Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Restroom Renovation Project Management and General Contracting

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves a multi-story steel frame laboratory and office facility totaling 12,920 square feet, featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including underground stormwater retention, utilities, telecommunications, landscaping, and parking. An additional option for the P1016 facility includes a 17,978 square foot laboratory and the demolition of Building 1272T. The scope of work covers a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact the primary point of contact to receive the bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 18 hours ago

DEADLINE

in 3 months
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center, operated by Education and Training Resources (ETR), is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure plastic laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, responses must include a completed bid sheet, a detailed cost breakdown separating materials and labor, a proposed project schedule, and proof of current Vermont state professional licensing. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Depending on the contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars. Additionally, contractors must provide certificates of insurance for Builders Risk, Automobile, Liability, and Workers Compensation, and certify compliance with the Davis Bacon Act and prevailing wage laws. Payment terms are net 30 days upon satisfactory receipt of services and a proper invoice. ETR serves as the sole judge for award selection, and the lowest bid does not guarantee a contract award.
Northlands Job Corps Center /ETR

POSTED

about 18 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional construction includes a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass specialized foundations using rigid inclusions and load transfer mats, the installation of intrusion detection and lightning protection systems, and extensive site work involving rock excavation, grading, and wetland mitigation. The contract requires a wide array of trades, including demolition, abatement, structural steel, electrical utilities, plumbing, and mechanical systems. Site improvements will feature new access roads, paved loading areas, and comprehensive telecommunications infrastructure. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to the full project documentation.
J & J Contractors, Inc

POSTED

about 18 hours ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract focuses on managing the complete renovation of restrooms across six units, encompassing project coordination, scheduling, subcontractor oversight, and ensuring adherence to specified requirements. The scope emphasizes comprehensive general contracting responsibilities to guarantee that all aspects of the restroom upgrades are executed efficiently and in compliance with established standards. Issued by South Georgia State College, this subcontract opportunity falls under NAICS code 236220, which relates to commercial and institutional building construction. The contract was posted on June 9, 2026, with responses due by June 30, 2026. While certain specifics such as the exact location or point of contact are not provided, the project clearly aims to streamline renovation efforts through effective management and subcontractor control to meet the college’s facility improvement goals.

General Info

Manage and renovate restrooms in six units with project coordination and subcontractor oversight.

Agency

South Georgia State CollegeView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-58800-RFQ-2026-000000018.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

COLLINS HALL RESTROOM RENOVATION

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Georgia State College
ContactsNo contacts available
OfficeN/A
Organization / Agency
South Georgia State College
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Overall project coordination, scheduling, subcontractor management, and compliance with specifications for the full restroom renovation across six units.