Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract involves the complete replacement of motorized steam control zone valve stations and heating control panels at various New York City Housing Authority (NYCHA) developments located within the borough of Manhattan. The scope includes the removal of existing control wiring, valves, gauges, and piping associated with the current steam control stations, followed by the installation of new components including MEPCO RTMS-type motorized steam control valves, gate valves, strainers, by-pass valves, and all necessary fittings and insulation. The contractor is responsible for testing, calibrating, and ensuring leak-free piping and proper operation of all new equipment. The replacement heating control panels must match the existing models or those specified by NYCHA, with all control and electrical wiring reconnected to facilitate full functionality. The project term is set for three years with two optional one-year extensions at NYCHA’s discretion. Contractors must adhere to NYCHA’s Section 3 and M/WBE requirements by uploading related documentation through the eComply system, not directly in bid submissions. A non-mandatory virtual pre-bid conference will be held to provide clarifications, and the solicitation outlines a timeline for submission of questions and related responses. The contract also offers guidance on control cable installation, specifying multi shielded twisted pair cables with stringent construction and temperature specifications. Materials and installation practices must align with manufacturer recommendations, best trade practices, and existing system parameters, ensuring continuity and compliance throughout the replacement effort.
General Info
Place of Performance
NY, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
SCOPE OF WORK:
The work to be done under this Contract consists of providing all labor, materials, equipment and other incidental items required to complete the following:
Remove all control wiring from the motorized steam control valve to the terminal box in the tank room. Disconnect the pressure and compound gauges’ connection from zone valve station. Remove existing steam control zone valve stations including motorized steam control valves, all gate valves, by pass valves, strainers and all associated piping. All valves removed not claimed by NYCHA shall become contractor’s properties and shall be legally disposed. Reconnect the existing pressure and compound gauges to the new steam control zone valve station. Provide new adequate control wiring with conduit from the new motorized steam control valve to the existing terminal box in the tank room. New control cables shall be as specified in Sec. C of the SOW. In the opinions of NYCHA that existing control cables could be reused, NYCHA will give contractor the directions. Test the equipment in all modes of operation. Check piping for leaks. Calibrate new motorized steam control valves to agree with settings as indicated on the heating control panel. Replace heating control panel. The new heating control panel shall be the same model as the one removed or as directed by NYCHA. Reconnect all existing control wiring and electrical wiring to new panels for the proper operation. Install new steam control zone valve stations as per manufacturer’s recommendation and best trade practice.
A new steam control zone valve station shall include the following:
A new motorized steam control valve. New valve shall be MEPCO RTMS type or equal. Two new gate valves, before and after motorized steam control valve - ate valves shall be of iron body, OS and Y type, 125 psig steam or 200 WOG rating. A new strainer before the motorized steam control valve - strainer shall be of the Y type with valve blowdown and shall have cast iron body and baskets shall be brass, monel or stainless steel. No plugs will be permitted. All gate valves, strainer, and piping shall be the same sizes as the motorized steam control valve. A new by-pass valve on steam by-pass which shall be globe type rising stem, of same class rating and material as specified for gate valves - by-pass valve shall be one size smaller than the motorized steam control valve. Provide all required unions, reducers, fittings, hangers and miscellaneous components which comprise the steam station. Provide modifications and alterations to the existing piping for the proper installations of new steam control zone valve stations, when required. Provide new asbestos free insulation to the new steam control zone valve station. Materials and thickness shall be the same as the existing conjunction piping.
If adequate control cables are required for the proper operations of new heating control panels, contractor has two (2) options:
Use the spare conductors from the existing control cable. OR
As approved and directed, utilize the existing underground spare conduits to install new adequate control cables. This work shall be compensated by allowance.
New control cables shall be of multi shielded twisted pair type (STP) with a temperature rating 200°C.
Each conductor to be of No. 16 AWG stranded or solid tinned copper wire, covered with no less than 0.010 in concentric wall of color coded Teflon (TFE) insulation.
Conductors are to be formed into multi-conductor cable, uniformly round, shielded with tinned copper and covered with a concentric jacket or Teflon impregnated fiberglass.
TERM: 3 years plus two one-year extensions (at the discretion of NYCHA).
Section 3 and M/WBE: Please be advised that the Section 3 REO & OEO Plans and the M/WBE Utilization Plan & Waiver and other related documentation must be uploaded via eComply, https://nycha.ecomply.us/. Do not include Section 3 or M/WBE documentation within your bid submission via iSupplier. For assistance with eComply log-in, please contact eComply Tech support at contact@example.gov. For assistance with M/WBE Utilization Plan and Section 3 REO/OEO Plan submission in eComply, please contact NYCHA’s SMP Vendor Diversity team at contact@example.gov.
Pre-Bid Conference. A non-mandatory virtual Pre-Bid Conference will be held on March 4th, 2025 at 10:30 AM and will be conducted remotely via Microsoft Teams meeting. Although attendance is not mandatory at the Pre-Bid Conference, it is strongly recommended that all interested Bidders attend, and that Bidders thoroughly review bid documents in advance of the meeting.
To participate in the Pre-Bid Conference, please follow the instructions below:
Microsoft Teams Meeting
Join on your computer or mobile app: click to join meeting
Option 1: Copy and paste the below in browser:
https://teams.microsoft.com/l/meetup-join/19%3ameeting OTI0ZDM1YTEtODkyMC00MmNmLThhYWYtYTJjMjMwNTU3YmEy%40thread.v2/0?context=%7b%22Tid%22%3a%22709ab558-a73c-4f8f-98ad-20bb096cd0f8%22%2c%22Oid%22%3a%22d3ad4d7d-b23c-46b6-a970-2e5863640413%22%7d
Meeting ID: 241 271 569 167 Passcode: 4qw6pP3g
Option 2: Call in (audio only) +1 (555) 000-0000,241271569167# United States, New York City
Phone conference ID: 241 271 569 167 #
RFQ Timeline:
RFQ Question Submission Deadline 3/7/25 at 2:00PM
Question and Answer Release Date 3/14/25 at 2:00PM
Similar Contracts
Same NAICS industry code
More opportunities from New York → NYC Housing Authority
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS