the complaint so that the Contracting Officer may take appropriate action. The contractor shall institute and maintain a complete quality-control program to ensure that the requirements of this contract are provided, as specified. An inspection system covering all the services required with a comprehensive checklist to be used to inspect contract performance during scheduled and unscheduled inspections. A file of all inspections conducted by the Contractor and corrective actions taken. This should include follow-up inspections to ensure that corrective action was appropriate, complete and timely. 7.0 Records 7.1 Within thirty (30) days of contract award, the Contractor shall submit a Vehicle Maintenance Plan ("Plan"). This submittal shall be approved by the Contracting Officer in writing. The Contractor shall not commence work until this submittal is approved by the Contracting Officer in writing. The Contractor is responsible for making such revisions to the plan as are deemed necessary by the Contracting Officer. If the Plan requires any revisions or corrections, the Contractor shall resubmit the Plan within ten (10) days. No work will be allowed and no progress payments will be processed until the Plan is approved. 7.2 The Plan must be reviewed and updated annually, and as required by the Contracting Officer. The Plan must contain and define the following elements: The Contractor's written policy stating its commitment to the use of employee health and safety and sound environmental management practices. 7.3 Special Qualifications: Service Technicians shall possess the applicable ASE certification to work on applicable equipment prior to commencement of duties. 8.0 Environmental Requirements 8.1 The contractor shall comply with all federal, state and local environmental laws, and MCAGCC policies and regulations to include but not limited to Resource Conservation and Recovery Act (RCRA), Safe Water Drinking Act (SWDA), the Clean Air Act (CAA), and Federal Facilities Compliance Act (FFCA). 9.0 Services Summary Performance Objective PWS Para Performance Threshold Corrective Maintenance prior to the commencement of Preventative Maintenance cycle to make equipment mechanically sound and fully functional 2.1 100% Serviceability of Equipment Preventative Maintenance 2.1 Minimum of every 6 months Corrective Maintenance as required 2.1 100% Serviceability of Equipment Please see attachment solicitation M6739915T0018

More opportunities from Department Of Defense → Commanding Officer

Same awarding agency

NAICS: 541330
New
Federal
Financial and Program Management Support (FPMS)
Solicitation # N6339427R3102
Solicitation N6339427R3102, titled Financial and Program Management Support (FPMS), is a Cost Plus Fixed Fee Level of Effort contract issued under the SeaPort NxG Multiple Award Contract. The project is 100% set aside for Woman Owned Small Businesses under NAICS code 541330. The primary objective is to provide the Department of Defense, specifically the Naval Sea Systems Command's Naval Surface Warfare Center Port Hueneme Division, with non-personal technical, analytical, and administrative support. Key services include data aggregation, financial reporting, risk analysis modeling, schedule tracking, and the delivery of data-driven insights to support resource management and program execution. The contract includes a base period and multiple option years extending through July 2032. Award will be based on best value, utilizing a trade-off analysis between technical approach, personnel, and total evaluated cost, provided the offeror passes a past performance eligibility check. Performance is monitored via a Quality Assurance Surveillance Plan, and invoicing is managed through the Wide Area Workflow module on the PIEE system. Strict security requirements are in place, including compliance with CMMC, SPRS reporting, and the protection of Controlled Unclassified Information according to NIST SP 800-171 standards. Proposals must be submitted via the PIEE Solicitation Module by the December 8, 2026 deadline.
Engineering Services

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334519
New
Federal
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
Solicitation # N6339426R0005
The Naval Surface Warfare Center, Port Hueneme Division is soliciting proposals for a Multiple Award Contract (MAC) under an Indefinite Delivery Indefinite Quantity (IDIQ) vehicle to procure the LSEQ MK 6 Mod 1 (NAVSEA p/n 8652144-19) and associated Lowest Replaceable Units (LRUs) for the MK 41 Vertical Launching System (VLS). The scope of work includes the fabrication, assembly, testing, and delivery of critical components such as Missile Electronics Boxes, Hazard Electronics Boxes, ethernet switch modules, power tray modules, relay module assemblies, and single-mode fiber optic cable assemblies. The contract also requires the performance of a Physical Configuration Audit and the incorporation of approved Diminishing Manufacturing Sources and Material Shortages changes into the system Technical Data Package. The total combined maximum value for all orders is 458,090,782 dollars, with a minimum award value of 1,000 dollars per awardee. The government intends to award no more than two contracts based on a best value tradeoff process, with technical capability and capacity weighted significantly more than price and past performance. Proposals must be submitted in two separate volumes via the Procurement Integrated Enterprise Environment, with a delivery schedule of 54 weeks from the date of award. The contract utilizes a firm fixed price model with stepladder pricing across a five-year ordering period. Quality standards are strictly governed by ASQ/ANSI/ISO 9001:2015 and MIL-STD-129R for marking and packaging. Additionally, the contractor must comply with Cybersecurity Maturity Model Certification requirements and maintain strict operations security and information protection protocols.
Other Measuring and Controlling Device Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS