Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 2, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY- Swan Lake Day Use and Campground Paving

Awarded
AG-82B1-S-09-0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 8 hours ago

DEADLINE

in about 20 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The USDA Forest Service is soliciting bids for the Swan Lake Day Use and Campground Paving project located in Lake County, Montana. This project involves the reconstruction of roads, parking areas, and walking trails at the Swan Lake Ranger District within the Flathead National Forest, as well as the reconstruction of a portion of the campground main access road. Key work requirements include bituminous pavement pulverization and removal, scarification and reconditioning of surfaces, and the installation of crushed aggregate base, hot asphalt concrete, and root control geotextile. Additionally, the contractor will install a road closure gate and a corrugated steel pipe arch, apply seal coat and permanent pavement markings, and perform site seeding, fertilizing, and mulching. This competitive, firm-fixed-price contract is anticipated to be a 100 percent set-aside for HubZone firms under NAICS code 237310. The project is partially or wholly funded by the American Recovery and Reconstruction Act of 2009, with an estimated cost between 250,000 and 500,000 dollars. Performance is expected to begin around September 15, 2009, with a mandatory completion date of June 30, 2010. Requirements for award include registration in the Central Contractor Registration database, adherence to Davis-Bacon wage rates, and the provision of performance and payment bonds per the Miller Act.

General Info

Contract Value

$346,178.11

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

The project is located on the Swan Lake Ranger District of the Flathead National Forest, Lake County, Montana and is situated a, Swan Lake, MT, USA

Set-Aside

NONE

Award Issued Date

Documents

6

Amendment 001 to Solicitation AG-82B1-S-09-0020

PDF, High priority: read this firstamendment
High

IFB AG-82B1-S-09-0020 - Swan Lake Day Use and Campground Paving

PDF, High priority: read this firstifb
High

Solicitation AG-82B1-S-09-0020: Swan Lake Day Use and Campground Paving

PDF, High priority: read this firstrfp
High

Swan Lake Day Use and Campground Paving - Amendment 1

DOC, High priority: read this firstamendment
High

Wage Determination Montana - Highway Construction (MT080002)

PDF, High priority: read this firstwage-determination
High

swan-drawings.dwf

OCTET-STREAM

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 4:00 PM UTC to 6:00 PM UTC on Aug 17, 2009. The notice description changed.

Notice updated

Response deadline time changed from 6:00 PM UTC to 4:00 PM UTC on Aug 17, 2009. The notice description changed.

Notice updated

Response deadline changed from Aug 17, 2009 to Aug 31, 2009. The point of contact changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Im
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA
Contacts
William M. PfeiferContracting Officer

Full Description

Show more
SYNOPSIS OF ACQUISITION ACTION Note: this amendment corrects the date the solicitation will be available from July 6, 2009 (ORIGINALLY POSTED) to JULY 17, 2009. RECOVERY - This project will be partially or wholly funded under the American Recovery and Reconstruction Act of 2009 (http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=111_cong_bills&docid=f:h1enr.pdf). Interested offerors are encouraged to review the required clauses and reporting requirements for projects funded under the Act. These documents can be found in the Federal Acquisition Regulation (http://farsite.hill.af.mil or http://www.acquisition.gov/far), current Federal Acquisition circulars (http://www.arnet.gov/far/fac.html) and at the Recovery.gov website. It is anticipated that the award will be 100% set-aside for competitive HubZone firms as there are two or more qualified offerors under the NAICS code that could offer bids. It is anticipated that the NAICS code will be: 237310, Construction with a size standard of: $33.5 M The Product Service Code is: Z222 Anticipated Contract Type: Competitive and Firm Fixed Price FBO Product Code: Z The Forest Service intends to issue a solicitation for this project using FAR Part 14 procedures for sealed bidding. The solicitation package for this project should be available approximately July 6, 2009 and will be posted on the FEDBIZOPPS website, which will contain all information necessary to formulate and submit a responsive bid. A pre-bid meeting is expected, but a firm date has not yet been established. The project cost estimate is between $250,000 and $500,000. Performance and Payment Bonds will be required per the Miller Act and Davis-Bacon wage rates will apply. All responsible sources may submit a response which must be timely received to be considered for award by the U.S. Forest Service. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http:www.ccr.gov//. The project consists of reconstructing the Swan Lake Day Use roads, parking areas and walking trails along with reconstructing a portion of the Swan Lake Campground main access road. The major items of work include: existing bituminous pavement pulverization (roads and parking areas) and bituminous pavement removal (trails); road, parking area and walking trail scarification and reconditioning; furnishing and placing crushed aggregate base, hot asphalt concrete, and root control geotextile; furnishing and installing a road closure gate and 42-inch span x 29-inch rise corrugated steel pipe arch; applying seal coat and permanent pavement markings; and seeding, fertilizing and mulching the site.

More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Im

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS