This Solicitation opportunity from Government of Canada was posted on March 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rehabilitate Runway 11L-29R, 15 Wing Moose Jaw, Saskatchewan
Closed
MJ238821_CN81686CanadaSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Government of Canada → Defence Construction Canada - Western RegionView Agency
NAICS
N/A
Place of Performance
CANSet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyGovernment of Canada → Defence Construction Canada - Western Region
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Defence Construction Canada - Western Region
View Agency ProfileOffice AddressN/A
Contacts
Full Description
Show more
DEFENCE CONSTRUCTION CANADA (DCC) – MJ238821_CN81686 – Rehabilitate Runway 11L-29R, 15 Wing Moose Jaw, Saskatchewan
The work includes, but is not necessarily limited to, the supply of labour, material, supervision, and equipment necessary to reconstruct the Runway 11-29R at 15 Wing Moose Jaw, Saskatchewan.
A site visit has been arranged for the following date, time, and location. It is highly recommended that bidders attend this visit.
Date: Thursday, February 27, 2025
Time: 10:30am (local time)
Location: Room 216, Building 64, 15 Wing Moose Jaw, Saskatchewan
The estimated cost for this opportunity is in the range of $38,000,000.00
The Work must reach Substantial Completion no later than 544 calendar days after notification of contract award and must be completed no later than 30 calendar days after the date of Substantial Completion.
As per Acknowledgement Document, Item 7 – Bidders are advised that it is understood and agreed that in the event of their Tender being accepted within 30 (thirty) calendar days of the date and time stated for closing of tenders and their failing or refusing to carry out the contract in accordance with the terms of their Tender, their bid security, if required by the tender, (i) if in the form of a wire transfer, shall be forfeited to His Majesty the King in Right of Canada, or (ii) if in the form of a Bid Bond, the Bonding Company shall be liable in accordance with the Bond.
This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA).
The selected contractor will be required to hold a valid Designated Organization Screening (DOS), issued by the Contract Security Program (CSP) within Public Services and Procurement Canada (PSPC). Details concerning the Security Requirements for this project are identified in Amendment No.1 to the tender documents.
Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified.
Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.
DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.code : 1description : IBP Amount (as defined in the Supplementary Conditions), expressed in dollars ($)
Montant du VPA (tel que défini dans les conditions supplémentaires), exprimé en dollars ($)unitOfMeasure : Dollarweight : 10.00code : 2description : Mill existing asphalt pavement (100 mm typical) and remove from site; as per Specification Section 02 41 13, Paragraph 1.4.5
Fraisage du revêtement en asphalte existant (généralement 100 mm) et enlèvement du site; conformément au paragraphe 1.4.5 de la section 02 41 13 des spécificationsquantity : 123000unitOfMeasure : Square Metercode : 3description : Remove existing asphalt pavement full depth, remove from site; as per Specification Section 02 41 13, Paragraph 1.4.5
Enlèvement du revêtement en asphalte existant sur toute sa profondeur et enlèvement du site; conformément au paragraphe 1.4.5 de la section 02 41 13 des spécificationsquantity : 13300unitOfMeasure : Square Metercode : 4description : Remove existing concrete pavement full depth, remove from site; as per Specification Section 02 41 13, Paragraph 1.4.4
Enlèvement du revêtement de béton existant sur toute sa profondeur et enlèvement du site; conformément au paragraphe 1.4.4 de la section 02 41 13 des spécificationsquantity : 12750unitOfMeasure : Square Metercode : 5description : Common Excavation 300mm to subbase and remove from site; as per Specification Section 31 22 14, Paragraph 1.2.2
Excavation courante aux couches de fondation (300 mm) et enlèvement du site; conformément au paragraphe 1.2.2 de la section 31 22 14 des spécificationsquantity : 3825unitOfMeasure : Cubic Metercode : 6description : Common Excavation to subgrade and remove from site; as per Specification Section 31 22 14, Paragraph 1.2.2
Excavation courante au sol de fondation et enlèvement du site; conformément au paragraphe 1.2.2 de la section 31 22 14 des spécificationsquantity : 28600unitOfMeasure : Cubic Metercode : 7description : Remove existing 150mm subdrain pipe and supply and install new 200mm PVC subdrain pipe; as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines (150 mm) existantes, et fourniture et installation de nouvelles canalisations de drainage souterraines (200 mm) en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 4565unitOfMeasure : Metercode : 8description : Remove existing subdrain pipe and supply and install new 200mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes, et fourniture et installation de nouvelles canalisations de drainage souterraines (200 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 190unitOfMeasure : Metercode : 9description : Remove existing subdrain pipe and supply and install new 250mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes et fourniture et installation de nouvelles canalisations de drainage souterraines (250 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 220unitOfMeasure : Metercode : 10description : Remove existing 200mm subdrain pipe and supply and install new 250mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes (200 mm), et fourniture et installation de nouvelles canalisations de drainage souterraines (250 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 1025unitOfMeasure : Metercode : 11description : Remove existing 200mm storm water pipe and supply and install new 250mm Class V (140-D) reinforced concrete storm water pipe, as per Specification Section 33 44 00, Paragraph 1.4.1
Enlèvement des conduites d’évacuation des eaux pluviales (200 mm) existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (250 mm) en béton armé de classe V; conformément au paragraphe 1.4.1 de la section 33 44 00 des spécificationsquantity : 127unitOfMeasure : Metercode : 12description : Remove existing storm water pipe and supply and install new 375mm PVC storm water pipe; as per Specification Section 33 44 00, Paragraph 1.4.2
Enlèvement des conduites d’évacuation des eaux pluviales existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (375 mm) en PVC; conformément au paragraphe 1.4.2 de la section 33 44 00 des spécificationsquantity : 54unitOfMeasure : Metercode : 13description : Remove existing storm water pipe and supply and install new 650mm Class V (140-D) reinforced concrete storm water pipe; as per Specifications Section 33 44 00, Paragraph 1.4.1
Enlèvement des conduites d’évacuation des eaux pluviales existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (650 mm) en béton armé de classe V (140-D); conformément au paragraphe 1.4.1 de la section 33 44 00 des spécificationsquantity : 134unitOfMeasure : Metercode : 14description : Adjust manhole tops; as per Specification Section 02 41 13, Paragraph 1.4.2
Rajustement des couvercles de trous d’homme; conformément au paragraphe 1.4.2 de la section 02 41 13 des spécificationsquantity : 81unitOfMeasure : Eachcode : 15description : Supply and install new Type G Manhole; as per Specifications Section 33 05 14, Paragraph 1.3.2
Fourniture et installation de nouveaux trous d’homme de type G; conformément au paragraphe 1.3.2 de la section 33 05 14 des spécificationsquantity : 4unitOfMeasure : Eachcode : 16description : Subgrade preparation including scarification, re-grading, compaction, and proofrolling; as per Specifications Section 31 22 14, Paragraphs 1.2.5, 1.2.6
Préparation du sol de fondation, y compris scarification, nivellement, compactage et cylindrage d'essai; conformément aux paragraphes 1.2.5, 1.2.6 de la section 31 22 14 des spécificationsquantity : 53700unitOfMeasure : Square Metercode : 17description : Supply and install new geotextile; as per Specification Section 31 32 19.01, Paragraph 1.3.1
Fourniture et installation de nouveaux géotextiles; conformément au paragraphe 1.3.1 de la section 31 32 19.01 des spécificationsquantity : 24390unitOfMeasure : Square Metercode : 18description : Place and compact crushed concrete granular 500mm subbase, as per Specification Section 32 11 16, Paragraph 1.2
Mise en place et compactage d’une couche (500 mm) de fondation de béton concassé (granulaire); conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 4460unitOfMeasure : Cubic Metercode : 19description : Supply, place and compact new 500mm granular subbase; as per Specifications Section 32 11 16, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (500 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 4475unitOfMeasure : Cubic Metercode : 20description : Place and compact asphalt millings as granular 350mm subbase, as per Specification Section 32 11 16, Paragraph 1.2
Mise en place et compactage d’une couche (350 mm) de fraisats d’asphalte; conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 7600unitOfMeasure : Cubic Metercode : 21description : Supply, place and compact new 300mm granular base; as per Specification Section 32 11 23, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (300 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 23 des spécificationsquantity : 8735unitOfMeasure : Cubic Metercode : 22description : Supply, place and compact new 150mm granular base, as per Specification Section 32 11 23, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (150 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 23 des spécificationsquantity : 3255unitOfMeasure : Cubic Metercode : 23description : Supply, place and compact new hot mix asphalt (HMA) binder course (50 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.2
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 50 mm) de liaison en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.2 de la section 32 12 16 des spécificationsquantity : 125000unitOfMeasure : Square Metercode : 24description : Supply, place and compact new hot mix asphalt (HMA) surface course (50 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.1
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 50 mm) de roulement en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.1 de la section 32 12 16 des spécificationsquantity : 125000unitOfMeasure : Square Metercode : 25description : Supply, place and compact new hot mix asphalt (HMA) surface course (65 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.3
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 65 mm) de roulement en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.3 de la section 32 12 16 des spécificationsquantity : 20570unitOfMeasure : Square Metercode : 26description : Supply, place and finish new concrete pavement (350mm thick); as per Specification Section 32 13 13, Paragraph 1.3.1.1
Fourniture, mise en place et finition d’un nouveau revêtement (épaisseur de 350 mm) de chaussée en béton; conformément au paragraphe 1.3.1.1 de la section 32 13 13 des spécificationsquantity : 11500unitOfMeasure : Square Metercode : 27description : Complete full depth asphalt crack repairs (1m wide); as per Specification Section 32 01 18, Paragraph 1.3.1
Scellement complet des fissures de chaussée (largeur de 1 m); conformément au paragraphe 1.3.1 de la section 32 01 18 des spécificationsquantity : 3000unitOfMeasure : Metercode : 28description : Supply and install new neoprene joint sealant; as per Specification Section 32 32 23, Paragraph 1.3.1
Fourniture et installation d’un nouveau produit d’étanchéité pour joints en néoprène; conformément au paragraphe 1.3.1 de la section 32 32 23 des spécificationsquantity : 3670unitOfMeasure : Metercode : 29description : Place 100mm topsoil, hydroseed and fertilize all areas disturbed by work; as per Specification Section 32 92 21, Paragraph 1.2.2
Mise en place de terre végétale (épaisseur de 100 mm), ensemencement hydraulique et application d’engrais pour toutes les zones perturbées par les opérations; conformément au paragraphe 1.2.2 de la section 32 92 21 des spécificationsquantity : 42000unitOfMeasure : Square Metercode : 30description : Remove and reinstall existing runway approach lighting, edge lighting, and signage; as per all Section 34 Specification sections
Enlèvement et réinstallation du balisage lumineux d’approche, des feux de bord et de la signalisation de la piste; conformément à toutes les sections de la section 34 des spécificationsquantity : 1unitOfMeasure : Lump-Sumcode : 31description : Balance of Project - All other costs not included in items 2 to 30
Solde du projet —L’ensemble des autres coûts qui ne sont pas inclus dans les éléments 2 à 30quantity : 1unitOfMeasure : Lump-SumBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Montant du VPA (tel que défini dans les conditions supplémentaires), exprimé en dollars ($)unitOfMeasure : Dollarweight : 10.00code : 2description : Mill existing asphalt pavement (100 mm typical) and remove from site; as per Specification Section 02 41 13, Paragraph 1.4.5
Fraisage du revêtement en asphalte existant (généralement 100 mm) et enlèvement du site; conformément au paragraphe 1.4.5 de la section 02 41 13 des spécificationsquantity : 123000unitOfMeasure : Square Metercode : 3description : Remove existing asphalt pavement full depth, remove from site; as per Specification Section 02 41 13, Paragraph 1.4.5
Enlèvement du revêtement en asphalte existant sur toute sa profondeur et enlèvement du site; conformément au paragraphe 1.4.5 de la section 02 41 13 des spécificationsquantity : 13300unitOfMeasure : Square Metercode : 4description : Remove existing concrete pavement full depth, remove from site; as per Specification Section 02 41 13, Paragraph 1.4.4
Enlèvement du revêtement de béton existant sur toute sa profondeur et enlèvement du site; conformément au paragraphe 1.4.4 de la section 02 41 13 des spécificationsquantity : 12750unitOfMeasure : Square Metercode : 5description : Common Excavation 300mm to subbase and remove from site; as per Specification Section 31 22 14, Paragraph 1.2.2
Excavation courante aux couches de fondation (300 mm) et enlèvement du site; conformément au paragraphe 1.2.2 de la section 31 22 14 des spécificationsquantity : 3825unitOfMeasure : Cubic Metercode : 6description : Common Excavation to subgrade and remove from site; as per Specification Section 31 22 14, Paragraph 1.2.2
Excavation courante au sol de fondation et enlèvement du site; conformément au paragraphe 1.2.2 de la section 31 22 14 des spécificationsquantity : 28600unitOfMeasure : Cubic Metercode : 7description : Remove existing 150mm subdrain pipe and supply and install new 200mm PVC subdrain pipe; as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines (150 mm) existantes, et fourniture et installation de nouvelles canalisations de drainage souterraines (200 mm) en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 4565unitOfMeasure : Metercode : 8description : Remove existing subdrain pipe and supply and install new 200mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes, et fourniture et installation de nouvelles canalisations de drainage souterraines (200 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 190unitOfMeasure : Metercode : 9description : Remove existing subdrain pipe and supply and install new 250mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes et fourniture et installation de nouvelles canalisations de drainage souterraines (250 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 220unitOfMeasure : Metercode : 10description : Remove existing 200mm subdrain pipe and supply and install new 250mm PVC subdrain pipe (perforated); as per Specification Section 33 46 17, Paragraph 1.3
Enlèvement des canalisations de drainage souterraines existantes (200 mm), et fourniture et installation de nouvelles canalisations de drainage souterraines (250 mm) perforées en PVC; conformément au paragraphe 1.3 de la section 33 46 17 des spécificationsquantity : 1025unitOfMeasure : Metercode : 11description : Remove existing 200mm storm water pipe and supply and install new 250mm Class V (140-D) reinforced concrete storm water pipe, as per Specification Section 33 44 00, Paragraph 1.4.1
Enlèvement des conduites d’évacuation des eaux pluviales (200 mm) existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (250 mm) en béton armé de classe V; conformément au paragraphe 1.4.1 de la section 33 44 00 des spécificationsquantity : 127unitOfMeasure : Metercode : 12description : Remove existing storm water pipe and supply and install new 375mm PVC storm water pipe; as per Specification Section 33 44 00, Paragraph 1.4.2
Enlèvement des conduites d’évacuation des eaux pluviales existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (375 mm) en PVC; conformément au paragraphe 1.4.2 de la section 33 44 00 des spécificationsquantity : 54unitOfMeasure : Metercode : 13description : Remove existing storm water pipe and supply and install new 650mm Class V (140-D) reinforced concrete storm water pipe; as per Specifications Section 33 44 00, Paragraph 1.4.1
Enlèvement des conduites d’évacuation des eaux pluviales existantes, et fourniture et installation de nouvelles conduites d’évacuation des eaux pluviales (650 mm) en béton armé de classe V (140-D); conformément au paragraphe 1.4.1 de la section 33 44 00 des spécificationsquantity : 134unitOfMeasure : Metercode : 14description : Adjust manhole tops; as per Specification Section 02 41 13, Paragraph 1.4.2
Rajustement des couvercles de trous d’homme; conformément au paragraphe 1.4.2 de la section 02 41 13 des spécificationsquantity : 81unitOfMeasure : Eachcode : 15description : Supply and install new Type G Manhole; as per Specifications Section 33 05 14, Paragraph 1.3.2
Fourniture et installation de nouveaux trous d’homme de type G; conformément au paragraphe 1.3.2 de la section 33 05 14 des spécificationsquantity : 4unitOfMeasure : Eachcode : 16description : Subgrade preparation including scarification, re-grading, compaction, and proofrolling; as per Specifications Section 31 22 14, Paragraphs 1.2.5, 1.2.6
Préparation du sol de fondation, y compris scarification, nivellement, compactage et cylindrage d'essai; conformément aux paragraphes 1.2.5, 1.2.6 de la section 31 22 14 des spécificationsquantity : 53700unitOfMeasure : Square Metercode : 17description : Supply and install new geotextile; as per Specification Section 31 32 19.01, Paragraph 1.3.1
Fourniture et installation de nouveaux géotextiles; conformément au paragraphe 1.3.1 de la section 31 32 19.01 des spécificationsquantity : 24390unitOfMeasure : Square Metercode : 18description : Place and compact crushed concrete granular 500mm subbase, as per Specification Section 32 11 16, Paragraph 1.2
Mise en place et compactage d’une couche (500 mm) de fondation de béton concassé (granulaire); conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 4460unitOfMeasure : Cubic Metercode : 19description : Supply, place and compact new 500mm granular subbase; as per Specifications Section 32 11 16, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (500 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 4475unitOfMeasure : Cubic Metercode : 20description : Place and compact asphalt millings as granular 350mm subbase, as per Specification Section 32 11 16, Paragraph 1.2
Mise en place et compactage d’une couche (350 mm) de fraisats d’asphalte; conformément au paragraphe 1.2 de la section 32 11 16 des spécificationsquantity : 7600unitOfMeasure : Cubic Metercode : 21description : Supply, place and compact new 300mm granular base; as per Specification Section 32 11 23, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (300 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 23 des spécificationsquantity : 8735unitOfMeasure : Cubic Metercode : 22description : Supply, place and compact new 150mm granular base, as per Specification Section 32 11 23, Paragraph 1.2
Fourniture, mise en place et compactage d’une nouvelle couche (150 mm) de fondation granulaire; conformément au paragraphe 1.2 de la section 32 11 23 des spécificationsquantity : 3255unitOfMeasure : Cubic Metercode : 23description : Supply, place and compact new hot mix asphalt (HMA) binder course (50 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.2
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 50 mm) de liaison en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.2 de la section 32 12 16 des spécificationsquantity : 125000unitOfMeasure : Square Metercode : 24description : Supply, place and compact new hot mix asphalt (HMA) surface course (50 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.1
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 50 mm) de roulement en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.1 de la section 32 12 16 des spécificationsquantity : 125000unitOfMeasure : Square Metercode : 25description : Supply, place and compact new hot mix asphalt (HMA) surface course (65 mm lift); as per Specification Section 32 12 16, Paragraph 1.3.3
Fourniture, mise en place et compactage d’une nouvelle couche (couche de 65 mm) de roulement en bitume mélangé à chaud (HMA); conformément au paragraphe 1.3.3 de la section 32 12 16 des spécificationsquantity : 20570unitOfMeasure : Square Metercode : 26description : Supply, place and finish new concrete pavement (350mm thick); as per Specification Section 32 13 13, Paragraph 1.3.1.1
Fourniture, mise en place et finition d’un nouveau revêtement (épaisseur de 350 mm) de chaussée en béton; conformément au paragraphe 1.3.1.1 de la section 32 13 13 des spécificationsquantity : 11500unitOfMeasure : Square Metercode : 27description : Complete full depth asphalt crack repairs (1m wide); as per Specification Section 32 01 18, Paragraph 1.3.1
Scellement complet des fissures de chaussée (largeur de 1 m); conformément au paragraphe 1.3.1 de la section 32 01 18 des spécificationsquantity : 3000unitOfMeasure : Metercode : 28description : Supply and install new neoprene joint sealant; as per Specification Section 32 32 23, Paragraph 1.3.1
Fourniture et installation d’un nouveau produit d’étanchéité pour joints en néoprène; conformément au paragraphe 1.3.1 de la section 32 32 23 des spécificationsquantity : 3670unitOfMeasure : Metercode : 29description : Place 100mm topsoil, hydroseed and fertilize all areas disturbed by work; as per Specification Section 32 92 21, Paragraph 1.2.2
Mise en place de terre végétale (épaisseur de 100 mm), ensemencement hydraulique et application d’engrais pour toutes les zones perturbées par les opérations; conformément au paragraphe 1.2.2 de la section 32 92 21 des spécificationsquantity : 42000unitOfMeasure : Square Metercode : 30description : Remove and reinstall existing runway approach lighting, edge lighting, and signage; as per all Section 34 Specification sections
Enlèvement et réinstallation du balisage lumineux d’approche, des feux de bord et de la signalisation de la piste; conformément à toutes les sections de la section 34 des spécificationsquantity : 1unitOfMeasure : Lump-Sumcode : 31description : Balance of Project - All other costs not included in items 2 to 30
Solde du projet —L’ensemble des autres coûts qui ne sont pas inclus dans les éléments 2 à 30quantity : 1unitOfMeasure : Lump-SumBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.