Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on August 1, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replace Substation 1100 Switchgear

Awarded
80KSC0-19-R-0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
Solicitation 2026-RFP-0272 is a request for proposals from the City of Pasadena Water and Power Department to provide comprehensive wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves the maintenance and documentation of approximately 11,000 wood poles to ensure system reliability and compliance with CPUC General Orders 95 and 165. Key deliverables include georeferenced UAV reports, the identification of structural defects, and specific maintenance tasks such as the installation of trusses, guy guards, and pole tags. The contract is designed for an initial four-year term with two optional one-year extensions. Proposers must submit separate technical and price proposals via the City's eProcurement Portal by November 5, 2026. Evaluation is based on a points-based scoring system focusing on technical competence, safety practices, and experience, with specific 5-point preferences available for certified California small/micro-businesses or local Pasadena businesses. Mandatory requirements include FAA Part 107 certification for UAV operations, submission of Form AA-1 and AA-2, and a detailed quality assurance plan. Additionally, the contract prohibits the use of City data for training AI or machine learning models and requires strict adherence to ADA accessibility and prevailing wage laws.
Water & Power Department, Power Delivery

POSTED

2 days ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

2 days ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

2 days ago

DEADLINE

in 28 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 15 days

AI Contract Overview

Show more

NASA is seeking information from potential sources for the replacement of the electrical switchgear at Substation 1100 within the Logistics Facility K6-1547 at the John F. Kennedy Space Center in Florida. This one-year project has an estimated value between 500,000 and 1,000,000 dollars. The scope of work involves installing new service entrance switchgear with a main-tie-main configuration and auto-transfer scheme, integrated with the existing KCCS for remote monitoring and control. Additionally, the contractor must provide temporary generator power for the facility during replacement and conduct comprehensive power system and arc flash hazard analyses. Interested small businesses under NAICS code 237130 are invited to submit capability statements demonstrating their expertise in 5KV class electrical switchgear, power system analysis, and the operation of generators exceeding 500KW. Submissions must include company details, financial capability, and a record of relevant experience from the past five years. This notice is for planning purposes to determine competition levels and does not constitute a formal request for proposal or a commitment to award a contract.

General Info

Agency

N/A

Contract Value

$673,622

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

NASA/John F. Kennedy Space Center, Procurement, Kennedy Space Center, FL 32899, Kennedy Space Center, FL, 32899, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline added: May 30, 2019. The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
C. M. Julius WilliamsContracting Officer
Anthony M. CaruvanaContracting Officer

Full Description

Show more
Replacement of the Electrical Substation in the Logistics Facility K6-1547. Contracting Office Address NASA/John F. Kennedy Space Center, Procurement, Kennedy Space Center, FL 32899 Description SOURCES SOUGHT NOTICE Replace Substation 1100 Switchgear, PCN 99214. INTRODUCTION The National Aeronautics and Space Administration (NASA) at the John F. Kennedy Space Center (KSC) is soliciting information about potential sources for the Replacement of the Electrical switchgear in the Logistics Facility K6-1547 at Kennedy Space Center, Florida 32899. Vendors having the capabilities necessary to meet or exceed the stated requirements are invited to submit capability packages, appropriate documentation and references. The estimated price range of this one-year project is $500,000 to $1,000,000. SCOPE OF WORK The work includes replacement of existing service entrance switchgear, with new switchgear with main-tie-main configuration and auto-transfer scheme. Switchgear main-tie-main devices shall be electrically operated and metered, and be connected to the existing KCCS for remote monitoring and control. Generators shall be provided to temporary back feed the entire Logistics facility during the replacement of the switchgear. A complete power system (short circuit and coordination) and hazard analysis (arc flash) for the entire Logistics facility is also part of the scope of this work. Include also all other incidental related work. CAPABILITY STATEMENT It is requested that interested small business firms having the capabilities necessary to meet or exceed all aspects of the effort described herein, submit to the contracting office a capabilities statement demonstrating ability to perform the services listed above. The capability package shall be no more than eight (8) pages in length and printed in not smaller than 12 point type. The capabilities statement will consist of a: 1. Page cover sheet referencing Source Sought Notice "80KSC0-19-R-0014" Capabilities Statement - "Replace Substation 1100 Switchgear" at Kennedy Space Center, Florida 32899. And; up to 7 pages discussing: 1. Company Name, DUNS Number, Address, Description of Principal Business Activity, Primary Point of Contact (E-mail address and phone number). 2. Business size and number of employees. Specifically state whether your firm is a large or small business in NAICS Code 237130. Description of principal business activity; number of employees; and specifically identify if you are a HUBZone small business, a service-disabled veteran owned small business, an economically disadvantaged woman-owned small business, or an 8(a) small business. 3. Financial Capability - Provide bonding capacity of your firm and the most current Balance Sheet and Income Statement, and the firm's average annual revenue for the past 3 years. 4. Experience - Provide the number of years in business and listing of relevant work performed in the previous 5 years. Relevant work for the purposes of this Notice can be defined as, but not limited to, the following: - The contractor shall have demonstrated utility and power system construction experience with the procurement, installation, activation, testing, and documentation of 5KV class electrical switchgear. - The contractor shall have demonstrated experience with power system analysis (short circuit studies, protective device coordination studies) and electrical hazard (arc-flash) analysis as described in the SCOPE OF WORK. Contractor shall have demonstrated experience implementing, validating, testing, and documenting protective relay settings, instrument and control schemes, and networking of components for remote monitoring and control. - The contractor shall have demonstrated experience with power system electrical hazard analysis, detailed job hazard analysis, and the wearing arc-flash and shock prevention personnel protective equipment while working in the vicinity of energized equipment with energized insulated cables or un-insulated components present. - Experience with operating and installation of generator greater than 500KW to temporary power up an existing facility. - Capability packages must be submitted electronically, via e-mail, to C.M. Julius Williams, NASA Contract Specialist, and Randall Gumke, NASA Contract Specialist, at the following addresses: contact@example.gov and contact@example.gov before 02/22/19. NASA/KSC will review all responses that comply with the submission instructions using the following criteria: breadth, depth and relevancy of experience as it relates to the work described above. NASA does not plan to respond to individual responses and does not intend to post information or questions received to any website or public access location. DISCLAIMER: This Sources Sought Synopsis is for planning purposes only, subject to FAR Clause 52.215-3, entitled "Request for Information or Solicitation for Planning Purposes". It does not constitute a Request for Proposal, Invitation for Bid, or Request for Quotation, and it is not to be construed as a commitment by the Government to enter into a contract. Moreover, the Government will not pay for the information submitted in response to this Notice, nor will the Government reimburse an offeror for costs incurred to prepare responses to this Notice. This invitation to submit capability packages is for the purpose of determining the appropriate level of competition and/or small business subcontracting goals for a potential KSC acquisition. No solicitation exists at this time; therefore, do not request a copy of the solicitation. If a solicitation is released it will be synopsized on the Federal Business Opportunities Website, FedBizOpps, (https://www.fbo.gov/). Interested firms are responsible for monitoring the site for the release of any solicitation or synopsis. Failure to respond to this notice does not exclude any interested party from future consideration for proposals which may be announced or solicited by NASA.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS