Restoration Projects Statewide Order Draft Program Environmental Impact Report

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Merced Irrigation District, in collaboration with state agencies including the Central Valley Flood Protection Board and the California Department of Water Resources, is executing a habitat restoration project under Permit No. 20083 authorized by California Code of Regulations Title 23 Article 3 Section 6. The project involves excavating approximately 75,000 cubic yards of dredged mine tailings from the Merced River channel, with 45,000 cubic yards being screened and strategically placed within the active river channel to construct a functional sequence of pools and riffles designed to enhance salmonid rearing and passage. The work connects a hydraulically linked pond to the main river stem, installs large woody structures within the floodway to increase habitat complexity, and relocates excess material to a pre-existing 1.4-acre pond located outside the floodway on the project’s north side. The overarching goal is ecological restoration within the lower San Joaquin River watershed, specifically improving habitat connectivity and spawning conditions for native fish species. The project is funded by a $2,480,872 grant from the California Department of Water Resources, with the environmental review process completed under the California Environmental Quality Act, resulting in a prepared Environmental Impact Report and associated regulatory approvals. The place of performance is located approximately 1.4 miles upstream of Snelling in Merced County, California, centered around the Merced River channel and extending to the adjacent off-channel pond. While no formal federal contract structure, line-item pricing, or FAR-based clauses are present, the project operates under state regulatory authority with oversight from the Central Valley Flood Protection Board as the responsible agency for inspection and acceptance. Payment and administrative coordination are managed through the State Water Resources Control Board and the Department of Fish and Wildlife using check, cash, or credit as payment methods, with no electronic invoicing systems such as WAWF or IPP in use. There is no defined period of performance, delivery schedule, or FOB terms documented, and no specific technical inspection criteria, quality standards, or packaging requirements beyond environmental compliance have been specified. The applicant, Merced Irrigation District, is recognized as a state agency with no formal small business or socioeconomic certifications, and while key contacts including Michael Morris and Jordan Robbins serve as primary points of communication, no formal COR, COTR, or PCO roles are designated in the records. Approval is contingent upon adherence to the approved EIR, implementation of mitigation measures, and compliance with all state permitting requirements, with

General Info

Excavate 75,000 cubic yards of tailings to restore river habitat, reconnect pond, and install woody structures for ecological improvement.

Agency

California → Merced Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Merced River Salmonid Habitat Restoration - Above Henderson Park Notice of Determination

PDFnotice-of-determination

Permit No. 20083 Above Henderson Park Habitat Rehabilitation Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Merced Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Merced Irrigation District
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Michael MorrisSurvey Project Manager

Full Description

Show more
Approval of Permit No. 20083, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To excavate approximately 75,000 cubic yards of dredger mine tailings along the Merced River channel. Approximately 45,000 cubic yards of the excavated material will be screened and placed within the active channel to create a pool and riffle sequence for fish rearing and passage. Excavation and material placement will directly connect a hydraulically connected pond to the Merced River main stem. Large woody structures will be placed within the floodway. Excess excavated material will be placed within an existing 1.4-acre pond on the north side of the project area outside of the floodway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1
Solicitation # W912P826BA075
This is an unrestricted procurement under NAICS code 237990 for heavy and civil engineering construction, specifically targeting maintenance dredging of the Mermentau River between station -16+00 and 250+00, requiring the complete removal of all material above elevation -17.0-ft MLG and its deposition on the Gulf Shoreline west of the Mermentau jetties. The work will be awarded as a single firm fixed price contract through an Invitation for Bid, with an estimated value between $10 million and $25 million. All qualified businesses may submit bids, but large businesses must comply with subcontracting plan requirements as outlined in FAR 19.1 and FAR 52.219-9. The solicitation, identified by number W912P826BA075, will be issued on Sam.gov with no paper copies provided; interested parties must monitor the site for announcements and access all documents electronically. Compliance with SAM registration is mandatory for eligibility to receive an award, and vendors are encouraged to register as interested vendors on Sam.gov and post subcontracting opportunities on the SBA’s Subnet. The point of contact for the solicitation is Nakiea Butler of the U.S. Army Corps of Engineers, New Orleans District, reachable via email. The solicitation is scheduled to be posted August 8, 2026, with bids due by August 24, 2026.
W07V Endist New Orleans

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.