Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Indiana was posted on May 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposals - Commercial Energy Assessments - SEEL PROGRAM

Closed
RFP #2025-ESD - COMMERCIAL ENERGY ASSESSMENTS - SEEL PROGRAMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

6 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

22 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The City of Bloomington's SEEL program is a funding and technical assistance initiative aimed at supporting local nonprofits and small businesses within the city limits in implementing energy retrofit and solar projects. Since its inception in 2021, the program has provided financial support for a range of upgrades, including solar installations, weatherization, lighting, refrigeration, ventilation, cooling, and water heater improvements. Eligible organizations receive funds to cover the costs of an energy assessment and up to $10,000 for qualifying efficiency upgrades, with the contractor responsible for conducting general energy assessments rather than in-depth evaluations like ASHRAE Level 2. The program aligns with the city's Climate Action Plan, targeting a 16% increase in electricity efficiency and a 12% reduction in natural gas consumption based on 2018 levels. The city is seeking proposals from qualified companies to serve as pre-approved contractors capable of conducting commercial energy assessments under the SEEL program. The selected contractor will work closely with the city to maximize the number of assessments performed annually, supporting the program’s goal of enhancing energy efficiency across Bloomington. The solicitation, titled "Request for Proposals - Commercial Energy Assessments - SEEL PROGRAM," was posted on May 12, 2025, with a deadline for responses set for May 27, 2025. The contract size ranges from $500,000 to $2,000,000, and interested firms can contact Julie Martindale via email or phone for further information.

General Info

Place of Performance

IN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIndiana → City of Bloomington
Contacts1 person available
OfficeN/A
Organization / AgencyIndiana → City of Bloomington
Office AddressN/A
Contacts

Full Description

Show more
The City of Bloomington’s SEEL program is a financing and technical assistance program for nonprofits and community institutions to complete energy retrofit and solar projects. Active since 2021, the program has provided funds for organizations to improve building efficiency and performance. Eligible projects for funding have included solar installation, as well as weatherization, lighting, refrigeration, ventilation, cooling, and water heater upgrades. The eligibility criteria to participate in the SEEL program include small businesses and nonprofit organizations located within the Bloomington city limits. The SEEL program will provide funding to cover the cost of an energy assessment and $10,000 for a qualified energy efficiency upgrade. The Contractor shall provide a general energy assessment and shall not conduct in-depth energy assessments such as an ASHRAE Level 2 or above. The SEEL program supports Climate Action Plan Goal EB 2 to increase energy efficiency citywide 16% for electricity and 12% for natural gas of 2018 values.  The City of Bloomington invites proposals from companies specializing in conducting energy assessments for commercial properties to participate in the SEEL program as the pre-qualified contractor. The selected Contractor will collaborate with the City of Bloomington to maximize the number of commercial-scale energy assessments on an annual basis.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS