Restoration Projects Statewide Order Draft Program Environmental Impact Report

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Merced Irrigation District, in collaboration with state agencies including the Central Valley Flood Protection Board and the California Department of Water Resources, is executing a habitat restoration project under Permit No. 20083 authorized by California Code of Regulations Title 23 Article 3 Section 6. The project involves excavating approximately 75,000 cubic yards of dredged mine tailings from the Merced River channel, with 45,000 cubic yards being screened and strategically placed within the active river channel to construct a functional sequence of pools and riffles designed to enhance salmonid rearing and passage. The work connects a hydraulically linked pond to the main river stem, installs large woody structures within the floodway to increase habitat complexity, and relocates excess material to a pre-existing 1.4-acre pond located outside the floodway on the project’s north side. The overarching goal is ecological restoration within the lower San Joaquin River watershed, specifically improving habitat connectivity and spawning conditions for native fish species. The project is funded by a $2,480,872 grant from the California Department of Water Resources, with the environmental review process completed under the California Environmental Quality Act, resulting in a prepared Environmental Impact Report and associated regulatory approvals. The place of performance is located approximately 1.4 miles upstream of Snelling in Merced County, California, centered around the Merced River channel and extending to the adjacent off-channel pond. While no formal federal contract structure, line-item pricing, or FAR-based clauses are present, the project operates under state regulatory authority with oversight from the Central Valley Flood Protection Board as the responsible agency for inspection and acceptance. Payment and administrative coordination are managed through the State Water Resources Control Board and the Department of Fish and Wildlife using check, cash, or credit as payment methods, with no electronic invoicing systems such as WAWF or IPP in use. There is no defined period of performance, delivery schedule, or FOB terms documented, and no specific technical inspection criteria, quality standards, or packaging requirements beyond environmental compliance have been specified. The applicant, Merced Irrigation District, is recognized as a state agency with no formal small business or socioeconomic certifications, and while key contacts including Michael Morris and Jordan Robbins serve as primary points of communication, no formal COR, COTR, or PCO roles are designated in the records. Approval is contingent upon adherence to the approved EIR, implementation of mitigation measures, and compliance with all state permitting requirements, with

General Info

Excavate 75,000 cubic yards of tailings to restore river habitat, reconnect pond, and install woody structures for ecological improvement.

Agency

California → Merced Irrigation District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Merced Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Merced Irrigation District
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Michael MorrisSurvey Project Manager

Full Description

Show more
Approval of Permit No. 20083, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To excavate approximately 75,000 cubic yards of dredger mine tailings along the Merced River channel. Approximately 45,000 cubic yards of the excavated material will be screened and placed within the active channel to create a pool and riffle sequence for fish rearing and passage. Excavation and material placement will directly connect a hydraulically connected pond to the Merced River main stem. Large woody structures will be placed within the floodway. Excess excavated material will be placed within an existing 1.4-acre pond on the north side of the project area outside of the floodway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS