Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIR JP-5 FILL STAND AND PIPING SYSTEM, F-579

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Repairs based on DLA Scope of work. Installation of new canopy for F-579 TFS is completed per IDIQ QCR dated 24 May 2023 under WR# QF4075. Additional scope of work from QC8068 - The scope of work of the project are: 1. Provide and install new on/off station for pumps with light to indicate on/off status. Pump control system shall be integrated with TFS and MCC system. System shall be selected in accordance with UFC 3-460301, 4-4.1 j, 4-4.1.2 p, and 4-7.3, 2. Provide Emergency Fuel Shutoff (EFSO) capability at the pump shelter, EFSO systems shall be selected in accordance with UFC 3-460-01, 2-16, 4-4.1.2 m, and 4-7.3.1 e, 3. Repair electrical system. Replace all electrical systems within the pump shelter including all conduit, wiring, control systems and fixtures, but excluding existing lightning fixtures. 4. Remove existing underground electrical conduits, wires, bracket supports and other related accessories for 40 hp JP-5 pump and upgrade base on the new requirement 600 gpm, 5. Replace existing rusted pvc coated conduit runs from annunciator panel up to the existing nema 4x pull box before will enter to berm for tank 31, 6. Replace existing carbon steel piping that is still present in the F-429, 7. Replace existing 1200 & 600 gpm filter/separator in accordance with EI Spec 1581 (5th ed.) and UFC 3-460-01, 4-4.1.2 d), 4-6.6, 8. Provide and install 8 inch, 1200 gpm and 4 inch, 600 gpm basket strainer in accordance with UFC 3-460-01, 4-3.1.2 i), 4-6.4, 4-6.6.1 d) (9), 9. Replace 8 inch and 4 inch hydraulic operated diaphragm control valve in accordance with UFC 3-460-01, 4-6.6.1 d) (3) and 4-6.10, 10. Provide and install appropriate pressure and thermal relief on most segments in accordance with UFC 3-460-01, 4-3.1.2 j), 4-4.1.2 c), and 4-6.9.2, 11. Provide additional secondary piping and components in accordance with UFC 3-460-01, 4-3.1.2 and 4-4.1.2, including sample ports, pressure gauges, maintenance drains and vents, 12. Repair or replace pipeline support follow