This Solicitation opportunity from California was posted on June 4, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Remodel Of 3361 Fruitland Avenue
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive remodeling and refurbishment of a single-family residence located at 3361 Fruitland Avenue in Vernon, California. The scope includes renovating approximately 1,308 square feet of interior space and a detached 400-square-foot garage, with work to be completed according to detailed drawings and specifications. A significant aspect of the project is the safe removal and disposal of hazardous materials such as lead and asbestos, requiring coordination with the city's consultant and proof of clearance before proceeding. Exterior improvements encompass demolition and reconstruction of concrete entry steps, sandblasting and stuccoing exterior walls, replacing windows and doors with energy-efficient vinyl and low E dual-pane units, and repairing or repainting fascia and other exterior elements. Interior work involves removing and replacing partition walls, installing drywall, texturing, painting, and updating fixtures, cabinetry, flooring, and appliances, with the city providing an appliance allowance and overseeing selection. The electrical system will be entirely replaced, including wiring, receptacles, lighting fixtures, and low-voltage cabling for computer and television systems, all in compliance with the 2016 California Electrical Code. Mechanical updates include installing a new gas-powered tankless water heater outside the residence, along with necessary gas and water line connections. Plumbing work involves replacing the entire sanitary drainage system with ABS piping, copper water lines, and gas lines, ensuring code compliance. Site work features replacing the lawn with sod and plantings, along with installing a smart irrigation system. The project is overseen by the City of Vernon, with a response deadline of June 20, 2019, and contact information provided for inquiries.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → City of Vernon
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
