Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REQUEST FOR STATEMENT OF QUALIFICATIONS DESIGN SERVICES FOR FIRE STATION NO. 2

Closed
RFQ-2026-0001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
Public Safety Building Space Needs Assessment and Renovations
Solicitation # RFP27-009
Glynn County, Georgia, has issued Request for Proposal RFP27-009 seeking a qualified architectural and planning firm to conduct a comprehensive Space Needs Assessment for the Police Department and provide design services for the renovation of the facility's second floor. The project is divided into two primary phases: an initial assessment to evaluate existing conditions, staffing, and security requirements, followed by the development of construction documents, engineering plans, and cost estimates specifically for the second-floor renovation. The selected consultant must ensure all designs adhere to accessibility, life safety, and law enforcement-specific security and access control standards. Proposals must be submitted electronically via the County's eProcurement portal by November 12, 2026, at 1:30 pm, consisting of a separate technical proposal and fee proposal. Evaluation is based on a weighted system focusing on professional qualifications (25%), project manager and team experience (25%), cost (18%), understanding of project scope (15%), firm reputation (15%), and local preference (2%). Required documentation includes a representation affidavit, Georgia Security and Immigration affidavits, and proof of ADA compliance. The successful contractor must maintain general liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as 1 million dollars in automobile insurance and workers compensation. The contract requires adherence to the Georgia Security and Immigration Compliance Act and the implementation of equal employment opportunity policies. Payments are processed within 30 days following the validation of applications for payment by the contract administrator. A site visit for the second floor of the Glynn County Police Department is scheduled for October 23, 2026.
PROCUREMENT

POSTED

about 10 hours ago

DEADLINE

in 22 days
NAICS: 541310
New
SLED
ARCHITECTURAL AND ENGINEERING DESIGN SERVICES
Solicitation # 25-R09
The Stanislaus Council of Governments (StanCOG) is soliciting proposals for architectural and engineering design services to modify its facility at 1407 I Street in Modesto, California. The primary objective is to convert a former bank teller area into a boardroom and meeting chamber capable of accommodating a 16-member board, agency staff, and the public, featuring a dais for 17 members, a speaker's podium, and provisions for acoustic separation and Spanish-language interpretation. A secondary objective involves remodeling the agency's new office space. The project encompasses a full design lifecycle, including programming, schematic design, construction documents, bidding, and construction administration. Selection will be based on demonstrated competence and professional qualifications in accordance with California Government Code section 4525 et seq. Proposers must be registered in SAM.gov and eligible to receive federal funds, adhering to 2 CFR Part 200, FTA Circular 42201.G, and Title 49 CFR Part 29 regarding debarment and suspension. The contract requires compliance with California Labor Code Section 1775 for prevailing wage rates and mandates adherence to the Americans with Disabilities Act and DOT non-discrimination provisions. Submissions must include a technical proposal limited to 30 pages and a separate cost proposal featuring fixed fees for each phase. Payment is processed monthly within 30 calendar days of receiving an acceptable invoice.
Project Delivery

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Utah

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 541310
New
SLED
Architectural and Engineering Design Services — Rec Center Locker Room Renovation
Solicitation # 26-082-RFP
The City of West Sacramento is soliciting proposals for architectural and engineering design services to renovate approximately 3,378 square feet of locker room facilities at the West Sacramento Recreation Center. The project, identified as CIP-60022, aims to replace deteriorated flooring, grout, and ventilation with a modern, functional design across the women's, men's, and family locker suites. The work is structured into three fiscal year phases: Phase 1 focuses on plumbing and floor/wall finishes, Phase 2 addresses ventilation, and Phase 3 covers lockers and benches. A critical requirement is the development of a construction phasing plan that allows the facility to remain in continuous public operation. The selected consultant will serve as the design professional of record, responsible for producing coordinated construction documents and 3D renderings at 30, 65, and 95 percent milestones. Key regulatory requirements include compliance with the 2010 ADA Standards for Accessible Design and the 2022 California codes, with the Division of the State Architect serving as the authority having jurisdiction. Proposals are due by December 4, 2026, and will be evaluated based on proven ability, cost-effectiveness, qualifications, and acceptance of the City's standard contract. The contract incorporates federal award provisions, including certifications regarding debarment, suspension, and the Byrd Anti-Lobbying Amendment for awards exceeding 100,000 dollars.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Dinuba is soliciting Statements of Qualifications from architectural and engineering firms to provide professional design and related services for the construction of Fire Station No. 2. This project aims to expand emergency response capabilities as identified in the City's updated Fire Master Plan. The selected consultant will be tasked with reviewing and advancing existing preliminary floor and site plans through final design, construction documents, and the delivery of a code-compliant facility on City-owned property. The scope of work encompasses all architectural and engineering disciplines, cost estimating, permitting, agency coordination, bidding assistance, and construction administration. The consultant must collaborate with City and Fire Department staff to validate operational requirements and recommend modifications to ensure the facility is functional and cost-effective. Interested firms must submit their qualifications by October 26, 2026, in response to solicitation RFQ-2026-0001.

General Info

Dinuba seeks architectural and engineering firms to design and build Fire Station 2.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1

City of Dinuba - Design Services for Fire Station No. 2 RFQ

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Dinuba
Contacts1 person available
OfficeCA, USA
Organization / AgencyCalifornia → City of Dinuba
Office AddressCA, USA
Contacts
Greg Chastain

Full Description

Show more
The City of Dinuba is seeking Statements of Qualifications (SOQs) from qualified architectural and engineering firms to provide professional design and related services for the City's proposed second fire station. The selected consultant will be responsible for reviewing and advancing the existing preliminary floor plan and site plan through final design and construction documents, including all required architectural and engineering disciplines, cost estimating, permitting and agency coordination, bidding assistance, and construction administration services necessary to deliver a complete, functional, and code-compliant fire station. The City of Dinuba Fire Department provides fire suppression, emergency medical response, and other emergency services from its existing fire station located at 496 E. Tulare Street. The City recently updated its Fire Master Plan, which identified the need for a second fire station to enhance emergency response capabilities and accommodate current and future service demands. The proposed second fire station will be constructed on City-owned property. The City has prepared a preliminary floor plan and site plan for the proposed facility. The Dinuba Fire Department command staff has identified preliminary operational requirements, project features, and design elements for the new fire station. The selected consultant shall review and evaluate the preliminary plans and requirements in collaboration with City and Fire Department staff and utilize its expertise in fire station and essential services facility design to validate the project scope and recommend modifications, as appropriate, to provide a functional, efficient, code-compliant, and cost-effective facility.

More opportunities from California → City of Dinuba

Same awarding agency

NAICS: 541611
SLED
UTILITY RATE STUDY WATER, SEWER, AND SOLID WASTE DISPOSAL
Solicitation # RFP-2026-0002
The City of Dinuba is soliciting proposals from qualified consultants to conduct a comprehensive utility rate study for its water, sewer, and solid waste disposal services. The primary objective is to establish service costs and develop five-year financial plans for the period of FY 2028–29 through 2032–33 to ensure the long-term financial sustainability of the City's enterprise funds. The selected consultant will be responsible for analyzing current system data, including the City's groundwater wells, distribution pipelines, wastewater collection system, and franchise hauler services, to recommend equitable and implementable rates. All work must comply with state and federal regulations, specifically Proposition 218. The project is expected to be completed within 16 to 18 months following the notice to proceed, with a target contract award date of December 8, 2026. The scope of work includes financial analysis, customer impact assessments, and public outreach, with a requirement for 60 days of technical support following the first rate change implementation. An optional Bid Alternate 1 is available for a storm drain fee study. Proposals must be submitted as searchable PDFs to the Business Manager by November 23, 2026. Evaluation will be based on a weighted scoring system considering qualifications, approach, and schedule, though the lowest cost is not guaranteed to be the highest-ranked proposal. The successful firm must enter into a Professional Services Agreement, meet specific insurance and indemnification requirements, and provide a project organization chart identifying key personnel.
Administrative Management and General Management Consulting Services

POSTED

8 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS