Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 22, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--56--Provide all the labor, equipment, materials, and supplies necessary to furnish and deliver R400 Rip Rap to Enid Lake in North Mississippi.

Awarded
W912EE-09-T-0041Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation W912EE-09-T-0041 is a request for quote issued by the U.S. Army Corps of Engineers, Vicksburg District, to procure the furnishing and delivery of R400 riprap to Enid Lake in North Mississippi. Funded under the American Recovery and Reinvestment Act of 2009, the contract requires the contractor to provide all necessary equipment, labor, fuel, transportation, and supplies. This includes sourcing durable quarried stone from approved quarries, performing mandatory gradation tests every 50,000 tons, and providing an excavator with an operator to stack the material at designated delivery areas within three miles of Enid Dam. The contractor must ensure that riprap meets specific weight and shape standards, with a maximum of 10 percent flat and elongated pieces allowed. Delivery is restricted to weekdays between 7:00 a.m. and 3:30 p.m., and payment is contingent upon the submission of certified scale tickets. Additionally, the contractor must comply with the USACE Safety and Health Requirements Manual and adhere to federal reporting mandates via FederalReporting.gov. A pre-work conference with the Resource Manager is required before operations begin.

General Info

Contract Value

$1,649,596.9

NAICS

212312 - Crushed and Broken Limestone Mining and Quarrying

Place of Performance

MS, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Vicksburg
ContactsNo contacts available
OfficeVICKSBURG, MS, 39183-3435, USA
Office AddressVICKSBURG, MS, 39183-3435, USA
ContactsNo contact information available

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Solicitation No. W912EE-09-T-0041 is being issued as a Request For Quote (RFQ) with the intent to award as a simplified acquisition. The solicitation document and incorporated provision and clauses are those in effect through Federal Acquisition Circular 2005-36. The NAICS Code for this procurement is 212312 (SIC 1422) with a size standard of 500 Employees. THIS REQUIREMENT IS FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, P.L. 111-5. The U.S. Army Corps of Engineers (USACE), Vicksburg District has a requirement to provide all equipment, labor, fuel, transportation, and supplies necessary to furnish and deliver Riprap to Enid Lake in North Mississippi. This procurement may be quoted as follows: See Attachment 1, Bidding Schedule. GENERAL 1. C.1. Scope of Work. The Contractor shall provide all equipment, labor, fuel, transportation, and supplies necessary to furnish and deliver riprap to Enid Lake in North Mississippi. All stone shall be durable material as approved by the Government Representative. The stone shall be furnished from a Corps approved quarry (see attached sources). See Bid Form (attached) for quantities. C.2. Riprap. Only quarried stone shall be used. Riprap shall conform to the table below. A maximum of 10 percent flat and elongated pieces will be acceptable. A flat and elongated piece of riprap is defined as a stone with either the width or thickness of the piece being less than one-third of the length. TABLE I (FOR RIPRAP R400) PERCENT LIGHTER LIMITS OF STONE BY WEIGHT (SSD) WEIGHT, LB 100 400 160 50 160 80 15 80 - 30 C.3. Gradation Test The Contractor shall perform a gradation test on the riprap at the quarry in accordance with STANDARD TEST METHOD FOR GRADATION OF RIPRAP AND GRADED STONE. The sample shall be taken by the Contractor in the presence of the Government Representative. The Contractor shall notify a Government Representative not less than 3 days in advance of test. In the event of unavailability of a Government representative; the Contractor shall perform the tests and certify to a Government Representative that the riprap shipped complies with the specifications. At least one gradation test shall be performed per 50,000 tons of each size of riprap, but not less than one test shall be performed for each size. The gradation tests shall be reported using the forms, GRADATION TEST DATA SHEET and ENG FORM 4794-R, will be provided to the contractor. The contractor shall designate on the test form that portion in tons of the lot tested which is applicable to this contract. Any deviation from the reported tonnage shall be corrected and recorded on a revised GRADATION TEST DATA SHEET. The samples shall consist of not less than 25 tons of each size of riprap required, and shall be collected in a random manner which will provide a sample which accurately reflects the actual gradation arriving at the jobsite. Failure of the test on the initial sample and on any additional sample will be considered cause for rejection of the quarry and/or quarry process, and all riprap represented by the failed tests shall be set aside and not incorporated into the work. Any additional tests required because of the failure of an initial test sample will not be considered as one of the other required tests. If collected by truckload, each truckload shall be representative of the gradation requirements. The Government Representative may direct additional testing of the riprap at the project site if the riprap appears by visual inspection, to be out of gradation. The Contractor shall provide all necessary screens, scales and other equipment, the operating personnel, and shall grade the sample. Certification and tests results must be received by the Contracting Officer at the jobsite before the riprap is accepted. C.4. Delivery. The Trucking Company delivering the riprap to Enid Lake is to weigh the trucks on certified scales and provide tare weight tickets signed by a Government representative before payment is made. C.5. Quantity variation Quantity of riprap may vary 10% below tonnage shown on the contract. Communication between Government Representative and supplier will determine actual quantity delivered. C.6. Contaminated Material Riprap containing contaminated material that is not within gradation standards will not be accepted when delivered to Enid Lake. It shall be the responsibility of the contractor to remove all contaminated material from stone prior to delivery. Only riprap that is within gradation will be received and payment disbursed. C.7. Contractor shall supply excavator with operator and all fuel and any other equipment or supplies necessary to stack riprap at the designated delivery areas at Enid Lake as the deliveries are being made. All delivery areas are within 3 miles of Enid Dam. Delivery times are scheduled as Monday through Friday from 7:00 a.m. to 3:30 p.m. unless approved in advance by the Resource Manager. In the event that the trucking contractor is a different vendor than the vendor stacking the riprap, it shall be understood that any delays caused by equipment downtime shall be the responsibility of the contractor stacking the riprap and not the Government. Contractor shall comply with the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 dated 15 Sep 2008. Onsite inspections will be made by the Government to insure compliance. This manual is available online at the following address: http://www.usace.army.mil/CESO/Pages/EM385-1-1,2008NEW!.aspx. This item shall be bid as one job. C.8. Pre-work Conference Prior to beginning work under this order, the Contractor and the supervisor in charge of the execution of this order shall meet with the Resource Manager or his/her representative at a time, date, and location established by the Resource Manager for the purpose of reviewing the requirements of this order, reviewing safety requirements, and furnishing points of emergency contact. Reporting Requirements. Under Section 1512(c) (4) of the American Recovery and Reinvestment Act of 2009, recipients are to participate in the reporting process. The federal government has established a common framework for recipients to manage a data quality recipient reporting process at www.FederalReporting.gov. Only recipients that received funds under the list of programs subject to recipient reporting will report under these reporting requirements (see link below for the list).Supplement List of Programs Subject to Recipient Reporting.http://www.whitehouse.gov/omb/assets/memoranda_fy2009/m09-21-suppl.pdf. Therefore, recipients should view the webinars at: www.Whitehouse.gov/Recovery/WebinarTrainingMaterials for training/instructions on 1) how to register, 2) how to report the common elements, 3) how to check for data quality, and 4) determine estimates of job impact. Primes must incorporate sub-recipient reporting. Waivers will not be granted for reporting requirements, and non-compliance will be treated as a violation of the award agreement. All recipients will report via www.FederalReporting.gov.

More opportunities from Department Of Defense → W07V Endist Vicksburg

Same awarding agency

NAICS: 561210
New
Federal
Operation and Maintenance of Arkansas Lakes Project
Solicitation # W912EE26RA015
Solicitation W912EE26RA015 is a 100% total small business set-aside procurement issued by the U.S. Army Corps of Engineers, Vicksburg District, under NAICS code 561210. The contract is a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) vehicle intended for the operation, maintenance, and repair of government-owned facilities and equipment at Lake Ouachita, Lake Greeson, and DeGray Lake in Southwest Arkansas. The scope of work is comprehensive, covering janitorial and custodial services, mowing and landscaping, dumpster and waste disposal, heavy equipment repair, erosion control, and emergency debris removal following natural disasters. The contract structure consists of a base ordering period, four option years, and a final six-month option, with a minimum guarantee of 1,500 dollars and a task order maximum of 9 million dollars. The government will award the contract based on a best-value tradeoff process, prioritizing technical approach, staffing, and management approach as the most important factor, followed by past performance, with price being the least significant factor. Proposals must be submitted in three separate volumes and adhere to strict formatting and page limits. Key requirements include the designation of a Project Superintendent as key personnel, compliance with the EM 385-1-1 Safety Manual, and adherence to Cybersecurity Maturity Model Certification (CMMC) standards. Following several amendments to refine the scope of work and bid schedules, the final response deadline has been extended to November 2, 2026.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 332311
New
Federal
Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation
Solicitation # W912EE27QA002
Solicitation W912EE27QA002 is a request for quotes from the U.S. Army Corps of Engineers, Vicksburg District, for a turn-key rehabilitation project at the Arkabutla Lake Water Plant in Hernando, Mississippi. The project requires the abandonment of an old well and the installation of a 30 by 50 foot pre-fabricated metal Red Iron open span building to protect a newly installed well. The scope of work includes comprehensive plumbing installations meeting AWWA specifications, the sandblasting and multi-coat painting of a potable water tank using Tnemec and urethane systems, and electrical upgrades compliant with 2020 NEC requirements, including a 200-amp circuit breaker and pump control panel. The government intends to award one firm-fixed-price contract to the lowest priced quote that is determined to be technically successful. Evaluation factors include the contractor's methodology for well abandonment, coating specifications, electrical compliance, and the provision of PE-stamped building drawings and staff licensing. While originally a small business set-aside, Amendment One updated the set-aside type to unrestricted and extended the response deadline to November 6, 2026. All work must be completed within 120 calendar days of the award. Contractors must comply with DoD item unique identification standards and cybersecurity requirements, including CMMC and safeguarding of covered defense information.
Prefabricated Metal Building and Component Manufacturing

POSTED

4 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R
Solicitation # W912EE27RA001
Solicitation W912EE27RA001 is a firm fixed price construction project issued by the US Army Corps of Engineers, Vicksburg District, for levee enlargement, the construction of seepage berms, and temporary access roads in Concordia Parish, Louisiana. The project, identified as Item 367-R, has an estimated value exceeding 10 million dollars and a performance period of 440 calendar days from the date of the Notice to Proceed. This procurement is a total small business set-aside under NAICS code 237990 and is restricted exclusively to FY 25 MATOC contract holders for Mississippi River Levees, Construction of Levee Enlargements and Berms. Key technical requirements include adherence to 2013 ADA Standards, Davis-Bacon Act labor standards, and NIST SP 800-171 cybersecurity protocols. The scope involves demolition and structure removal, embankment work, and environmental protection features, with quality managed through a three-phase control process and daily CQC reports. Progress payments must be processed via the Resident Management System Contractor Mode. Following Amendment 0001, which revised specifications for demolition and structure removal, the proposal submission deadline has been extended to November 13, 2026, at 1400 CST.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS