Sawmill Tank Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Calaveras County Water District is planning to replace its aging 3.0-million-gallon potable water storage tank, originally built in 1977 with subsequent upgrades in 2012 and 2018, which has become oversized for current demand and is contributing to water quality issues due to chlorinated organics from structural deterioration. The project involves constructing two new 0.5-million-gallon tanks on newly installed concrete foundations adjacent to the existing site, with land acquisition through an easement or lot line adjustment. Once the new tanks are operational, the old tank and its concrete foundation will be demolished and removed. The replacement site, located on a timber management parcel owned by Sierra Pacific Industries, has already been cleared of trees under an approved Timber Harvest Plan, and all required environmental studies—including botanical, wildlife, and cultural resource assessments—have been completed in compliance with the California Forest Practice Act. Construction will involve approximately 20,000 square feet of ground disturbance in a recently logged, relatively level area, with access maintained via the existing tank site to ensure ongoing operation and maintenance. The project is forecasted to be available in June 2026, with key contact information provided through the district engineer.
General Info
Agency
NAICS
Place of Performance
Specific: Approx. 0.23 miles north of Highway 4, 0.75 miles east of White Pines Lake, CA., CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
