Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIR GEODSS HVAC, F-631

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of work are the following; 1). Replace with new the existing ACCU concrete pad and pedestals outside of the facility, extend concrete chiller and water pumps pad, and install 1-ea expansion tank concrete pad inside of F-632, 2). Perform asbestos abatement for pipe insulation, 3). Replace 3-ea ACCU, 3-ea Chiller and 3-ea Chilled water pumps, 4). Replace all refrigerant lines and chilled water lines for F-632, 5). Replace 3-ea ACCU disconnect switches, 3-ea Chiller disconnect switches, 3-ea CHWP disconnect switches. 6). Replace RSC conduits and wirings from ACCU-1 , 2 & 3, Chiller-1, 2 & 3 and CHWP-1, 2 & 3 up to existing MCC-UPP and all controls 7). Provide new 40A & 20 A trip magnetic circuit breakers for ACCU-1, 2, 3 and CHWP-1, 2, 3., 8). Re-connect BMS connections from HVAC, 9). Update controls and installation of new Trane Tracer SC+ building automation system by Tech Rep., 10). Support Technical Representative for start up, testing and commissioning of the new AC system and DDC controls, 11). Support Technical Representative for testing adjusting and balancing of airduct system and 12). Support Technical Representative for testing adjusting and balancing of Chilled water lines for supply and return and chilled water pumps of the new AC system.