Permit No. 20013 Del Rio Erosion Control Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Del Rio Erosion Control Project, managed by the Central Valley Flood Protection Board in Redding, California, involves installing rock slope protection along the Sacramento River across two adjacent residential parcels. The scope of work includes removing existing trees and vegetation and excavating the riverbank to a depth of 3.25 feet and up to 13.5 feet landward to facilitate the placement of the rock protection. Additionally, the project authorizes the existing irrigation pump station and requires the replacement of two intake screens. The pump station infrastructure consists of a vault structure and intake pipes measuring 12 inches and 8 inches. This forecast project is coordinated by Senior Environmental Scientist Angela Nguyen-Tan.
General Info
Agency
NAICS
Place of Performance
Redding, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
