Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Energy was posted on April 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

*REQUEST FOR INFORMATION* Space Reactor Industrial Base Assessment

Closed
INL-26-040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

1

RFI-+Space+Reactor+Assessment_Final.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
ContactsNo contacts available
OfficeIdaho Falls, ID, 83415, USA
Office AddressIdaho Falls, ID, 83415, USA
ContactsNo contact information available

Full Description

Show more

Request for Information


Space Reactor Industrial Base Assessment


THIS IS NOT A REQUEST FOR PROPOSAL. DO NOT SUBMIT PROPOSALS IN RESPONSE TO THIS NOTICE.



Purpose


The Department of Energy (DOE) is conducting a Space Reactor Industrial Base Assessment to identify gaps in the U.S. industrial base and recommend actions to close them. The assessment is mandated by National Science and Technology Memorandum 3 (NSTM 3, April 14, 2026), which implements Executive Order 14369, Ensuring American Space Superiority (December 18, 2025).


The specific mandate: assess the readiness of the U.S. nuclear reactor industrial base to produce up to four space reactors within five years, covering reactor design, long-lead-time components, and fuel allocation or production.


This RFI, and the broader assessment it informs, supports DOE's mission to develop and enable the use of space nuclear power systems to advance U.S. scientific, exploration, and national security objectives — in coordination with sponsoring agencies and as directed by Space Policy Directive-6, "National Strategy for Space Nuclear Power and Propulsion" (December 21, 2020).


This RFI solicits industry input to inform that assessment. It is technology-inclusive — no specific design or technology solution is presumed.



What This RFI Is Asking For


The goal is to identify constraints, not collect capability statements.


Responses should focus on what is hard, what is missing, what is at risk, and what government actions would help. Respondents should address only the areas relevant to their expertise.



Scope


The assessment covers the nuclear power unit — from the reactor core through the power conversion system (PCS). It excludes the spacecraft bus, avionics, launch vehicle, and other mission-level systems.


Topical Area


Examples


Nuclear fuel -  Enrichment, fabrication, fuel forms


Design capability - Workforce, nuclear data, material performance data, modeling & simulation tools


Non-fuel core components - Radiation shielding, Coolant, heat transfer mechanisms, reflectors, moderators, structural components


Instrumentation & control - Radiation hardened components supporting space reactor relevant temperatures, control systems and software


Power conversion systems - Stirling, Closed Brayton Cycle, Other


Infrastructure capabilities - Ground test facilities, irradiation facilities, integrated vehicle testing, launch safety qualification facilities, safeguards (e.g. if HEU)



Parameter envelope for this assessment


This assessment is technology-inclusive; respondents should therefore describe their capability against the parameter bands below rather than against any specific design, and identify which bands their product or capability can serve. Respondents whose offerings are parameter-agnostic (for example, workforce services or cross-cutting modeling tools) may note that and skip.


  • Electrical power class — <10 kWe | 10–40 kWe | 40–100 kWe | >100 kWe
  • Fuel form class — HALEU TRISO | HALEU metallic | HEU metallic | Other
  • Primary coolant/heat transport — Heat pipe | Liquid metal | Gas | Other
  • Core thermal power — <50 kWt | 50–250 kWt | 250–500 kWt | >500 kWt
  • Mission profile — Orbital | Lunar surface | Deep space


Questions


Q1 — What do you make?


List the products, components, or materials your organization produces or develops for space nuclear reactor applications. For each, state:


  • Current status: in production, prototype, or design
  • Whether it requires significant adaptation for a space reactor application

Q2 — What are your biggest production constraints?


Describe the challenges to producing your product(s) at the rate and quality required for a campaign of up to four units in five years. Address whichever of the following are relevant:


  • Design maturity — Is the design stable enough to commit to production?
  • Manufacturing capacity — Can existing facilities meet the required output?
  • Materials and supply chain — Are critical inputs available at scale?
  • Workforce — Are sufficient skilled workers available or trainable in time?
  • Qualification and testing — What certification or test requirements create schedule risk?
  • Facilities and infrastructure — Are the right facilities available, accessible, and funded?
  • Rate capability — units per year achievable at current steady state, the rate achievable with 24–36 months of warning and adequate funding, and the non-funding ceiling (the rate beyond which money alone will not raise output).
  • Other constraints — Are there other factors not captured above that constrain production readiness?

If your organization spans multiple product lines, address each separately.


Q3 — What can't be fixed with money alone?


For your longest-lead items, identify the constraints that additional funding cannot resolve on its own — for example, regulatory timelines, facility construction, workforce development, or irreducible process durations.


For each constraint, explain:


  • The underlying cause
  • What would be required to resolve it
  • Any external dependencies (facilities, services, suppliers)
  • Whether alternatives exist
  • The schedule consequences if those dependencies are delayed or unavailable

Q4 — Where are your sole-source or foreign-source dependencies?


Identify any critical input that is:


  • Sole-sourced — only one qualified domestic supplier exists, or
  • Foreign-sourced — the supplier or source material originates outside the United States

For each, provide: the item, the supplier or country of origin, and the production risk if that source is disrupted. Additionally, if you believe you are the sole or primary U.S. supplier of any product or capability relevant to space reactor production, identify it.


Q5 — Are you a unique U.S. source?


Are you the sole or primary U.S. supplier of any product or capability relevant to space reactor production? If so, identify it.


Q6 — What actions are needed, and who should take them?


For each challenge identified above, recommend a specific action. Structure your response by timeframe:


Near Term (Next 12 months)


  • What must happen immediately to avoid foreclosing options?
  • Who should act — government, industry, or a public-private partnership?
  • What specific gap does the action address?

Longer Term (Years 1–5)


  • What investments, policy changes, or infrastructure development are needed over the longer term?
  • Who should act, and what gap does it address?

Q7 — Anything else we should know?


  • Are there any additional items or information that would be useful in furtherance of the stated purpose of this RFI?


Information Protection


Individual responses will be kept confidential. Specifically:


  • Responses will not be shared with other respondents or published in attributed form
  • The final report will present findings in aggregate by subsystem area, without identifying companies unless they provide explicit written consent
  • Responses will not be used for company rankings or procurement down-select decisions
  • The assessment team is aware that some respondents are direct competitors; data handling reflects this

This assessment is conducted by Idaho National Laboratory (INL) on behalf of the Department of Energy, Deputy Assistant Secretary for Nuclear Reactors. Because INL also develops space reactor technology, analytical independence is maintained: individual company responses are not shared with INL reactor development programs, and the assessment team operates under DOE direction.



How to Respond


Submit responses by email no later than May 5, 2026.


Submissions: contact@example.gov


Questions: Sebastian Corbisiero, National Technical Director, DOE Space Reactor Program — contact@example.gov


Respondents are encouraged to submit candid assessments, including commercially sensitive information where relevant. Any proprietary information must be clearly marked as such.




Disclaimers


This RFI is issued for information and planning purposes only. It is not a solicitation for proposals. Per FAR 15.201(e), responses are not offers and cannot form a binding contract. Submission is voluntary and does not affect eligibility for any subsequent solicitation. Battelle Energy Alliance (BEA) will not reimburse response preparation costs, is not obligated to acknowledge submissions, and may share responses with government personnel and FFRDCs and Government support contractors.



More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

New
Federal
ATR Loop Pressurizer Fabrication
Solicitation # INL-27-001
Battelle Energy Alliance, LLC, acting as the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory, is seeking Expressions of Interest for the fabrication of one ASME Section VIII, Division 2 stainless steel pressure vessel for the ATR Loop Pressurizer (1A-NE Loop). The scope of work includes the fabrication, inspection, and physical testing of a vertically oriented, leg-mounted vessel with radial side arms, including the supply of all materials, mounting leg stands, spray nozzles, and lifting lugs. Key technical requirements include a design pressure of 2500 psig, a design temperature of 668 degrees Fahrenheit, and a 60-year design life. The vessel must be constructed from Type 347 and 316 stainless steel and comply with strict nuclear and structural standards, including ASME NQA-1 (2022), AISC 370, and ASCE seismic design codes. The selected vendor will be responsible for shop drawing development, hydrostatic testing at a minimum of 3415 psig, and load testing of lifting lugs. Quality assurance is paramount, requiring a quality program equivalent to ASME NQA-1, full volumetric inspection of side-arm weld joints, and an ASME U-stamp certification. The final product must be cleaned to Class B standards, preserved per STD-7020 A, and delivered in a forklift-compatible horizontal container to WestOne Logistics in Idaho Falls, Idaho. This EOI process serves as a qualification step to identify capable vendors for a subsequent Request for Proposal, with a submission deadline of November 6, 2026.

POSTED

2 days ago

DEADLINE

in 10 days
View Details
NAICS: 562119
Federal
E-Waste Collection Events
Solicitation # INL-26-057
Battelle Energy Alliance LLC, the Management and Operating Contractor for the Department of Energy owned Idaho National Laboratory, is seeking Expressions of Interest from qualified recyclers to organize residential electronic waste collection events. This initiative supports a research project comparing battery-containing device collection strategies in states with and without electronics recycling laws. The goal is to determine if successful methods from regulated states can be effectively applied to nonregulated states to increase collection volumes and public awareness. Eligible locations include a wide range of nonregulated states such as Alabama, Florida, Ohio, and Wyoming, though certain regions of Idaho are excluded. Selected vendors will be required to compile data on existing residential collection trends, organize two to three new collection events per organization, and implement multi-channel advertising campaigns. All activities must be completed by September 30, 2027, with detailed reporting on participant numbers and waste quantities. Participating entities must provide proof of downstream management and industry certifications, such as R2 or e-Stewards. This EOI process, with a submission deadline of November 13, 2026, serves as a preliminary screening to identify qualified vendors who may be invited to participate in a formal Request for Proposal process.
Other Waste Collection

POSTED

28 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS