Quittenton Hall RTU Replacements – Phase 1 and Phase 2
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
St. Clair College is seeking qualified and experienced proponents to submit proposals for the replacement of Roof Top Units (RTUs) at the Quittenton Hall Student Residence located on the South Windsor Campus. The project is planned in two phases: Phase 1 includes replacing two RTUs (MUA-1 and MUA-2) and several associated exhaust fans, while the optional Phase 2 expands the scope to replace four RTUs and a wider range of exhaust fans. The work involves coordinating crane operations, removing existing units and piping, installing new roof curbs and RTUs, reconnecting gas piping and power, upgrading controls, and ensuring that no water penetrates the building during construction. The successful proponent must provide as-built drawings upon completion and guarantee all work, equipment, and materials for one year, with a five-year compressor warranty. The contract term extends from award through to substantial completion, which must occur before March 31, 2027. Proponents are expected to maintain adequate resources for ongoing communication, procurement, installation, commissioning, and warranty service, with a maximum four-hour response time for any operational issues. Documentation including mechanical and electrical drawings is provided, and the bidding process is managed through the MERX platform. The contact for this solicitation is the Contracting Authority, Sabrina Lattuca.
General Info
Agency
NAICS
Place of Performance
CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
