Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 10 at 2:00 PM EDT

Register Free →

Quittenton Hall RTU Replacements – Phase 1 and Phase 2

Active
2027-006

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

St. Clair College is seeking qualified and experienced proponents to submit proposals for the replacement of Roof Top Units (RTUs) at the Quittenton Hall Student Residence located on the South Windsor Campus. The project is planned in two phases: Phase 1 includes replacing two RTUs (MUA-1 and MUA-2) and several associated exhaust fans, while the optional Phase 2 expands the scope to replace four RTUs and a wider range of exhaust fans. The work involves coordinating crane operations, removing existing units and piping, installing new roof curbs and RTUs, reconnecting gas piping and power, upgrading controls, and ensuring that no water penetrates the building during construction. The successful proponent must provide as-built drawings upon completion and guarantee all work, equipment, and materials for one year, with a five-year compressor warranty. The contract term extends from award through to substantial completion, which must occur before March 31, 2027. Proponents are expected to maintain adequate resources for ongoing communication, procurement, installation, commissioning, and warranty service, with a maximum four-hour response time for any operational issues. Documentation including mechanical and electrical drawings is provided, and the bidding process is managed through the MERX platform. The contact for this solicitation is the Contracting Authority, Sabrina Lattuca.

General Info

St. Clair College seeks contractors to replace and upgrade RTUs at student residence by March 2027.

Agency

Government of Canada → St Clair College of Applied Arts and TechnologyView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → St Clair College of Applied Arts and Technology
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → St Clair College of Applied Arts and Technology
View Agency Profile
Office AddressN/A
Contacts
Sabrina LattucaContracting Authority

Full Description

Show more
The Purchaser is seeking Proposals from qualified and experienced Proponents to complete work for the replacement of Roof Top Units (RTUs) at the St. Clair College Student Residence - Quittenton Hall, located at 3995 Geraedts Dr., Windsor, Ontario N9G 3C3. This student residence is situated on the St. Clair College South Windsor Campus at 2000 Talbot Rd. West, Windsor, ON N9A 6S3. The RTU replacement will be completed as part of a two-phase project. The scope of work includes: Base Proposal - Phase 1 Replacement of two (2) RTUs, MUA-1, MUA-2, along with associated exhaust fans EF-6, EF-7, EF-8, EF-9, EF-10, EF-11, and EF-17. Optional Proposal - Phase 1 and Phase 2 Replacement of four (4) RTUs, MUA-1, MUA-2, MUA-3, and MUA-4, along with associated exhaust fans EF-1 through EF-19. The scope of work includes but is not limited to the following: Coordinate crane location and timing with the Purchaser to ensure lifting operation does not conflict with the Purchaser’s operations. Remove existing make-up air units, disconnect and secure existing gas piping, power and controls wiring. Expose roof areas to enable installation of new roof curbs for make-up air units. The Preferred Proponent is to ensure work is completed without risking water penetrating inside the building. Remove existing exhaust fans where shown on drawings. Replace exhaust fans as noted. Connect fresh air supply ducts from new make-up air units to existing supply air risers. Reconnect gas piping and power to new make-up air units. Upgrade controls as required for the new make-up air units and exhaust fans. Provide as-built drawings to consultants once work is completed. For drawings and specifications, please refer to Appendix A: Mechanical and Electrical Drawings and Specifications. The term of the Agreement shall run from the date of award through to the date of substantial completion, which must occur prior to March 31, 2027. Additionally, the Preferred Proponent shall guarantee all work, equipment and materials for one (1) year from substantial completion of the Agreement. The Preferred Proponent shall guarantee the unit compressors for five (5) years from substantial completion of the Agreement. The Purchaser expects the Preferred Proponent to maintain sufficient resources to fulfill all service requirements, including but not limited to, onsite meetings, shop drawing reviews, procurement activities, ongoing communication regarding delivery timelines, installation, commissioning, and warranty support. A maximum four‑hour response time is required for any operational concerns. Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Similar Contracts