Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on July 30, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

R--Regional Stormwater Improvement Project in the Industrial Area of Cape Canaveral Air Station, FL.

Awarded
W9128F-08-R-0045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key requirements include the provision of a Certified Industrial Hygienist to verify materials and conduct final clearance, the submission of a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and adherence to Davis Bacon Act wage determinations. The contract will be awarded based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid conference and the provision of specific insurance coverages, including automobile liability and workers compensation. Once awarded, the contractor must start work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Omaha District, intends to award a firm fixed price contract for environmental remediation services at Cape Canaveral Air Station, Florida. This project focuses on the construction of a Regional Stormwater Improvement Project in the Industrial Area to manage stormwater runoff and prevent groundwater contaminated with chlorinated solvents from discharging into the Banana River Lagoon. The effort is set aside for qualified small business concerns under NAICS Code 562910. The scope of work involves the design and construction of a two-basin wet detention system utilizing aeration, volatilization, and phytoremediation to remove volatile organic compounds. Key activities include excavating primary and secondary basins, installing control structures and solar-powered treatment systems, replacing sanitary sewer lines, and modifying stormwater conveyance swales. The government will utilize a best value approach for selection, evaluating proposals based on technical approach, past performance, and price.

General Info

Contract Value

$0

NAICS

562910 - Remediation Services

Place of Performance

US Army Corps of Engineer - Omaha District 1616 Capital Street Omaha NE 68102 US, NE, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Deadline changed

Response deadline changed from Aug 18, 2008 to Aug 1, 2008.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
The purpose of this modification is to change the anticipated release date of the solicitation from 16 July 2008 to 25 July 2008. This notice is posted IAW FAR 5.203 and 5.204. The U.S. Army Corps of Engineers, Omaha District, intends to solicit and award one firm fixed priced contract for Environmental Remediation Services located at Cape Canaveral Air Station, FL, in the support of the U.S. Army Corps of Engineers (USACE). This action will be initiated under NAICS Code 562910 with a size standard of 500 employees. The subject solicitation will be set-aside for qualified small business concerns IAW FAR 19.502-2. It is anticipated that the solicitation will be released on or about 25 July 2008 2008. SCOPE: The following is a summary of the proposed scope of services. The actual scope of services will be released with the solicitation on or about 16 July 2008. Summary: The following is a brief summary of the proposed CCAFS Industrial Area Regional Treatment Basin planned to be constructed as a Regional Stormwater Improvement Project in the Industrial Area of CCAFS. The purpose/scope of the work plan, design, and stormwater treatment system is to: 1. Manage (capture, route and treat) stormwater runoff from the western portion of the CCAFS Industrial Area (Regionalized Stormwater Basin permitted by SJRWMD), and 2. Prevent (capture and treat) groundwater contaminated with chlorinated solvents (managed by the FDEP) in the Industrial Area of CCAFS from discharging to the Banana River Lagoon located along the western edge of the installation. The Banana River Lagoon has been designated an Outstanding Florida Water, a Federal Manatee Sanctuary, and is part of the Merritt Island National Wildlife Refuge. Therefore, it is critical to prevent contamination from discharging into the Banana River Lagoon through a combination of stormwater management and groundwater capture and treatment. Project Approach: The current design is for the construction of a stormwater retention/treatment basin system on the west side of the CCAFS Industrial Area to capture stormwater runoff from the western portion of the CCAFS Industrial Area and groundwater/surface waters impacted (or potentially impacted) by chlorinated solvent contamination emanating from industrial area groundwater plumes. It has been determined that contaminated groundwater can upwell into surface water swales, canals, and ditches that eventually discharge into the Banana River Lagoon. In addition to the retention/treatment basin, changes to the stormwater conveyance systems (ditches, swales, canals, etc.) in the CCAFS Industrial Area will be required to divert stormwater into the basin area. Aeration, volatilization, and phytoremediation shall be the primary methods used to remove volatile organic compounds from the basin water prior to discharge to the Banana River Lagoon. The proposed improvement plan establishes two wet detention stormwater management areas. The wet detention areas consist of newly constructed lake areas connected by new conveyance swales, piping and control structure. Following the Primary system east of Scrub Jay Road, the overflow is piped to another wet detention system west of Scrub Jay Road for additional treatment. The wet detention system discharges by control structure to a bubble-up system into a wetland area south of the 1798 canal. Groundwater and surface water impacted with VOC will be captured and treated through a variety of treatment processing including: 1. Air stripping/aeration/agitation treatment via a SolarBee (or equivalent) treatment unit in the main basin east of Scrub Jay Road 2. Air stripping/aeration/agitation treatment via a solar powered aeration system in the secondary basin west of Scrub Jay Road 3. Phytoremediation via wetland plant species uptake installed throughout the primary and secondary basin system 4. Photoionization/Volatilization via sunlight surface exposure throughout the primary and secondary treatment basin systems 5. Evapotranspiration via atmospheric conditions. Evapotranspiration is considered to be one of the most significant influences in the pond system based on Floridas climatic conditions. This process will be a significant factor in the drawdown of the pond surface water elevations to help ensure maximum groundwater plume capture. 6. Air Stripping/treatment via agitation of surface water flow across various surface water features and structures throughout the basin treatment systems The 1798 canal bubbler/aerator system will need to be removed and partially abandoned as part of the secondary basin construction efforts. The canal bubbler sparge legs will be removed and salvaged for replacement parts for other operation canal bubbler systems at CCAFS. The blower unit and applicable infrastructure will be removed and temporarily stored or left in place (if unimpacted by construction activities) for future use as necessary. If the proposed basin treatment system is unable to effectively remove VOC contaminants, the blower system can be retrofitted to provide more significant air stripping treatment in the secondary basin prior to discharge to the wetland system. Basin Construction Activities: The primary construction activities to be conducted as part of the basin treatment system construction generally include: 1. Remove and replace existing sanitary sewer line crossing (east/west) the primary basin foot print. The existing gravity feed sewer line will be replaced with a ductile iron pipe encased in a HDPE sleeve to allow double containment under the stormwater basin while allowing future access for maintenance as needed. 2. Establishment of a truck haul route along Scrub Jay Road and the construction of a temporary bridge crossing over the FT-17 canal to emplace basin spoils in the permitted Titan Soil Staging Area. Soil samples were collected and analyzed from various locations and depths within the basin footprint to determine re-use options. All soil sample results were non-detect or below FDEP SCTLs and/or CCAFS background screening criteria. Therefore, the soil meets the CCAFS clean fill criteria and will be staged at the Titan Soil Staging Area for future use as clean fill. 3. Modify/deepen the existing stormwater conveyance swales and replace existing stormwater pipes to accommodate for the upstream basin. Replace an array of aging, undersized pipes, which will convey stormwater to the regional treatment system. 4. Excavation of the Primary Basin (east of Scrub Jay Road) and the Secondary Basin (west of Scrub Jay Road) along with the installation of a 20 ft wide access road surrounding both basins. 5. Installation of two (2) primary control structures at the effluent of the primary basin and secondary basin to control water level elevations in the treatment systems. 6. Installation of a bubble-up effluent discharge system into the wetland area south of the 1798 canal from Control Structure #2. 7. Installation of a SolarBee Treatment System (or equivalent) in the Primary Basin and a Solar Powered Aeration Treatment System in the Secondary Pond. 8. Modification of the 1798 Canal west of the secondary basin (see Drawing C-7) to allow for long term establishment of mangroves and other native species which interconnect with the Banana River. PROCEDURE: The Government will employ a best value approach in evaluating proposals using trade-off selection procedures as required by AFARS Subpart 5115.1 -- Source Selection Processes and Techniques. Evaluation factors may include technical approach, past performance, and price. ADDITIONAL INFORMATION: No responses to this announcement are required. All information required for submission of an offer will be identified in the RFP when issued. All responsible sources may submit an offer, which will be considered. This synopsis is not to be construed as a commitment by the government. Any costs incurred as a result of a response to this announcement shall be borne by the firm and will not be charged to the government for reimbursement. The RFP will be electronically issued using the Army Single Face to Industry (ASFI) Acquisition Business Website (https://acquisition.army.mil/asfi/). When issued, the RFP may also be viewed via http://www.fedbizopps.gov/. Technical data and supporting documentation will be made available for viewing via FedBizOpps. Written, telephonic, or fax requests for a solicitation package will NOT be accepted. Once the solicitation is posted, it is incumbent upon the interested parties to review this site frequently for updates or amendments to any and all documents. All Offerors must be registered in the Central Contractor Registry (CCR) prior to receiving any award. Information concerning CCR requirements may be viewed via the Internet at http://www.ccr.gov or by calling the CCR Registration Centers at +1 (555) 000-0000.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a firm-fixed-price requirement issued by the US Army Corps of Engineers Omaha District for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The scope of work specifically covers facilities G7140 and H7140 and includes conducting a teleconference kick-off meeting, performing external tank and visual containment area inspections, and testing alarms and Automatic Tank Gauge equipment. The contractor is required to provide a certified API 653 Inspector and a Project Manager to ensure compliance with industry standards including API 653, API RP 575, NFPA 30, and NFPA 326. Key deliverables consist of draft and final reports for each facility along with completed API Std 653 checklists, with all work to be completed by March 20, 2027. This acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541990. Proposals must be submitted as a single PDF document not exceeding five pages, excluding the price worksheet and administrative pages, and must be sent to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by November 13, 2026. Award decisions will be based on the most advantageous offer, evaluating technical capability, inspector certifications, relevant project experience, and price reasonableness. Contractors must adhere to strict installation security requirements for personnel and vehicle access and comply with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
All Other Professional, Scientific, and Technical Services

POSTED

about 22 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS