Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Traffic Control and Site Restoration Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Traffic Control and Site Restoration Services involves providing traffic management and site restoration for prime contractors working on New Braunfels Utilities projects along the IH 35 corridor. The scope of work includes the implementation of traffic control plans, management of storm water pollution prevention, and the restoration of roadbeds and pavement using base materials and asphalt. The contractor is responsible for ensuring full compliance with local traffic laws and storm water regulations to deliver a safe work zone and properly restored pavement. This opportunity is categorized under NAICS code 561990, with a response deadline of September 18, 2026.

General Info

Subcontract for traffic control and site restoration for New Braunfels Utilities projects.

Agency

Texas → PurchasingView Agency

NAICS

561990 - All Other Support ServicesView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 26-0053.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AC Pipe Replacement Solms (IH 35)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Purchasing
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Purchasing
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs traffic management and site restoration for prime contractors on New Braunfels Utilities (NBU) projects along the IH 35 corridor. Implements traffic control plans, manages storm water pollution prevention (SWPPP), and restores roadbeds and pavement using asphalt and base materials. Complies with local traffic laws and storm water regulations. Delivers a safe work zone and restored pavement.

Similar Contracts

Same NAICS industry code

NAICS: 561990
New
Federal
R--JEFF - Utility Mapping
Solicitation # 140P6226Q0007
The National Park Service is seeking quotes for a firm-fixed-price contract to perform non-invasive subsurface utility locating and mapping of irrigation systems and utility lines across approximately 45 acres of landscaped and turf areas at Gateway Arch National Park. The primary objective is to create a general reference for park maintenance staff to diagnose irrigation failures and identify utility locations. Deliverables include non-survey-grade digital and paper maps, with a preference for GIS ESRI file geodatabase format projected to UTM Zone 15, NAD83 (2011). The contractor must utilize industry-standard methods such as Ground-Penetrating Radar and Electromagnetic locating equipment. This procurement is a total small business set-aside under NAICS 561990. Performance is expected to occur within 60 to 90 days of award, and the contractor is provided a one-year workmanship warranty following project acceptance. Key operational restrictions include a prohibition on using UTVs or vehicles off paved surfaces and a general ban on drones unless a specific exception is granted and the pilot is FAA certified. Marking paint is permitted but must be limited and avoided on improved surfaces. Quotes must be submitted on company letterhead via email to the contracting officer by September 10, 2026, and must include the offeror's SAM UEI and completed FAR 52.212-3 representations. Award will be based on the most advantageous combination of price and technical factors.
Mwr Missouri MABO(62000)

POSTED

3 days ago

DEADLINE

in 3 days
View Details

More opportunities from Texas → Purchasing

Same awarding agency

NAICS: 237110
SLED
AC Pipe Replacement Solms (IH 35)
Solicitation # RFP 26-0053
New Braunfels Utilities (NBU) is soliciting proposals for the AC Pipe Replacement Solms (IH 35) project in New Braunfels, Texas. The scope of work involves the construction of approximately 2,730 linear feet of 4-inch, 6-inch, and 12-inch water main piping using open cut methods, the installation of a pressure reducing valve, and the removal of existing piping, including asbestos cement pipe. Additional requirements include grout fill abandonment of existing pipes, traffic control, storm water pollution prevention, and site restoration. The project is designed by Quiddity Engineering, LLC, and must adhere to technical specifications dated July 24, 2026, and a geotechnical report dated March 17, 2026. The estimated maximum construction budget is 1,600,000 dollars, and the expected period of performance is 180 calendar days from the Notice to Proceed. Proposals are due by September 18, 2026, and must be submitted in PDF format via the designated portal. Award selection is based on best value, with evaluation weights assigned to cost (50%), proposed schedule (20%), past performance on similar projects (10%), overall qualifications and reputation (10%), and available resources (5%). Required submission documents include a bid bond for 5% of the proposal cost, corporate formation documents, insurance certificates, and signed verification forms for Texas Government Code Chapters 2271, 2274, and 2276. The contractor is required to provide survey-grade GPS points for utility attributes prior to backfill and must comply with NESHAP and OSHA regulations regarding hazardous material handling. Payment is processed 30 days after the application for payment is submitted to the owner with the engineer's recommendation.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS