Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on July 2, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replacement Bifacial Solar Array for NIST

Awarded
NISTRFQ-73-21-00472-NFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

6 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

22 days ago

DEADLINE

in about 2 months

General Info

Contract Value

$124,275

NAICS

221114 - Solar Electric Power Generation

Place of Performance

Gaithersburg, MD, 20899, USA

Set-Aside

SBA

Award Issued Date

Documents

12

NIST Building 101 Replacement Solar Array Statement of Need

PDF, High priority: read this firstsow
High

B-2+Attach+0+Provisions+and+Clauses.docx

DOCX

B-2+Attach+1+Tapered+Layout.pdf

PDF

B-2+Attach+2+Roof+Photos.pdf

PDF

B-2+Attach+3+Mechanical+Photos.pdf

PDF

B-2+Attach+4+DN52+Form+Template.pdf

PDF

B-2+Attach+5+N1260+Form+Template.pdf

PDF

B-2+Attach+6+Additional+Information.pdf

PDF

B-2+Solar+Array+Specifications+6222021.pdf

PDF

B-3+Attach+7+QandA+Amend2.pdf

PDF

B-3+Revised+Combined+Synopsis+Solicitation+Amend1.pdf

PDF

B-3+Revised+CSS+Amend+2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts

Full Description

Show more
Solicitation Amendment 0002: The purpose of this amendment is as follows: Answers to questions received in relation to the solicitation are provided as Attachment 7 to the solicitation The combined synopsis solicitation document is revised to include question and answer Attachment 7. No further questions will be accepted. All other aspects of the solicitation remain unchanged. The solicitation deadline remains Friday July 9, 2021 at 11:00 AM. _________ Solicitation Amendment 0001: The purpose of this amendment is as follows: The solicitation response instructions and evaluation criteria have been revised. A copy of the revised text is attached with tracked changes. Please review the revisions carefully. The solicitation question deadline is extended to Friday July 2, 2021 at 11:00 AM. All other aspects of the solicitation remain unchanged. __________ This is a Combined Synopsis / Solicitation for Commercial Items prepared in accordance with the format in FAR Subpart 12.6 - Streamlined Procedures for Evaluation and Solicitation of Commercial Items - as supplemented with additional information included in this notice. The solicitation is issued using simplified acquisition procedures under the authority of FAR Part 13. THIS ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION. QUOTATIONS ARE BEING REQUESTED AND A WRITTEN SOLICITATION DOCUMENT (i.e. STANDARD FORM) WILL NOT BE ISSUED. This solicitation is a Request for Quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2021-05 dated 03/10/2021. The associated North American Industrial Classification System (NAICS) code for this procurement is 221114 - Solar Electric Power Generation. The small business size standard is 250 Employees. This request for quotation is issued on a total small business set-aside basis. Only small businesses under the identified small business size standard are eligible for competition. DESCRIPTION OF REQUIREMENTS This is a new requirement replacing previously cancelled Request for Quotation No. NISTRFQ-73-21-00472. Please review the solicitation carefully. Background The National Institute of Standards and Technology (NIST) Engineering Laboratory (EL) used an existing 35 kWdc rooftop solar array on NIST Building 101 for research purposes. However, research efforts were paused as a result of a campus-wide reroofing effort. During the reroofing preparation work, the outdoor solar array portion of the existing solar system was damaged beyond repair. EL seeks to re-establish a solar photovoltaic (PV) system for research purposes that makes use of existing components, is compatible with site-specific constraints, and uses bifacial solar modules. The existing components, all currently installed indoors, include two inverters, two combiner boxes, and sections of five electrical conduits. The primary site-specific constraints are the available roof area and the requirement to avoid roof penetrations (i.e., must be a ballasted module racking). Objectives The primary purpose of this acquisition is the design, installation, and commissioning of a roof-top array of bifacial solar modules that are designed to integrate with two existing combiner boxes and two existing 15 kW-rated inverters. Installing a meteorological station is included in this requirement. The Contractor shall provide all services, materials, and equipment necessary for management and execution of the requirements identified in this Statement of Need and Solar Array Specifications documents. Scope of Work & Specific Tasks Please see the attached Statement of Need, Solar Array Specifications, and other relevant documents. The attached documents are summarized in the list below: 1. Combined Synopsis Solicitation 2. Statement of Need 3. Solar Array Specifications 4. Attachment 0: Applicable Provisions and Clauses 5. Attachment 1: Tapered Drawing of Roof 6. Attachment 2: Photos of Building 101 Roof Area 7. Attachment 3: Photos of Mechanical Mezzanine 8. Attachment 4: DN-52 Form Template 9. Attachment 5: N-1260 Form Template 10. Attachment 6: Additional Information Related to Requirements PERIOD OF PERFORMANCE The contract period of performance shall be 6 months from the date of notice to proceed. Assume notice to proceed will be granted within approximately three weeks after award; however, no work shall commence prior to a written notice to proceed. Notice to proceed will be provided only after Contractor badging is successfully completed. PLACE OF PERFORMANCE The place of performance shall be the NIST campus located at 100 Bureau Drive, Building 101, Gaithersburg, MD 20899. CONTRACT TYPE & PAYMENT TERMS A firm fixed price purchase order is anticipated. Payment shall be made on a NET30 basis using milestone payments following inspection and acceptance of individual deliverables. APPLICABLE PROVISIONS AND CLAUSES Please see the attached document for applicable provisions and clauses. Please ensure the highlighted provision sections are completed as part of any quotation submitted. SITE VISITS Site visits will be conducted by NIST personnel to allow potential Quoters to view the space where the solar array replacement and commissioning work shall take place, and to obtain a better understanding of the work required. Site visits will include an escorted view of the NIST roof where the array(s) will be installed and the mechanical mezzanine where the existing inverter(s) and combiner boxes are installed. Site visits will be unchanged from those held previously under cancelled RFQ No. NISTRFQ-73-21-00472; no new information will be provided. While not required in order to submit an offer, potential Quoters are strongly encouraged to schedule and participate in a site visit. However, as mentioned above, site visits under this solicitation will be unchanged from those held previously under cancelled RFQ No. NISTRFQ-73-21-00472; no new information will be provided. In no event shall failure to attend a site visit or to inspect the site constitute grounds for a claim after contract award. Site visits are available on June 28, 2021 and will be scheduled between the hours of 9:00 AM and 5:00 PM at NIST discretion. June 29, 2021 will be considered a rain date in case of inclement weather on the 28th. Site visits will be scheduled on the hour and will last approximately 45 minutes. One site visit may be held per requesting contractor, one contractor at a time. A maximum of two contractor participants may attend each site visit. It is estimated that two NIST employees will also be present for each visit, with a third NIST employee present via teleconference. Contractors must be physically present to participate in the site visit and may not participate via teleconference. Note that NIST may not be able to accommodate specific date and time requests for site visits. Site Visit Details To participate in a site visit, potential Quoters must request a visit via email to the Contracting Specialist, Ms. Lauren Roller, at contact@example.gov. Requests must be received not later than June 24, 2021 at 11:00 AM ET. Potential Quoters must provide the following information with their requests: Full name of each attendee (maximum of 2 attendees per request). The name must match the individual's photo identification (driver's license, passport, etc.) which will be presented at the NIST Security Office before the site visit. Company Name (If subcontractor) Prime Company Name Contact Information for each attendee, including email address and phone number NIST will respond to timely requests with confirmation of assigned site visit date and time information as well as site access guidance. NIST may not be able to accommodate all time and date preferences. Site access guidance will include COVID-19 safety requirements as indicated at this site: https://www.nist.gov/about-nist/visit/nist-visitor-and-contractor-protocols-mitigating-covid-19-exposure-nist-campuses. Contractors are required to familiarize themselves with the requirements at this website and must affirm compliance with all COVID-19 safety requirements prior to entering the NIST campus. This includes conformance with the current NIST health checklist and travel advisory requirements located at https://www.nist.gov/media/583331 (updated weekly). Safety requirements include mandatory mask wearing (note that masks with exhalation valves are not allowable) and appropriate social distancing for the duration of the visit. Questions will be allowed during the site visits. However, note that any questions asked during the site visits will be recorded, anonymized, and answered in the Question and Answer amendment associated with this solicitation. Photographs are not allowable at the site visits. Potential Quoters are cautioned that all terms and conditions of the solicitation remain unchanged unless they are changed by written amendment to the solicitation. It is the responsibility of each Quoter, prior to submitting a quotation, to seek clarification of any perceived ambiguity in the solicitation or created by an amendment of the solicitation. QUESTION AND ANSWER PERIOD CAR 1352.215-73 INQUIRIES (APR 2010): Quoters must submit all questions concerning this solicitation in writing electronically to Ms. Lauren Roller, Contract Specialist, at contact@example.gov. Questions must be received by or before July 2, 2021 at 11:00 AM ET. Any responses to questions will be made in writing, without identification of the questioner, and will be included in an amendment to the solicitation. Even if provided in other form, only the question responses included in the amendment to the solicitation will govern performance of the contract. (End of Provision). DUE DATE FOR QUOTATIONS All quotations must be submitted via email to Ms. Lauren Roller, Contract Specialist, at contact@example.gov. Submission must be received not later than July 9, 2021 at 11:00 AM ET. Note: Quoters must have an active registration at www.SAM.gov at time of offer submission to be considered for award. INSTRUCTIONS TO QUOTERS (Addendum to FAR 52.212-1) The Quoter's quotation shall be submitted electronically via email and shall consist of two volumes as detailed below. Each quotation volume shall include the Quoter's name, DUNS number, and point of contact information in a cover page, header/footer, or other easily identified location. The Contracting Officer intends to award a purchase order without discussions but reserves the right to enter into discussions if in the best interest of the Government. Volume 1: Technical Response This volume shall contain the Quoter's technical response. The technical response (not including table of contents, figures, schematics, cut sheets, or past performance information) shall not exceed ten (10) single-spaced, single sided pages or twenty (20) double-spaced, single sided pages. Text shall be no less than 12-point Arial or otherwise reasonably legible font in read-only Microsoft Word or searchable Adobe PDF format. The technical response shall include the name, title, phone number, and email address of the Quoter's primary point of contact and the individual authorized to negotiate on behalf of the Quoter (if negotiations are determined to be necessary). The technical response shall include: A complete design for the proposed solar array design which addresses the Statement of Need and Specifications document requirements, inclusive of: Rated DC capacity of the solar array (based on front-side illumination only) Array tilt angle Total number of solar modules within proposed array field A description of the ballast components, type and approximate cumulative weight A list of the proposed key newly-added components, including the model of solar module, the racking system, and the rapid shutdown device; cut sheets or links to cut sheets on these key components is also required 1-Line Electrical Schematic and Schematics for the Roof Rack System , An estimate of the annual energy production of the proposed solar system. Please state the method or computer program/model used to generate this estimate, along with information on the weather data file used. An estimate of the percentage of energy generated from the front side versus the backside of the bi-facial solar array. Affirmation of compatibility of quoted slip sheets/pads with the current roof cap sheet which is a TREMCO POWERply 300 FR. Affirmation that quoted products are not manufactured by Hoshine Silicon Industry Co. Ltd. Please see the relevant U.S. Customs and Border Patrol withhold release at this link: https://www.cbp.gov/newsroom/national-media-release/department-homeland-security-issues-withhold-release-order-silica A statement regarding whether the quoter and the quoter's supplier(s) follow the Solar Energy Industries Association (SEIA) Traceability protocol. If so, please provide documentation where possible. Statement of location(s) of manufacture for all quoted products, to the best of the quoter's knowledge based on reasonably available information. If possible, the quoter shall identify whether the quoted products use polysilicon or other components manufactured in the Xinjiang region of China. A statement regarding whether the location of manufacture for all quoted products is one in which independent audits are allowed, to the best of the quoter's knowledge based on reasonably available information. If yes, please provide documentation where possible. A brief narrative of the Quoter's technical and management approach to executing the installation and commissioning of the required solar array, including consideration for Architectural Design Review Board feedback scheduling. If subcontractors will be used, the Quoter shall provide the names of the companies and their expected roles. Past performance information to include information on at least three (3) purchase orders or contracts in which the Quoter performed work similar to the scope of this requirement. Past performance information provided shall be for work completed or substantially completed within the past ten (10) years. Past performance shall include the following information: Name of the Organization Supported Organization Point of Contact with Current Phone Number and Email Address Contract Number Period of Performance Dollar Value of the Contract Narrative describing the services performed. The narrative should make clear similarities to the scope of work outlined in this solicitation. Completed provision responses, from the provisions attached to this solicitation. Provisions requiring response are highlighted in yellow. Volume 2: Price Quotation This volume shall contain the Quoter's price quotation in read-only Microsoft Excel format, or in searchable PDF format. All figures must be rounded to the nearest hundredth. Price quotations shall be submitted on a firm fixed price basis in accordance with the contract line item numbering structure identified in this solicitation. Quotations shall be valid for 90 days after solicitation close. To assist the Government in evaluating firm fixed price quotations, the Quoter shall provide a breakdown of the proposed materials costs and labor costs. Quoters shall also include a proposed fixed price payment schedule based on requirement milestones/deliverables in relation to the deliverables table in the Statement of Need. Quoters may propose an alternate payment schedule than the sample potential payment schedule included in the Statement of Need. Optional deliverables shall be separate line items per the Contract Line Item Structure below. CONTRACT LINE ITEM STRUCTURE: Responsible Quoters shall provide pricing for the following line item: LINE ITEM 001: Replacement Solar Array for NIST Building 101 in accordance with the base requirements of the attached Statement of Need and Specifications documents. LINE ITEM 002: Array Tilt Reduction in accordance with Optional Requirement 1 of the attached Statement of Need and Specifications documents. LINE ITEM 003: Elimination of One Column of Modules on East Edge of Array in accordance with Optional Requirement 2 of the attached Statement of Need and Specifications documents. LINE ITEM 0004: One (1) Separate Leftover Bifacial Solar Module in accordance with Optional Requirement 3 of the attached Statement of Need and Specifications documents. LINE ITEM 0005: One (1) Separate Leftover Bifacial Solar Module in accordance with Optional Requirement 3 of the attached Statement of Need and Specifications documents. LINE ITEM 0006: One (1) Separate Leftover Bifacial Solar Module in accordance with Optional Requirement 3 of the attached Statement of Need and Specifications documents. LINE ITEM 0007: One (1) Separate Leftover Bifacial Solar Module in accordance with Optional Requirement 3 of the attached Statement of Need and Specifications documents. LINE ITEM 0008: One (1) Separate Leftover Bifacial Solar Module in accordance with Optional Requirement 3 of the attached Statement of Need and Specifications documents. EVALUATION CRITERIA AND BASIS FOR AWARD (Addendum to FAR 52.212-2) The Government intends to award a firm fixed price purchase order resulting from this solicitation to the responsible Quoter whose Quotation, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. The Government reserves the right to make an award to other than the lowest-priced Quoter or to the Quoter with the highest technical rating if the Contracting Officer determines that to do so would result in the best value to the Government. The Contracting Officer intends to award without discussions but reserves the right to initiate discussions if necessary. Upon receipt of Quotations, the Contracting Officer will review them to determine if each Quoter followed all of the Quotation preparation/submission instructions in this solicitation. A Quotation that did not follow the Quotation submission instructions to an extent that the Government cannot properly evaluate the Quotation in accordance with the stated evaluation factors may be deemed unacceptable and may not be further evaluated. The Government intends to evaluate quotations using the tradeoff method. The following factors will used to evaluate offers. Evaluation will consist of two steps: Step 1) a mandatory pass-fail criterion and Step 2) a trade-off best value evaluation based on non-price Factors A through C and Price factor D. Quoters which do not successfully pass the mandatory criterion will not be further considered. In determining best value for Evaluation Step 2, non-price factors A through C, when combined, shall be of greater importance than price, Factor D. Non-Price Factor A is more important than Non-Price Factors B and C. Non-Price Factors B and C are considered equally important. Mandatory Pass/Fail Criterion The Government will evaluate quotations to confirm that quoters have affirmed that quoted products are not manufactured by Hoshine Silicon Industry Co. Ltd to the best of the quoter's knowledge based on reasonably available information. The Government will not accept products manufactured by Hoshine Silicon Industry Co. Ltd, in accordance with the U.S. Customs and Border Patrol Withhold Release Order on Silica-Based Products Made by Forced Labor in Xinjiang. Quotations which provide affirmation that quoted products are not manufactured by Hoshine Silicon Industry, Co. Ltd. will move forward to Evaluation Step 2. Quotations which do not affirm that quoted products are not manufactured by Hoshine Silicon Industry, Co. Ltd. will be deemed unacceptable and removed from further consideration. Intentional falsification of information in an affirmation will be grounds for a quotation to be determined unacceptable. Factor A: Solar Array Design The Government will evaluate the Quoter's solar array design for degree of understanding of and conformance to NIST's requirements and specifications. NIST will evaluate the design for reasonableness, efficiency, and effectiveness in meeting or exceeding the requirements and specifications identified in this solicitation. Although not the only element to be considered, of particular interest will be the design array tilt and the backside gain provided by the array tilt versus the amount of ballast and the degree to which this ballast degrades the aesthetics of the overall array field. Also of particular interest, but not the only elements to be considered, will be 1) the height of the front edge of each module off of the roof deck; lower is preferred and 2) fair labor practices in the supply chain of products quoted. Products which do not use polysilicon from the Xinjiang region of China are strongly preferred. Products manufactured in areas that allow independent audits, as evidenced by quoter statement or, preferably, documentation, are strongly preferred. Products manufactured by companies that follow the SEIA Traceability Protocol are preferred. 2. Factor B: Technical and Management Approach The Government will evaluate the Quoter's technical and management approach to executing the installation and commissioning of the required solar array, including consideration for Architectural Design Review Board historical preservation constraints and feedback scheduling. The Quoter's technical and management approach will be evaluated for reasonableness, efficiency, and effectiveness, of completing the required work safely, accurately, and on schedule. Although not the only element to be considered, of particular importance is ability to meet schedule requirements. The approach shall also be evaluated for the reasonableness of proposed methods of communication with the Government on any and all issues that may arise in performance of this requirement. NIST will also consider the proposed approaches to meeting the National Electric Code (NEC) for reasonableness and effectiveness. 3. Factor C: Past Performance: The evaluation of past performance information will consider the extent to which the Quoter's past performance for work completed or substantially completed within the last ten years demonstrates the capability and capacity to provide successful solar array design, timely installation, and commissioning services for solar arrays. The term - Quoter here is defined as the prime contractor and any of its primary subcontractors. The Government may contact provided references. The Government may also use data obtained from other sources. The Government will consider the relevance of the Quoter's previous contracts to the subject requirement, and the Quoter's performance on the previous contracts. Quoters without a record of relevant past performance or for whom information on past performance is not available, will not be evaluated favorably or unfavorably on Past Performance, and will be assigned a Neutral rating. 4. Price Proposed pricing will be evaluated but not scored. Price evaluation will determine whether the proposed price is complete, fair, and reasonable in relation to the RFQ requirements.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 513210
New
Federal
Subscription to a Mathematical Bibliographic and Expert Reviews Database
Solicitation # SS-NB135000-27-00002
The Department of Commerce National Institute of Standards and Technology (NIST) is conducting market research through a Combined Sources Sought Notice and Notice of Intent to Award a Sole Source Contract under solicitation number SS-NB135000-27-00002. The objective is to secure campus-wide online access to a curated mathematical bibliographic and expert review database for researchers at the Gaithersburg, Maryland, and Boulder, Colorado campuses. This resource is critical for the NIST Research Library and Museum to support the measurement science mission by enabling researchers to evaluate proof validity, track citations, and discover peer-reviewed mathematical findings. The required database must contain over 3 million items of American and European mathematical sciences literature, featuring bibliographic information, abstracts, and direct links to original articles. Key technical requirements include the ability to search by Digital Object Identifier (DOI) and the provision of email alerts for new results or citation changes. The service must be hosted externally with access provided via IP authentication. Interested respondents under NAICS code 513210 are requested to provide corporate details, company size status, and information regarding existing GSA Multiple Award Schedule contracts by October 29, 2026.
Software Publishers

POSTED

6 days ago

DEADLINE

in about 12 hours
View Details
NAICS: 484230
New
Federal
Combined Synopsis/Solicitation for Spent Fuel Cell Shipment(s)
Solicitation # 1333ND27QNB610AMD
The National Institute of Standards and Technology Center for Neutron Research requires packaging and shipping services to transfer spent fuel elements from its facility in Gaithersburg, Maryland, to the Department of Energy Savannah River Site near Aiken, South Carolina. This requirement is structured as a single firm-fixed-price purchase order consisting of one base shipment to be completed by December 31, 2028, with an optional second shipment to be completed by December 31, 2030. The contractor is responsible for providing all necessary project management, labor, and equipment, including the shipping cask, transfer cask and basket, and all rigging and lifting machinery required for movement. The procurement is classified under NAICS code 484230 for specialized long-distance trucking. Award will be granted to the lowest priced, technically acceptable quoter, with evaluations based on technical capability to meet or exceed the Statement of Work and price reasonableness. Strict adherence to Nuclear Regulatory Commission and Department of Transportation regulations is required, including compliance with 10 CFR 73 for information security. All bidders must maintain active registration in the System for Award Management and provide a technical quotation and a firm-fixed-price quotation. Payment will be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform System.
Specialized Freight (except Used Goods) Trucking, Long-Distance

POSTED

6 days ago

DEADLINE

in 25 days
View Details
NAICS: 236210
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

10 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS