This Solicitation opportunity from Department Of Defense was posted on September 8, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
General Mitchell Field, 1919 East Grange Avenue, MILWAUKEE, WI, 53207, USA
Set-Aside
NONE
Documents
20
DOC
DOC, High priority: read this first1 page · q-and-a
HighAI Summary for 9-4-09 Clarifications to Posted FedBizOpps: Clarification/questions-and-answers document dated 9-4-09 (11:10) responding to solicitation or plan discrepancies. It addresses arsenic soil disposal responsibility, confirms all soils from the base are to be disposed of at an approved landfill, and provides a drawing clarification for slab reinforcing notes and schedule references (Sheets S200 and S101).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Architectural Standard Symbols and General Notes: Technical architectural document containing standard abbreviations, symbols legends, general construction notes, materials legends, and floor plan details. Includes specific guidance on building codes, fire ratings, and material specifications (e.g., concrete, gypsum board, wood). Dated January/August 2002, Drawing No. A10100A.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Civil 22X34 100% Drawings - Prime Beef Drive: Technical civil engineering specifications and site plan notes for the Prime Beef Drive project, involving the Wisconsin Air National Guard. The document includes 100% completion drawings, site removal notes, erosion control requirements, and detailed material specifications for asphalt, concrete, and utility installations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Door and Hardware Schedule Abbreviations: This document provides a reference list of abbreviations and units used within the Door and Hardware Schedule, dated August 26, 2009. It serves as a technical specification guide for interpreting hardware requirements.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Electrical Panel Schedules - Panel LA and Panel M: Technical electrical specifications and panel schedules for Low Voltage Relay Panel RP-1, Panel LA (Sections 1 and 2), and Panel M. The document details circuit loads, breaker capacities, phase distributions, and connected loads for lighting, receptacles, and HVAC equipment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fire Protection Plan - SH-1: Technical specifications and general notes for a Fire Protection Plan (Sheet SH-1). The document outlines requirements for fire department connections, fire hazard classifications, sprinkler system sizing, and installation coordination for sprinkler heads and fire-stopping penetrations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for General Plumbing Notes and Specifications: Technical document containing general plumbing notes, installation requirements, water calculation worksheets, and a plumbing pipelining legend. It includes specific technical constraints such as sanitary piping slopes, water heater schedules, and abbreviations for gas, air, and water systems.
DOC
DOC, High priority: read this first3 pages · q-and-a
HighAI Summary for HTUV0509003 Q&A / Response to Questions (8-27-09): August 27, 2009 response to questions for Recovery HTUV0509003 Security Forces CATM/CATS. The document compiles contractor questions and design team answers covering plumbing, mechanical, architectural, controls, door hardware, louvers, flooring, and specification clarifications. It includes revisions and confirmations to drawings/specifications, notes on current plan set issuance, and pending responses for certain control-system integration questions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mechanical Specifications and Equipment Schedules: Technical mechanical specifications and equipment schedules, including HVAC starter schedules, water-to-air heat pump details, energy recovery ventilator units, and electric cove heater specifications. The document contains detailed installation notes, ductwork standards (SMACNA), and equipment placement requirements.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for NGBWI 107446 Acoustical Panel Ceilings Specification: Specification Section 09 51 13 for acoustical panel ceilings, referenced to project NGBWI 107446. The document defines scope, performance requirements, LEED/environmental criteria, submittals, quality assurance, delivery/storage/handling, coordination, warranty, maintenance, and approved manufacturers. It includes technical criteria such as NRC, CAC, LR, fire resistance, recycled content, and installation conditions for ceiling panel systems.
DOC
DOC, High priority: read this first3 pages · q-and-a
HighAI Summary for Recovery HTUV0509003 Q&A / Solicitation Clarifications 09-03-2009: Response to questions dated September 3, 2009 for Recovery HTUV0509003, addressing Air National Guard solicitation clarifications. Includes answers on specifications, bid options, unit prices, LEED requirements, geothermal field layout, network and controls requirements, acoustical ceilings, paint designations, and substitution policy. Also notes an attachment for acoustical panel ceilings dated 09.03.09.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Structural 22X34 - General Notes and Foundation Plan: This document contains structural specifications, general notes, and foundation details for a project. It includes design wind loads (30 PSI), structural symbols, standard hook schedules for reinforcing bars, architectural abbreviations, and a concrete wall reinforcement schedule. It also provides specific guidance on helical piles and foundation wall elevations.
DOC
DOC, High priority: read this first1 page · q-and-a
HighAI Summary for Unknown solicitation Q&A on hazardous materials and arsenic soils: Q&A regarding specification 02 41 13, Part 1, 1.04.D on hazardous materials and conflicting plan notes about arsenic soils. The response clarifies that the Owner removal language is incorrect, states arsenic soils are not considered hazardous but must be removed by the contractor per applicable regulations, and notes the contractor is responsible for removing any hazardous or restricted soils as required.
DOC
DOC, High priority: read this first2 pages · amendment
HighAI Summary for W912J2-09-B-0002-0001 Amendment 0001: SF 30 continuation page showing Summary of Changes for solicitation/contract W912J2-09-B-0002-0001. The document updates Section 00010 and Section 00700 contract clauses for Project RECOVERY HTUV059003, a Security Forces CATM/CATS construction project at Wisconsin Air National Guard Base in Milwaukee, WI. It confirms project scope, NAICS 237990, bid options, magnitude, funding availability, HUBZone preference, and adds recovery-related and construction contract clauses. The content is an amendment/change notice.
DOC
DOC, High priority: read this first2 pages · modification
HighAI Summary for W912J2-09-B-0003 MOD 2 Summary of Changes: SF 30 continuation page for modification 2 to solicitation/contract W912J2-09-B-0003. The document contains a brief 'Summary of Changes' section, indicating this is an amendment or modification record, but no specific change details are included in the provided text.
DOC
DOC, High priority: read this first3 pages · modification
HighAI Summary for W912J2-09-B-0003 Modification 3: Modification 3 to contract W912J2-09-B-0003 adding CLIN 0004 (Bid Option 3 for rubber tile installation) and CLIN 0005 (Bid Option 4 for south side patio construction). Includes delivery schedules of 270 days ADC and government acceptance terms.
DOC
DOC, High priority: read this first34 pages · ifb
HighAI Summary for W912J2-09-B-0003 Security Forces CATM/CATS: Invitation for Bids (IFB) for the construction of a 4,100 square foot building to house a Combat Arms Training Simulator Room, maintenance offices, and bathrooms. The project includes demolition of mobile trailers and installation of specialized HVAC and security systems. The solicitation includes a base bid and two options (ceramic tile and landscaping), with a submission deadline of September 8, 2009. Award will be a Firm Fixed Price (FFP) contract based on the most advantageous price.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wisconsin Air National Guard Security Forces CATM and CATS Facility Project Manual: Project Manual and detailed specifications for the construction of the Security Forces CATM and CATS Facility at General Mitchell IAP, Milwaukee, Wisconsin (ANG No. HTUV 059003 / SEH No. NGBWI 107446), dated July 31, 2009. The document includes a comprehensive table of contents covering divisions 1 through 33, including general requirements, site work, concrete, electrical, HVAC, and utilities.
PDF
PDF, Low prioritysite-visit-log
LowAI Summary for Site Visit Log - Solicitation W9122-09-B-003: A site visit attendee log dated August 18 and 27, 2009, for solicitation W9122-09-B-003. The document lists companies and individuals who attended the site visit, including contact information for representatives from various international and domestic entities.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
11 updates
PhaseClosed
Posted
Presolicitation
Notice updated
Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Aug 27, 2009. The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Response Deadline
Deadline has passed
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → W7N8 Uspfo Activity Wi Arng
RECOVERY-THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912J2-09-B-0002. Scope of work consists of, but is not stictly limited to, construction of an industrial building at the Wisconsin Air National Guard Base (General Mitchell Field), 1919 East Grange Avenue, Milwaukee, Wisconsin, 53207. This is a construction project to include all plant, material, labor, supervision, permits and permit procurement to construct a 4100 square foot building that will house a Combat Arms Training Simulator Room, Combat Arms Training and Maintenance Room, offices and bathrooms. Project to provide demolition of two existing mobile trailers, cast-in-place concrete, standing seam metal roof, split-faced concrete masonry walls, fire sprinkler system, geo-thermal HVAC system with direct digital controls and a munitions vault with an intrusion detection system. Construction shall be performed in one phase and include providing temporary facilities for the Combat Arms Training and Maintenance function. This project has two bid options, Bid Option 1 is to provide full-height ceramic tile in the bathrooms and Bid Option 2 landscaping. Magnatude of the project is between $1,000,000 and $5,000,000. Bid Opening date will be on or about 27 August 2009. Construction time will be 270 calendar days from Notice to Proceed. The soliicitation will be available 15 calendar days from the date of this announcement. This project is an unrestricted acquisition. All responsible firms may submit an offer.***********
More opportunities from Department Of Defense → W7N8 Uspfo Activity Wi Arng