Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project, managed by the Central Valley Flood Protection Board, involves the installation of a new 94-linear-foot, 18-inch-diameter welded steel drainage pipe through the Dry Creek levee. This work is conducted under Permit No. 19669 in accordance with California Code of Regulations, Title 23. The installation process utilizes an open-cut trench with the pipe encased in one foot of controlled low strength material. The project includes the construction of storm drainage ditches at both the landside inlet and waterside outlet. Key infrastructure additions feature precast concrete headwalls, a trash rack at the inlet, and a flap gate with rock slope protection at the outlet. Additionally, a precast concrete gate well will be installed at the levee embankment waterside hinge, equipped with an access ladder, an automatic sluice gate for positive closure, and an automatic gate lift.

General Info

Installation of a 94-foot steel drainage pipe and infrastructure through Dry Creek levee.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination – Permit No. 19669, Gibbs Pond and 40 Mile Road Pipe Repair Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts3 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Tom EnglerDistrict Engineer

Full Description

Show more
Approval of Permit No. 19669, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install a new approximately 94 linear feet, 18-inch-diameter, 0.5-inch-thick welded steel drainage pipe at an invert elevation of 54.65 feet (NAVD88) through Dry Creek levee. The pipe will be encased with 1 foot of controlled low strength material (CLSM) and installed via an open-cut trench. Approximately 5-foot-deep by 2- to 4-foot-wide storm drainage ditches will be constructed at the landside inlet and waterside outlet. At the landside pipe inlet, a precast concrete headwall and a 48-inch-wide trash rack with 4-inch maximum bar spacing will be installed. At the waterside pipe outlet, a precast concrete headwall, a 18-inch flap gate, and 18-inch-minus rock slope protection will be installed. At the levee embankment waterside hinge, a 4-foot by 6-foot by 19-foot-deep precast concrete gate well will be installed. The gate well will house an access ladder, an 18-inch diameter automatic sluice gate as a positive closure device, and an automatic gate lift.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details