Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Commerce was posted on November 25, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Recovery - Etching System for III-IV Silicon Dioxide

Closed
AMD-10-SS14Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333295
SLED
Cannabis Volatile Extraction Equipment SupplyThe contract entails the supply of closed-loop hydrocarbon extraction systems, solvents, chillers, and post-processing equipment essential for cannabis concentrate manufacturing, with all equipment to be delivered and installed at a facility located in Lynwood, California, zip code 90262. The scope of work is structured as a subcontract under the broader regulatory framework of the California Department of Cannabis Control, focusing on the provision of industrial-grade hardware designed to meet strict safety and efficiency standards required for volatile extraction processes. The equipment must support full operational compliance with state regulations governing cannabis processing, ensuring consistent output quality, operator safety, and environmental controls. The procurement is classified under NAICS code 333295, indicating it pertains to other commercial and service industry machinery manufacturing, and is scheduled to proceed with a posted date of June 26, 2026. Although the solicitation number is unspecified and no set-aside provisions are identified, the obligation is tied to a specific geographic performance location and requires adherence to California’s regulatory protocols for cannabis operations. The equipment will be used in a commercial manufacturing environment, necessitating integration with existing production infrastructure and compliance with hazardous material handling standards. All deliverables must be fully functional, certified, and supported by appropriate documentation to ensure operational readiness upon delivery.
California Cannabis Control, Department of

POSTED

4 months ago

DEADLINE

N/A

General Info

NAICS

333295 - Semiconductor Machinery Manufacturing

Place of Performance

MD

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Todd D HillContracting Officer
Peter J. MacalusoContractor, Senior Acquisition Specialist

Full Description

Show more
RECOVERY - This is a SOURCES SOUGHT SYNOPSIS for market research purposes. THIS IS NOT A REQUEST FOR PROPOSALS/QUOTES. INFORMATION RECEIVED WILL BE USED FOR MARKET RESEARCH PURPOSES ONLY. This potential procurement is anticipated to utilize American Reinvestment and Recovery Act Funding if it is determined that responsible sources can satisfy the requirement. The National Institute of Standards & Technology (NIST) seeks information on commercial vendors that are capable of providing a suite of three plasma processing tools and ongoing process development support in the vendor's application laboratory for a period of not less than one year after tool delivery. The tools shall be installed in a clean room at NIST in Boulder, Colorado. and shall be used for fabricating superconducting thin film integrated circuits and microelectromechanical (MEMS) devices for a wide variety of sensor, imaging, ion confinement and biomagnetic research projects. After results of this market research are obtained and analyzed and specifications are developed for a suite of tools and support that can meet NIST's minimum requirements. NIST may conduct a competitive procurement and subsequently award a Purchase Order utilizing FAR Subpart 13.5. If at least two qualified small businesses are identified during this market research stage, then any competitive procurement that resulted would be conducted as a small business set-aside. NIST has a need for a suite of three plasma processing tools, a reactive ion etcher using fluorine chemistry for etching metals including Niobium and Molybdenum, a reactive ion etcher using chlorine chemistry for etching Aluminum and III-IV compound semiconductors, and a High Density Plasma Chemical Vapor Deposition System for depositing high quality SiO2 from a silane source. The three systems must have common user interfaces, common connections to safety and fire suppression systems and, to the extent possible, common connections for utilities such as power, cooling water and process gases. The tools must be supplied with a suite of demonstrated recipes to meet NIST needs and process development support in the vendor's facility. In the aggregate, tools and support must meet the following requirements: 1. Capable of processing 3 inch, 100 mm and 150 mm wafers. 2. Automated load lock 3. Full computer control and recipe development software. 4. Automatic wafer-by-wafer data logging which records all tool parameters and user-entered data. 5. Wafer chuck system capable of cooling wafer to <10 C during processing with minimal edge exclusion. 6. Alumina-lined chamber; ICP source providing a minimum power of 2 kW. Source and/or chamber heating system to maintain a minimum temperature of 70C. 7. Proven and documented (via SEM images for etches, index and etch rate data for depositions) recipes for: a. Etching of Nb with 90'5? sidewall angle, etch rate > 200nm/min, >1:1 selectivity to resist and >10:1 selectivity to SiO2, - 5% uniformity across the wafer. b. Etching of Al with 90'1? sidewall angle, etch rate >150nm/min, >2:1 selectivity to resist, - 5% uniformity across the wafer. c. Etching of Al2O3 with >80? sidewall angle, etch rate >50 nm/min, >0.4:1 selectivity to resist, - 5% uniformity across the wafer. d. Etching of GaAs up to 5 micrometers thick with 90'5? sidewall angle, >5:1 selectivity to SiO2; GaAs and AlGaAs etch rate within 5% of each other. e. Growth of SiO2 from a silanesource with a wafer temperature <100C, deposition rate >50nm/min. Resulting oxide must have a pinhole density of <1/cm2 for a 300 nm thick film, index of refraction 1.45

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS