Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Quality Inspection and Contamination Control Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 19 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves on-site inspection of incoming recyclable loads to verify compliance with contamination standards, specifically ensuring that non-recyclable content does not exceed 25 percent. Inspectors are responsible for documenting each load’s condition, identifying and rejecting any shipments that fail to meet the required purity threshold, and submitting detailed reports on inspection outcomes. This work is critical to maintaining the quality and usability of recyclable materials within the processing stream. The services are classified under NAICS code 541620 and are structured as a subcontract under the Purchasing agency for the state of Texas. The solicitation was posted on May 20, 2026, with proposals due by June 24, 2026. The place of performance is not specified beyond the state level, and no set-aside provisions are indicated. All inspection activities must be performed in accordance with established protocols to ensure consistent enforcement of contamination limits.

General Info

On-site inspection of recyclable loads to ensure contamination stays below 25 percent, with reporting and rejections required.

Agency

Texas → PurchasingView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 2026-05.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Marketing of Recyclable Materials

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Purchasing
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Purchasing
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site inspection of incoming recyclable loads to ensure compliance with contamination standards (≤25% non-recyclable content), including documentation, rejection of non-compliant loads, and reporting.

More opportunities from Texas → Purchasing

Same awarding agency

NAICS: 237110
SLED
AC Pipe Replacement Solms (IH 35)
Solicitation # RFP 26-0053
New Braunfels Utilities (NBU) is soliciting proposals for the AC Pipe Replacement Solms (IH 35) project in New Braunfels, Texas. The scope of work involves the construction of approximately 2,730 linear feet of 4-inch, 6-inch, and 12-inch water main piping using open cut methods, the installation of a pressure reducing valve, and the removal of existing piping, including asbestos cement pipe. Additional requirements include grout fill abandonment of existing pipes, traffic control, storm water pollution prevention, and site restoration. The project is designed by Quiddity Engineering, LLC, and must adhere to technical specifications dated July 24, 2026, and a geotechnical report dated March 17, 2026. The estimated maximum construction budget is 1,600,000 dollars, and the expected period of performance is 180 calendar days from the Notice to Proceed. Proposals are due by September 18, 2026, and must be submitted in PDF format via the designated portal. Award selection is based on best value, with evaluation weights assigned to cost (50%), proposed schedule (20%), past performance on similar projects (10%), overall qualifications and reputation (10%), and available resources (5%). Required submission documents include a bid bond for 5% of the proposal cost, corporate formation documents, insurance certificates, and signed verification forms for Texas Government Code Chapters 2271, 2274, and 2276. The contractor is required to provide survey-grade GPS points for utility attributes prior to backfill and must comply with NESHAP and OSHA regulations regarding hazardous material handling. Payment is processed 30 days after the application for payment is submitted to the owner with the engineer's recommendation.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS