THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER MACC CONTRACT N68711-04-D-3001, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION AND RENOVATION OF VARIOUS DRY UTILITIES AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO ARIZONA, CALIFORNIA, NEVADA AND NEW MEXICO. The MACC Contractors listed on this MACC Group 0036 are as follows: Stronghold Engineering Incorporated,
+1 (555) 000-0000; Synergy Electric Company,
+1 (555) 000-0000; and Syska Hennessy Group Construction, Inc.
+1 (555) 000-0000. NOTE: This is not a public opening, therefore, please contact the contractors listed above for copies of the solicitation, specifications, or drawings. The solicitation will not be made available on this website. Project Description: The intent of this RFP is to obtain all services, labor, materials and equipment necessary for the construction of AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) Project XDAT 051056P4 Replacement of 5kV Powerlines Substation A Phase 4 at Travis Air Force Base (AFB), California, complete and ready to use as required by the specifications and drawings provided in this Request for Proposal (RFP). The intent of this project is demolition and removal from service of the following (including a combination of removal and abandonment): 1.Substation A, 4.16 kV feeders A8, and A12 (partial), including cabling, connectors, and miscellaneous components.2.Existing 5 kV pad-mounted switch SW-200-1 (1 total).3.4.16 kV, Class OA pad-mounted transformers (3 total).4.Ductbanks and manholes along Travis Ave., First St., Burgan Blvd., and to various services transformers.5.Miscellaneous UG cabling, connectors, and components. New construction as follows (including installation of new system elements and modification of the existing system): 1.Installation of new 12.47 kV Feeder A29 from Substation A around the 400 area loop to a system tie point at the intersection of Travis Ave. and First St.2.Installation and connection of new 4-compartment pad-mounted switches to establish new cross-connect and isolation points within the 12.47 kV distribution system (8 total).3.Installation of new pad-mounted sectionalizing cabinets (2 total).4.Installation and connection of new 12.47 kV service transformers (3 total).5.Conversion of existing dual-voltage service transformers from 4.16kV to 12.47 kV operation and re-connection to the new 12.47 kV distribution system (18 total).6.Installation of new conductors, connectors, panels, splices, etc. to support the specified circuit changes.7.Installation/modification of ductbanks, conduits, manholes, and handholes to support the specified circuit changes - includes installation of new 4xx-series ductbank. The duration of the project is 380 calendar days from the date of award, which consist of 365 calendar days, and 15 calendar days for bonds submissions. Projected Issue Date of RFP to MACC Contractors: Approximately 5 May 2009. Construction Cost Limit is $1,000,000.00 and $5,000,000.00