Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project, managed by the Central Valley Flood Protection Board, involves the installation of a new 94-linear-foot, 18-inch-diameter welded steel drainage pipe through the Dry Creek levee. This work is conducted under Permit No. 19669 in accordance with California Code of Regulations, Title 23. The installation process utilizes an open-cut trench with the pipe encased in one foot of controlled low strength material. The project includes the construction of storm drainage ditches at both the landside inlet and waterside outlet. Key infrastructure additions feature precast concrete headwalls, a trash rack at the inlet, and a flap gate with rock slope protection at the outlet. Additionally, a precast concrete gate well will be installed at the levee embankment waterside hinge, equipped with an access ladder, an automatic sluice gate for positive closure, and an automatic gate lift.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
