Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO JAKE'S PLACE, F-292

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of this project is to 1]. Replace the corroded roof panels, gutters, downspouts, flashing,, cross bar and tighteners, apply Mesh Reinforced Elastomeric Coating (MREC) on roof surfaces, replace exterior doors and windows assembly, sandblast metal framings, and painting works, 2]. Demolish 1-each 7.5-tons Package A/C unit including interior/exterior supply/return ducting approx._40-lf, 3]. Remove 3/4" diameter rs and flexible conduit with wires approx._25-lf and 1-ea disconnect switch, including associated accessories, control thermostat, supports/fittings and 4]. Replace 13-each fluorescent lighting fixtures including the corroded conduits, switches, outlets, panels and all required hardware. Additional scope of work for the recommendation to permanently remove existing PACU and 1]. Installation of new Split Type A/C unit complete with all required suction/liquid line refrigerant, power supply wires, controls, hardware and accessories, 2]. Installation of new Window Type A/C unit complete with power supply wires, hardware and accessories, 3]. Installation of new In-Line Supply Fan and Wall Exhaust Fan , tied and ducted to Stainless Steel Fume Hood Exhaust System, complete with power supply wires, hardware and accessories, 4]. Installation of concrete pad for new Split Type A/C unit, 5]. Removal / re-installation or replacement of affected ceiling system, 6]. Removal of concrete pad for PACU unit, 7]. Provide wall opening for new Window Type A/C, Split Type A/C & other mechanical items, blank-off wall opening vacated by mechanical items and 8]. Install fix Window glass at bar area and painting of disturb surfaces and new work.