Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REJECTED - Topton Borough Wastewater Treatment Plant Chlorination Tank Rehabilitation

Closed
Topton Borough, Berks CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

General Info

Place of Performance

Berks County, PA, USA

Set-Aside

NONE

Documents

2

Project 329024.301 - Topton Borough WWTP Chlorination Tank Rehabilitation Addendum 001

PDF, High priority: read this firstamendment
High

Topton Borough WWTP Chlorination Tank Rehabilitation - Project #343425.005

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Berks County
ContactsNo contacts available
OfficeBerks County, PA, USA
Organization / AgencyPennsylvania → Berks County
Office AddressBerks County, PA, USA
ContactsNo contact information available

Interested Companies (79)

Design Plastic Systems
Brave Industrial Paint
Mr. Rehab

See All 79 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Notice is hereby given that Borough of Topton will receive sealed bids online via the PennBid Program (http://pennbid.bonfirehub.com) until 1:00 PM prevailing time on August 4, 2025, for the Topton Borough WWTP Chlorination System Rehabilitation . The work includes but is not limited to all labor, materials, tools, oversight and permits required to repair and repaint the interior of the existing chlorination contact tank.
All bidding documents will be available online at no cost via the PennBid Program (http://pennbid.bonfirehub.com) beginning at 12:00 PM on June 27, 2025.
Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount of 10% of the total bid amount. A Performance and Payment Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. Prevailing Wage Rates shall apply.
Immediately following the due date and time, all bids received through PennBid will be opened online at the Engineer’s Office and referred to the Borough of Topton for final award. An abstract of the bids received will be available to bidders on PennBid following the date and time that bids are due as indicated above.
A pre-bid meeting will be held at 10:00 AM on July 14, 2025, at the Topton Wastewater Treatment Plant, 96 Pump Ln, Mertztown, PA 19539. All bidders are encouraged to attend. Questions may be submitted through PennBid’s “Messages/Public Q&A” tab on or before 3:00 PM on July 21, 2025 . Responses will be provided via PennBid to all registered parties.
The Borough of Topton reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days.

More opportunities from Pennsylvania → Berks County

Same awarding agency

NAICS: 237310
New
SLED
Old Route 22 Culvert Replacement Project
Solicitation # 036-26-010
Bethel Township in Berks County, Pennsylvania, is soliciting sealed electronic proposals via the PennBid Program for the Old Route 22 Culvert Replacement Project, solicitation number 036-26-010. The project scope involves the demolition and removal of an existing culvert pipe and concrete endwalls, the installation of a new 36 inch SLCPP culvert pipe with precast concrete endwalls, minor grading, placement of riprap and scour protection, and roadway restoration. Bids are due by 10:00 a.m. on November 11, 2026. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, based on a combination of lump sum and unit price evaluations. Proposals must include a bid bond or bank cashier's check for ten percent of the bid total, along with a non-collusion affidavit, a Workmen's Compensation Act affidavit, and an Act 127 Public Works Employment Verification Form. The project is subject to Pennsylvania Department of Labor and Industry prevailing wage rates and requires compliance with Buy America certifications for steel and iron products. Successful bidders must provide performance and payment bonds and maintain employer liability insurance with limits of 500,000 dollars per accident and employee. Performance begins within 30 to 60 days of the contract effective date or notice to proceed, with all work performed at 8541 Old Route 22, Bethel, PA.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 13 days
View Details
NAICS: 562910
SLED
Asbestos Abatement Project
Solicitation # 101426.0006
The Muhlenberg School District is soliciting sealed bids for an asbestos abatement project at Muhlenberg High School in Berks County, Pennsylvania. The project involves the removal and disposal of approximately 6,000 square feet of asbestos-containing blackboard and tack board adhesive on the first floor. Work is structured into five phases spanning from December 2026 through Summer 2027, with specific square footage targets for each phase. Bids must be submitted electronically via the PennBid Program by 10:00 PM on November 10, 2026, as paper bids will not be accepted. A non-mandatory pre-bid conference is scheduled for November 3, 2026, at the high school. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Requirements for submission include a bid security of at least ten percent of the bid amount, a non-collusion affidavit, a bidder qualification statement, and verification of compliance with the Public Works Employment Verification Act. The selected contractor must adhere to Pennsylvania prevailing wage rates and follow strict regulatory standards, including EPA AHERA and NESHAP regulations and OSHA asbestos standards. Performance and payment bonds are required, and final acceptance is contingent upon the work areas passing air clearance sampling. The project is governed by EJCDC C-700 Standard General Conditions, and the contractor is required to provide a detailed critical path method construction schedule.
Remediation Services

POSTED

9 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS