Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on July 28, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

R499--598-20-3-7153-0113 EMERGENCY LINAC TECHNICAL SHIELDING REVIEW

Awarded
36C25620Q0710Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 14 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Department of Veterans Affairs National Health Physics Program has awarded a firm fixed-price contract to Therapy Physics Inc for radiation oncology shielding design analyses, shielding survey technical reviews, and training. The contractor is responsible for providing at least two qualified medical physicists who hold certifications from recognized boards such as the American Board of Radiology or the American Board of Medical Physics and have completed a minimum of 50 radiation therapy vault designs. The primary objective is to review radiotherapy vault shielding design and survey reports, specifically for Linear Accelerator vaults, to ensure compliance with NCRP Report No. 151 and federal radiation exposure limits. The scope of work includes three main tasks: conducting technical reviews of existing facility shielding design reports, performing technical reviews of shielding survey reports, and providing case-study based training to NHPP Program Managers. All work is performed virtually, and final reports must be delivered electronically within four calendar weeks of a request. The initial contract period covers fiscal year 2020 with renewal options extending through 2024. The award amount is 45,250.00 dollars under NAICS code 541330, with all deliverables remaining the exclusive property of the U.S. Government.

General Info

Contract Value

$80,750

NAICS

541330 - Engineering Services

Place of Performance

MS, USA

Set-Aside

SBA

Award Issued Date

Documents

1

Award Notice 36C25620C0121 - Therapy Physics Inc

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)
Contacts1 person available
OfficeRIDGELAND, MS, 39157, USA
Office AddressRIDGELAND, MS, 39157, USA
Contacts
Andrew MisfeldtAndrew Misfeldt

Full Description

Show more
VA NATIONAL HEALTH PHYSICS PROGRAM (NHPP) STATEMENT OF WORK Title: Radiation Oncology Shielding Design Analyses, Shielding Survey Technical Reviews, and Training Scope of Work: The contractor will furnish all labor, tools, and equipment necessary to perform reviews. All work will be conducted by a qualified medical physicist (QMP). The QMP performs shielding design analysis report and shielding survey report reviews of radiotherapy vaults (primarily Linear Accelerator [LINAC] vaults) at the request of the contracting officer s representative (COR). The contractor reviews radiation shielding design analysis reports and shielding survey reports to ensure they meet criteria set forth in NCRP Report No. 151 and will result in radiation exposures that do not exceed the design goals in NCRP Report No. 151 and the radiation exposure limits set forth in Federal Regulations. The contractor will also provide training, if requested, to the NHPP Program Managers on technical reviews of shielding analysis and survey reports. The QMP must meet the following qualifications: A Qualified medical physicist is a person who is certified by the American Board of Radiology in Radiological Physics, Therapeutic Medical Physics, or Therapeutic Radiological Physics; American Board of Medical Physics in Medical Health Physics or Radiation Therapy; Canadian College of Physicists in Medicine, or American Board of Health Physics. The QMP will provide documentation he/she meets the required certification (must be current and active) for this contract. The QMP will have completed at minimum 50 radiation therapy vault designs.The QMP will provide example reports of shielding designs to demonstrate their work is adequate to perform this contract. The contractor will have a minimum of two QMPs capable of performing the shielding design reviews on staff. Background: The LINAC (linear accelerator) radiation shielding design analysis and post construction survey is based on the guidelines in National Council on Radiation Protection and Measurements (NCRP) Report No. 151, Structural shielding and evaluation for megavoltage x- and gamma-ray radiotherapy facilities. The review of the radiation shielding design analysis and survey reports is to ensure that the NCRP Report No. 151 design goals are met. The final product will result in radiation exposures that do not exceed limits set forth in Federal regulations. Period of performance: The contract is for a one-year period for fiscal year 2020 with renewal options for fiscal years 2021 through 2024. Place of performance: The work will be performed virtually; through phone, email, or other electronic methods. The QMP is not required to perform on-site work. Type of Contract: The Government anticipates award of a Firm Fixed-Price contract. Tasks and Deliverables: 7.1. Task One: Technical review of radiation shielding design reports for VA radiation therapy vaults 7.1.1. Deliverable: Conduct a technical review of an existing facility radiation shielding design report and provide a report to the VA National Health Physics Program. 7.1.2. Deliverable: The report will contain the requirements listed in attached Radiation Shielding Design Review Report requirements (attachment A). 7.1.3. Deliverable: The report must contain a statement indicating the sufficiency or non-sufficiency of the design to meet the design goals set forth in NCRP Report No. 151. 7.2. Task Two: Technical review of radiation shielding survey report for VA radiation therapy vaults 7.2.1. Deliverable: Conduct a technical review of an existing facility radiation shielding survey report and provide a report to the VA National Health Physics Program. 7.1.2. Deliverable: The report will be in the format in the attached Radiation Shielding Survey Report (attachment B). 7.2.3. Deliverable: The report must contain a statement indicating the sufficiency or non-sufficiency of the survey to ensure exposure levels do not exceed the design goals set forth in NCRP Report No. 151 and the.limits set forth in federal regulations. 7.3. Task Three: Provide training to NHPP managers on shielding design analysis and survey report reviews. 7.3.1. Deliverable: Conduct training with NHPP Program Managers on evaluation of radiation therapy vault shielding design and review of shielding analysis reports. Training will be conducted through case studies. 7.3.2. Deliverable: Conduct training with NHPP Program Managers on evaluation of radiation therapy vault shielding surveys and review of shielding survey reports. Training will be conducted through case studies. Contract award meeting: The contractor shall not commence performance on the tasks in this SOW until the Contracting Officer has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived. Formal Acceptance or Rejection of Deliverables: N/A Changes to the SOW: Any changes to this SOW shall be authorized and approved only through written correspondence from the Contracting Officer. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor. Contractor Reporting Requirements: The contractor will provide the final shielding design and/or survey review report to the NHPP within 4 calendar weeks of receipt of initial request. Reports will be sent electronically to meet this requirement. Under no circumstances will the QMP provide reviews of their own shielding design. The QMP responsible for the work being performed will be available for consultation and/or advice concerning the reports. All QMP communication will be through the NHPP. Travel: N/A Government Responsibilities: The NHPP will provide the facility shielding design analysis report and facility shielding survey reports including the as built floor plan to the contractor. Confidentiality and Disclosure: 14.1. It is agreed that: 14.1.2. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this contract, are the exclusive property of the U.S. Government and shall be submitted to the Contracting Officer at the conclusion of the contract. 14.1.3. The Contracting Officer will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract, presented to the contractor, shall be submitted to the Contracting Officer for response. 14.1.4. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the Contracting Officer. 15. Security Requirements for Unclassified Information Technology Resources: N/A; Contractor shall NOT have access to VA Information Systems/PII. Attachment A Radiation Shielding Design Review Report Requirements: The design analysis review report will provide, but not be limited to, the following information: 1. Facility name: 2. LINAC shielding design report date: 3. Name of the physicist who performed the shielding design: 4. Is the physicist certified by the American Board of Radiology, American Board of Medical Physics, American Board of Health Physics, or Canadian College of Physicists in Medicine? 5. Review of Vertical and horizontal to-scale drawings, showing the vault, isocenter, shielding, and nearby areas, including uses of nearby areas. If there is an adjacent area with a low occupancy factor (e.g., a corridor or storage room), the drawing should show the next nearby room on the opposite side from the vault. 6. Was the shielding designed to meet National Council on Radiation Protection and Measurements (NCRP) Report No. 151 standards? a. Is the workload consistent with the guidelines in NCRP Report No. 151? b. Was intensity-modulated radiation therapy (IMRT) considered in the shielding design? c. Are the design goals consistent with the guidelines in NCRP Report No. 151? d. Are the occupancy factors consistent with the guidelines in NCRP Report No. 151? 7. Review of the ceiling primary barrier, including thickness and width: a. Is the area above considered a controlled or uncontrolled area? b. What occupancy factor was used for this barrier? c. What is the instantaneous dose-equivalent rate (IDR)? d. Should this area be posted with a Caution, Radiation Area sign? e. How is access to the area above controlled, if it is a controlled area? f. Is sky shine a problem? g. Are there nearby multistory buildings? h. Has side scattered photon radiation been considered for the nearby multistory buildings? 8. Review of the ceiling secondary barrier, including thickness. a. Is the area above considered a controlled or uncontrolled area? b. What occupancy factor was used for this barrier? c. What is the instantaneous IDR? d. Should this area be posted with a Caution, Radiation Area sign? e. How is access to this area controlled? 9. Review of the IDR for uncontrolled areas with an occupancy factor less than 1. Is the barrier in compliance with the 2 mrem in any 1-hour guideline? 10. Review of the primary barriers other than the ceiling including thickness and width. a. Is the width calculated based on the distances where the top of the wall and ceiling intersect? b. Is the area outside considered a controlled or uncontrolled area? b. What occupancy factor was used for this barrier? c. What is the instantaneous dose-equivalent rate (IDR)? d. Should this area be posted with a Caution, Radiation Area sign? e. How is access to the area outside controlled, if it is a controlled area? 11. Review of the secondary barriers other than the ceiling including thickness and width. a. Is the width calculated based on the distances where the top of the wall and ceiling intersect? b. Is the area outside considered a controlled or uncontrolled area? b. What occupancy factor was used for this barrier? c. What is the instantaneous dose-equivalent rate (IDR)? d. Should this area be posted with a Caution, Radiation Area sign? e. How is access to the area outside controlled, if it is a controlled area? 12. Review of tapered barriers. 13. Review lead, steel, or laminated barriers. For LINACs with photon energies > or = to 10 MV, was neutron production taken into consideration? 14. Review of barriers using high density concrete including consideration of neutron dose. 15. Review of direct shielded doors. 16. If there is an entrance maze, review of photon and, if the maximal photon accelerating potential exceeds 10 MV, neutron doses outside the door. 17. Review of shielding penetrations, including ventilation ducts and cable runs. 18. Findings, including a summary of deficiencies. 19. Name of physicist who performed the review. Attachment B Radiation Shielding Survey Report Review Documentation: Date prepared: 1. Facility: 2. Linac survey report date: 3. Date NHPP received Linac survey report: 4. Copy of Linac shielding document on file? 5. Survey meters used: (Enter data from the survey report) Meter 1 Meter 2 Meter 3 Meter 4 Manufacturer Model Serial Number Calibration Date Probe Model Probe Serial Number Appropriate meter? (Yes/No) NOTE: The survey meter used for quantitative x-ray exposure or air kerma measurements should not be a pulse mode device. For x-rays generated at 10 MV or above, neutron measurements should be made at appropriate locations. 6. Comments (required if a No in the table above for appropriate meter): 7. Workload Data: (Enter machine energies, % IMRT, Primary workload, leakage workload, and instantaneous dose rate at the isocenter) Shielding Design Workload Data Survey Workload Data Energies Energies % IMRT % IMRT Primary Workload Primary Workload Leakage Workload Leakage Workload Instantaneous Instantaneous 8. Report Data: (Enter Yes , No , or N/A for whether the response is adequate) Item Response Linac manufacturer Linac model Linac photon energies Name(s) of individual(s) who performed the survey Item Response Name of medical physicist Name of individual who prepared the report Survey dated Description of survey technique Phantom in beam for scatter measurements Photon measurements (maximum dose equivalent rate measured at points outside the shielding barriers) Neutron measurements (maximum dose equivalent rate measured at points outside the shielding barriers) Are measurements taken at 30 cm beyond the barrier? Occupancy factors (T) for each barrier Utilization factors (U) for each primary barrier Method of calculation of the dose equivalent in any one hour of operation For secondary barriers, two short term integrated measurements: (a) one with a scattering phantom in the beam at isocenter and (b) one without a scattering phantom in the beam at isocenter and with the collimators closed Dose equivalent per week (sum photon and neutron dose equivalents) or annual dose equivalent (sum photon and neutron dose equivalents) Maximum dose equivalent in any one hour (sum photon and neutron dose equivalents) Dose rate at the isocenter Gantry orientations (e.g., 0o, 90o, 180o, 270o) Are measurements are needed at other gantry angles? Survey locations Field size Collimator orientation (e.g., rotated 45o ) Type of area (controlled or uncontrolled) Controlled areas < 10 mrem/week (complies with NCRP Report No. 151 recommendations) Uncontrolled areas < 2 mrem/week (complies with NCRP Report No. 151 recommendations) Facility drawing (floor plan and sectional views coordinated with survey results) Barriers scanned for voids with GM survey meter Door and HVAC penetrations surveyed for photons and neutrons Measurements made outside the facility at a number of distances from the isocenter to determine radiation levels due to skyshine If a tall building is located adjacent to the treatment room, the upper floors of the building should be checked for skyshine Conclusion (statement indicating shielding complies with NCRP Report No. 151 recommendations or recommended corrective actions) 9. Comments (required if a No in the table above): 10. Summary of deficiencies:

More opportunities from Department Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)

Same awarding agency

NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
Other Building Equipment Contractors

POSTED

about 23 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS