Sawmill Tank Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Calaveras County Water District is initiating the Sawmill Tank Replacement project in California to improve water quality and storage efficiency for the Dorrington and Big Trees rural residential communities. The project involves replacing an aging 3.0-million-gallon potable water storage tank, which has caused water quality issues due to chlorinated organics, with two new 0.5-million-gallon tanks. These new tanks will be constructed on concrete foundations on land adjacent to the existing site, which is part of a timber management parcel owned by Sierra Pacific Industries. The project requires approximately 20,000 square feet of disturbance in a recently logged area and will utilize existing pumps and facilities for water distribution. The operational plan requires the new storage tanks to be fully in service before the demolition of the existing tank and its concrete foundation occurs. From a regulatory standpoint, the project has been granted a Class 2 categorical exemption under the California Environmental Quality Act, as it replaces utility facilities without significant changes in purpose or capacity. This forecast is categorized under NAICS code 237990 and was posted on June 24, 2026, with Kevin Williams serving as the primary point of contact.

General Info

Replace aging 3-million-gallon tank with two 500k-gallon tanks, demolish old structure, complete environmental checks, construction by June 2026.

Agency

California → Calaveras County Water District

Place of Performance

Specific: Approx. 0.23 miles north of Highway 4, 0.75 miles east of White Pines Lake, CA., CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Calaveras County Water District
Office AddressN/A
Contacts
Kevin WilliamsDistrict Engineer

Full Description

Show more
Calaveras County Water District (CCWD) proposes the replacement of the existing approximately 3.0 million-gallon potable water storage tank currently serving the Dorrington and Big Trees rural residential communities. The existing water tank was built in 1977 with improvements in 2012 and 2018. The current tank exceeds the size needed for normal water demands of the nearby communities. The excessive size and age-related deterioration of the tank has caused water quality issues from chlorinated organics. CCWD proposes to construct two 0.5-million-gallon tanks on new concrete foundations on land adjacent to the existing tank site; land for the replacement tanks will be obtained via an easement or lot line adjustment. Upon completion of the new water storage tanks, the CCWD will demolish the deteriorating tank and remove the existing concrete foundation. The two proposed replacement tanks would be located adjacent to the existing tank. Tank constructio_n and piping installation will require approximately 20,000 square feet of disturbance in this relatively level and recently-logged area, Access to replacement tank site will be accessible from the existing tank site for operation and maintenance. The replacement tank site is part of a larger timber management parcel owned by Sierra Pacific Industries (SPI); CCWD will obtain rights to construct the replacement tanks on the adjacent site from SPI. Existing tree cover on the replacement tank site has been removed by the owner in accordance with an approved Timber Harvest Plan No. 4-24-00165-CAL known as the Crockett THP. As required by the California Forest Practice Act, SPI performed required technical studies of the larger THP parcel including the proposed replacement tank site. Technical studies included botanical, wildlife and cultural resources database searches and surveys during preparation of the THP application.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS