Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 24, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reforestartion at LD3 and Pool 8 Island

Closed
W912ES-12-T-0076Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

2 days ago

DEADLINE

in 3 months

General Info

NAICS

115310 - Support Activities for Forestry

Place of Performance

MN, USA

Set-Aside

SBA

Documents

6

Amendment 0001 to Solicitation W81G6720747277

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912ES-12-T-0076

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W912ES-12-T-0076

PDF, High priority: read this firstamendment
High

Reforestation Maps - Boxelder Control and Peterson Tract

PDF, High priority: read this firstspecifications
High

Solicitation W912ES-12-T-0076: Reforestation and Control of Nuisance Trees

DOC, High priority: read this first19 pages · rfq
High

Solicitation W91E25-12-T-0076: Reforestation and Control of Nuisance Trees

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Apr 6, 2012 to Apr 10, 2012.

Deadline changed

Response deadline changed from Apr 10, 2012 to Apr 20, 2012.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
STATEMENT OF WORK REFORESTATION AND CONTROL OF NUISANCE TREES March 5, 2012 PART 1: Cut and treat boxelder trees Boxelder trees are growing along the perimeter of several forest restoration sites. The areas with heavy boxelder cover are shown in Maps 1-3. Cut all boxelder within 100 feet of the field edge. Boxelders under 6 inches diameter should be treated with herbicide. Using diesel fuel, fuel oil, kerosene or a commercial bark oil diluent, mix a 10% solution of Garlon 4, Element 4 or Tahoe 4 (active ingredient triclopyr). For a four gallon backpack tank this would be 0.4 gallon of Garlon or Tahoe 4 plus 3.6 gallons of diluent. Pathfinder II is triclopyr in a ready-to-use (RTU) form. It can be used for basal bark and cut stump treatment of boxelder. Spray from the base of the tree to a height of 12 to 15 inches from the ground. Boxelder over 6 inches diameter will be cut low to the ground below any branching. The cut surface of the stump and 12 to 15 inches of the remaining bark will then be treated with herbicide. The Corps of Engineers does not provide herbicide application equipment. Backpack sprayers are recommended for this task. PART 2: Cut and treat trees on erosion control dam Several species of trees are growing on the dam. See Map 1. All trees species, with the exception of aspen, should be cut and stump-treated with the same herbicide mix listed above. Trees should be cut on the top surface of the dam, as well as both the upstream and downstream slopes. As with boxelder, cut and treat the stump plus 12 to 15 inches of bark with triclopyr in bark oil diluents. For aspen (big tooth, quaking, cottonwood), do not cut the tree. Spray the lowest 15 inches of the bark, leaving the tree standing. PART 3: Plant trees at Peterson Tract along Rush River Collect 1,500 cuttings (live stakes) from live Cottonwood (Populus deltoides) saplings at location show on attached map. Plant cuttings shall be made from dormant spring season stock, prior to bud burst, and free from obvious signs of canker diseases. The diameter of each plant cutting shall be not less than 3/8 inch nor greater than - inch. The length of a plant cutting shall be a minimum length of 24 inches. Each planting cutting shall have at least four healthy buds. Cuttings must be planted within 24 hours on the adjacent planting area as indicated on attached map. Prepare 3,000 tree planting spots within a 15.7 acre area of land by using power weed trimmers to remove vegetation from a minimum 3' x 3' area. Space the planting spots approximately 15' from adjacent spots or from previously planted tree seedlings. Plant 1,500 cottonwood cuttings and approximately 1,500 bareroot and/or potted tree seedlings within the planting spots spaced relatively evenly throughout the 15.7 acres. Cuttings must be planted with live buds pointing up, a minimum of - to 2/3rds of cutting length below the soil surface, and healed-in properly to maximize soil contact around the subsurface portion of the cutting. Bare root and/or potted tree seedlings will be furnished by the Government and also planted randomly within the tree planting spots (1 seedling or cutting per spot). Proper care must be given to ensure seedling roots and cuttings are protected from heat and/or drying from the time they are removed from packaging or cut, until they are planted in the ground. Install weed barrier mats (3' x 3' fabric provided by the Government) around each planted cutting and seedling using 5 landscape staples (also provided by the Government) per mat. Also install provided spiral wrap tree protectors on any RPM seedlings. PART 4: Plant trees at Pool 8 Islands near Brownsville, MN Assist the Government and other volunteers in preparing tree planting spots on approximately 15 acres of newly constructed islands within the Mississippi River by using power weed trimmers to remove vegetation from a minimum 3' x 3' area. Space the planting spots from adjacent spots or from previously planted tree seedlings as per direction from the Government Site Coordinator. Plant cuttings, bareroot and/or potted tree seedlings within the planting spots spaced relatively evenly throughout the 15 acres. Cuttings must be planted with live buds pointing up, a minimum of - to 2/3rds of cutting length below the soil surface, and healed-in properly to maximize soil contact around the subsurface portion of the cutting. Cuttings, bareroot and/or potted tree seedlings will be furnished by the Government and also planted within the tree planting spots (1 seedling or cutting per spot) as per direction from the Government Site Coordinator. Proper care must be given to ensure seedling roots and cuttings are protected from heat and/or drying from the time they are removed from packaging until they are planted in the ground. Install weed barrier mats (3' x 3' fabric provided by the Government) around each planted cutting and seedling using 5 landscape staples (also provided by the Government) per mat. Also install provided spiral wrap tree protectors on any RPM seedlings. Boat transportation to and from the island tree planting sites will be provided by the Government. PART 5: Government Contact The Government contact for questions related to this contract is: contact@example.gov US Army Corps of Engineers Mississippi River Project, Environmental Section ATTN: Randy Urich 1114 South Oak Street La Crescent, MN 55947-1560 +1 (555) 000-0000, x2 (ofc) +1 (555) 000-0000 (cell) - Legend Work Items Boxelder Trees on Dam 0 0.035 0.07 0.14 Miles Boxelder Control Sites - Legend Work Items Boxelder Trees on Dam 0 0.05 0.1 0.2 Miles Boxelder Control Sites - Legend Work Items Boxelder Trees on Dam 0 0.0375 0.075 0.15 Miles Boxelder Control Sites

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS