Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 15, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--C--PROJECT NUMBER 5090, Dworshak Dam And Reservoir, ID Dworshak Fish Hatchery Final Design Value Engineering Study

Awarded
W912EF07-D-0003-0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 6 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 8 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract is a task order awarded to CH2M Hill, Inc. by the U.S. Army Engineer District Walla Walla for a Value Engineering Study at the Dworshak Fish Hatchery in Idaho. The project follows a predesign and feasibility study and aims to refine a two-phased construction approach to bring the facility into environmental compliance. The primary objective is to evaluate the 30 percent design to identify cost-effective methods for implementing full flow drum screens and improving wastewater treatment while minimizing initial and operating expenses. The project is driven by the need to resolve water quality issues and address a Notice of Violation issued by the EPA under the Clean Water Act regarding untreated cleaning wastewater and inadequate flow measurement. The hatchery, which manages millions of steelhead, Chinook, and Coho salmon, currently struggles with fish mortality when using its reuse systems and discharges most effluent with minimal treatment. All modifications must be approved by the Idaho Department of Environmental Quality to ensure the facility meets National Pollutant Discharge Elimination System standards.

General Info

Contract Value

$75,051

NAICS

541330 - Engineering Services

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
ContactsNo contacts available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
ContactsNo contact information available

Full Description

Show more
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): CH2M Hill, Inc., Contract # W912EF-07-D-0003 Under W912EF-07-D-0003, Task Order 0005, the CH2M Hill, Inc. conducted and prepared a predesign study and feasibility study. Based on the outcomes of that task order, the PDT determined that a two-phased approach would be used to accomplish the project goal. The ultimate design includes full flow drum screens. However, compliance may be obtained sooner and with less initial costs and less operating costs by phasing in the construction. The first phase would include those items identified in the feasibility design that at a minimum are necessary to bring the facility into compliance. The purpose of this task order is for the AE to complete a Value Engineering (VE) Study on the feasibility study (30% design) completed under Task Order 0005. Background The Dworshak Fish Hatchery located near Orofino, Idaho is owned by the Walla Walla District, U.S. Army Corps of Engineers (COE) and co-managed by the U.S. Fish and Wildlife Service (FWS) and the Nez Perce Tribe. The hatchery raises approximately 2.0 million steelhead smolts annually to release in the Clearwater River as part of the COE Dworshak Dam mitigation program. The hatchery also participates in the Lower Snake River Compensation Plan, raising approximately 1.0 million Chinook salmon smolts for the North Fork River each year. Additionally, 280,000 Coho salmon smolts are raised as part of a cooperative program with the Nez Perce Tribe and 15,000 rainbow trout are raised for outreach activities. The Dworshak Fish Hatchery has a total of 84 concrete Burrows Ponds arranged into three different systems. Each system has the infrastructure and equipment for operation under water reuse configuration. The Burrows Ponds in System I were constructed for reuse during the initial hatchery construction and reuse equipment was added in System II and III during the second phase of construction. In system I and II, Burrows pond effluent is collected in one of two concrete effluent drain channels that run perpendicular to the ponds, one channel drains directly to the river and the other transfers pond effluent to the corresponding systems reuse treatment equipment. System III effluent can be directed to either the systems channel pump sump for reuse operation or to the River for discharge. Dworshak Fish Hatchery cannot utilize the reuse system because of water quality issues. When the reuse system is utilized, water quality decreases and fish mortality increases. Dworshak Fish Hatchery has 30 raceways arranged in 2 banks. The majority of effluent exits the hatchery via the fish ladder. Cleaning effluent can be diverted to a sump and then pumped to the settling basin and out to the North Fork Clearwater River. The hatchery has 128 small nursery tanks in the nursery room. Nursery tank effluent is always treated in one of two full-flow clarifying basins that are part of the System I Burrows Pond reuse system. Dworshak Fish Hatchery currently discharges the majority of hatchery effluent directly to either the North Fork of the Clearwater River or the Clearwater River with minimal or no effluent treatment. There are a total of 29 discharge locations from the hatchery although many of them are storm drains or overflows that do not come into contact with fish rearing environments or do not discharge on a continuous basis. Nursery tank effluent is always treated in one of two full-flow clarifying basins. When not operated in reuse, effluent from ponds in Systems I and II is discharged directly to the Clearwater or North Fork Rivers. System I Burrows pond effluent is only treated in the systems clarifying basins during water reuse operation. Fish typically experience poor health during the time the reuse systems are being operated, particularly fish in Systems II and III. System III is no longer operated in reuse configuration due to the extensive decline in fish health during reuse operation. Discharge permits in the state of Idaho are issued through the US Environmental Protection Agency (EPA). Dworshak Fish Hatchery currently operates under discharge Permit #IDG131003 within the National Pollutant Discharge Elimination System (NPDES), General Permit #IDG131000 for Cold Water Aquaculture Facilities in Idaho without waste load allocations. In December 2008, the EPA issued a Notice of Violation under the Clean Water Act (CWA), 33 U.S.C. 1251 et seq to the FWS for violating their General Aquaculture NPDES permit. The two primary violations were the discharge of untreated cleaning wastewater and that the Dworshak Fish Hatchery lacked the means to measure flow. If an aquaculture wastewater treatment facility in Idaho needs to be changed or modified, the director of the Idaho Department of Environmental Quality (DEQ) must approve the plan prior to construction or modification. The DEQ must also be notified when the project is complete so that a representative from the DEQ can conduct onsite inspection of the completed project to ensure compliance with the approved plans and specifications.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

3 days ago

DEADLINE

in about 18 hours
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

8 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS