Replace Roof on the Perry Maintenance Garage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Iowa Department of Transportation is soliciting bids for the complete replacement of the roof on the Perry Maintenance Garage, with work requiring the removal of all existing roofing materials including flashings, gutters, and downspouts to expose the underlying rigid insulation board. The new roof system must consist of mechanically fastened rigid polyisocyanurate insulation achieving an LTTR rating of R-30, covered by a 1/4-inch adhered cover board and a 60-mil adhered EPDM membrane. Additional tapered insulation must be installed to ensure proper drainage to existing roof drains, and new edge flashing, gutters, and downspouts must match the existing quantity, profile, and color. The curb height for roof vents and pipe penetrations must be raised to accommodate the increased insulation depth. Bidders must respond to both specified lines in the items section to be considered compliant, and all work must be performed while keeping the building operational. The contract has a proposed start date of September 1, 2026, with an anticipated completion date of October 15, 2026, and all work must comply with Iowa DOT supervision and inspection protocols, requiring advance notice of at least 24 hours before any installed component is ready for inspection. Payments will be made monthly at 97% of the value of completed work and acceptable materials stored on-site, determined by the Iowa DOT. The bid opening is scheduled for August 20, 2026, at 1:00 p.m. CT, with remote access available via a Teams meeting and phone conference. Site visits are highly recommended and will occur on August 10 and 11, 2026, with all questions to be submitted through the Q&A Board or via email to the designated point of contact only. The Iowa DOT will award the contract based on cost and other factors including past performance, staffing, and adherence to schedule, and the agency is tax-exempt. Davis-Bacon wage provisions do not apply to this project.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Documents
(5)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Iowa
Same awarding agency
