Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Request for Prequalification for Upgrades and Equipment Replacement at Three (3) Wastewater Locations: Belair Estates, Chancery Lane and Sixteen Mile Creek, in the Town of Oakville. Category 1: General Contractor, Category 2: Electrical Subcontractor and

Active
W-3526A-A-26International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Regional Municipality of Halton has issued a Request for Pre-qualification (RFQ) for upgrades and equipment replacement at three wastewater pumping stations in Oakville: Bel Air Estates, Chancery Lane, and Sixteen Mile Creek. The project scope encompasses mechanical, electrical, instrumentation controls, SCADA, civil structural, and building mechanical upgrades. Specifically, work includes replacing sewage pumps, process piping, and valves at Chancery Lane, and updating PLC panels and level instrumentation at Sixteen Mile Creek. The procurement is divided into three categories: General Contractor, Electrical Subcontractor, and Temporary Bypass Subcontractor. To ensure operational continuity, the selected providers must manage temporary bypass pumping and station isolation. The selection process occurs in two stages, with the current pre-qualification phase evaluating respondents based on demonstrated experience in similar projects, staff qualifications, corporate history, and health and safety programs. Key requirements include a CPO-accredited Occupational Health and Safety Management System (OHSMS) and specific bonding capacities: at least 5.25 million CAD for General Contractors and 750,000 CAD for Electrical Subcontractors. Submissions must be uploaded via the Halton Region bidding portal by October 8, 2026. Qualified respondents will be invited to participate in the subsequent Request for Tenders stage, anticipated as early as December 2026.

General Info

Halton Region RFQ for wastewater pumping station upgrades in Oakville due October 8, 2026.

Agency

Region of HaltonView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(1)

W-3526A(A)-26 Upgrades and Equipment Replacement at Three Wastewater Pumping Stations

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRegion of Halton
ContactsNo contacts available
OfficeCAN
Organization / Agency
Region of Halton
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
Refer to project document

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Region of Halton

Same awarding agency

NAICS: 541330
International
Provision of Engineering Services for Wastewater Main Installation on Britannia Road, Tremaine Road, Lower Base Line Road and Watermain Installation on Tremaine Road, in the Town of Milton
Solicitation # P-1325-26
The Regional Municipality of Halton has issued Request for Proposals P-1325-26 for professional engineering services to support the design and installation of watermain and wastewater infrastructure in the Town of Milton. The project focuses on Britannia Road, Tremaine Road, and Lower Base Line Road to accommodate growth in the Milton Education Village and Southwest Milton. The scope encompasses the full project lifecycle, including preliminary and detailed design, contract tender preparation, and construction phase services. Key infrastructure includes 600 mm and 300 mm watermains and wastewater mains, with some portions utilizing trenchless tunneling methods. All work must adhere to the Region of Halton Linear Design Manual and MECP guidelines. The contract is governed by the 2018 MEA/CEO Agreement and associated supplementary conditions, with a phased performance period starting in January 2027 and concluding with warranty expiry in September 2031. Award selection is based on a weighted score where the technical proposal accounts for 80 percent and the cost proposal accounts for 20 percent. Financial provisions include upset limits for geotechnical and hydrogeological investigations, as well as construction phase allowances. Proponents must comply with strict submission requirements, including the Halton Region Vendor Code of Conduct and mandatory health and safety training. The deadline for proposal submission is October 8, 2026.
Engineering Services

POSTED

8 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS