This Solicitation opportunity from California was posted on October 24, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 3 to RFB 8458 Part 4 - Labor and Wage Provisions: This document is Addendum 3 to Request for Bid (RFB) 8458 Part 4, focusing on labor nondiscrimination, state prevailing and federal minimum wage rates, and public safety provisions. It references California Code of Regulations and the Davis-Bacon Act, emphasizing contractor responsibilities to comply with nondiscrimination and wage payment requirements. The document includes details on wage determinations, availability of wage rates, and incorporation of General Decision Number CA170001, Modification No. 19, as part of the contract. It also outlines contractor obligations for public safety during project execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 4 to RFB 8458 Part 7 - Forms and Plans: This document is Addendum 4 to Request for Bid (RFB) 8458, specifically Part VII, which includes various forms, standard plans, and project plans. It contains supplemental forms related to Disadvantaged Business Enterprise (DBE) certification and utilization reports, environmental documents including County of San Diego notices and Caltrans NEPA/CEQA forms, as well as supplemental and regional standard drawings for construction elements such as curb ramps, driveways, drainage, and retaining walls. The document serves to update or supplement the original bid package with critical compliance and technical details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for RFB 8458 Reche Road Improvements: This document is Addendum No. 1 dated October 27, 2017, for the County of San Diego Department of Public Works Request for Bid (RFB) 8458 concerning road improvements at Reche Road near Live Oak Elementary School and Potter Junior High School. The addendum modifies the contract documents by deleting and replacing note 3 on Sheet 18 of the Project Plans to specify the total soil disturbance area as 0.90 acres. It also adds a new note 6 limiting stockpiling, equipment storage, and staging locations on unpaved surfaces outside project limits to 0.10 acres. The addendum forms part of the contract documents and clarifies project scope details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 to RFB 8458 for Reche Road Improvements: This document is Addendum No. 2 dated November 16, 2017, for the County of San Diego Department of Public Works Request for Bid (RFB) 8458 concerning Reche Road improvements at Live Oak Elementary School and Potter Junior High School. It modifies the original contract documents by replacing specific pages in Parts 2, 3, and 5, and adds new pages to the technical provisions. The addendum forms part of the contract documents and details changes and additions to be incorporated. Contact information for the procurement officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 to RFB 8458 for Reche Road Improvements: This document is Addendum No. 3 dated November 22, 2017, for the County of San Diego Department of Public Works Request for Bid (RFB) 8458 concerning Reche Road improvements at Live Oak Elementary School and Potter Junior High School. It modifies the original contract documents by replacing specific pages in Part 4 - Special Conditions and Part 6 - Other Agency Requirements. The addendum includes attachments with the revised pages and serves to update and clarify contract requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 to RFB 8458 for Reche Road Improvements: This document is Addendum No. 4 dated November 29, 2017, for the County of San Diego Department of Public Works Request for Bid (RFB) 8458 concerning road improvements at Reche Road near Live Oak Elementary School and Potter Junior High School. It modifies the original contract documents by replacing specific pages in Parts 2, 3, 4, 6, and 7 with updated versions and adds new pages to Part 7. The bid opening date has been changed to December 8, 2017, at 2:00 PM PST. The addendum includes attachments of the revised pages and provides contact information for the procurement officer.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid Package for Reche Road Improvements, Bid No. 8458: This document is the contract bid package for the Reche Road improvements at Live Oak Elementary School and Potter Junior High School, Federal Aid Project No. ATPL-5957 (121), Oracle Project No. 1019491. It includes bidding information, proposal forms, contract documents, special provisions, and technical specifications. The bid opening date was November 30, 2017, and the document outlines DBE requirements with an 18% contract goal. It provides instructions for addenda, plan holders list, and contact information for the procurement officer. The package contains detailed sections on proposal requirements, contract execution, special conditions, wage determinations, and federal contract language, making it a comprehensive solicitation for construction services.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Wage Decision CA170001 for San Diego County, CA: This document is the General Wage Decision Number CA170001 dated 11/24/2017 for San Diego County, California. It supersedes the previous decision CA20160001 and covers building, heavy, highway, and residential construction projects. The document includes wage rates and fringe benefits for various construction trades such as asbestos workers, boilermakers, bricklayers, carpenters, drywall installers, electricians, and others. It also references the Executive Order 13658 minimum wage requirements effective from January 1, 2015, with an hourly minimum wage of $10.20 for 2017. The wage rates are detailed with modifications and publication dates, providing critical labor cost information for contractors working on covered projects in the specified region.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Wage Decision CA170001 for San Diego County, CA: This document is the General Wage Decision Number CA170001 dated 10/27/2017 for San Diego County, California. It supersedes the previous decision CA20160001 and covers building, heavy, highway, and residential construction projects. The document includes wage rates and fringe benefits for various construction trades such as asbestos workers, boilermakers, bricklayers, carpenters, drywall installers, and electricians. It also references the Executive Order 13658 minimum wage requirements effective from January 1, 2015, with an hourly minimum wage of $10.20 for 2017. The document contains detailed wage rates, fringe benefits, and classifications applicable to contractors working on covered projects in the specified county.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Abstract and Bid Schedule for Reche Road Improvements: This document is the Abstract and Bid Schedule for RFB 8458, dated December 8, 2017, for the Reche Road improvements at Live Oak Elementary School and Potter Junior High School in San Diego County, California. It includes the Notice of Intent to Award indicating the apparent low bidder, Ramona Paving & Construction Corp., with a bid amount of $1,380,874. The document details the bid schedule with itemized construction tasks, quantities, unit prices, and totals. It references contract conditions, special provisions, standard specifications, and plans approved on September 13, 2017. The document serves as a formal proposal and bid abstract for the public works construction project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Addendum 2 Bid Schedule Part 2: This document is an addendum (Addendum 2) to the Request for Bid (RFB) 8458, specifically part 2 of the bid schedule. It contains a continuation of the bid schedule with item numbers 36 to 49, detailing descriptions, estimated quantities, units of measure, and placeholders for unit and total prices. The document emphasizes that the County may deem bids non-responsive if they contain any mathematical errors. The bid items include various construction and landscaping materials and services such as traffic control, permeable asphalt and concrete pavement, structural and engineered soil, street trees, irrigation systems, water meters, rock slope protection, manhole cover adjustments, temporary cover and soil binder, and erosion control move-in/move-out. This document is critical for bidders to accurately complete their pricing and submit responsive bids.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Addendum 2 Temporary Cover Specifications: This document is Addendum 2 to RFB 8458, detailing specifications for temporary cover used in construction projects. It includes requirements for materials such as geosynthetic fabrics, gravel-filled bags, and restrainers, with specific ASTM standards and physical properties. The document outlines construction methods for installing temporary cover fabric and linear sediment barriers to control erosion and water pollution. Maintenance instructions are provided to ensure the integrity of the temporary cover and sediment barriers. The addendum emphasizes compliance with specified materials, installation techniques, and timely repairs to maintain environmental protection during construction activities.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Addendum 4 Bid Schedule Part 2: This document is an addendum (Addendum 4) to the Request for Bid (RFB) number 8458, specifically part 2 of the bid schedule. It contains a continuation of the bid schedule with item numbers 36 through 50, detailing descriptions, estimated quantities, units of measure, and placeholders for unit prices and total prices. The document emphasizes that the County may deem bids non-responsive if they contain any mathematical errors. The bid items include various construction and landscaping materials and services such as traffic control, permeable asphalt and concrete pavement, structural and engineered soil, street trees, irrigation systems, water meters, rock slope protection, manhole cover adjustments, temporary covers and soil binders, erosion control, and gravity retaining walls.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Addendum 4 Bid Schedule Part 3: This document is part 3 of the bid schedule for RFB 8458, specifically Addendum 4. It contains a continuation of the bid schedule listing various construction items such as traffic control, permeable asphalt and concrete pavement, structural and engineered soil, street trees, irrigation system, water meter, rock slope protection, manhole cover adjustment, temporary cover and soil binder, erosion control move-in/move-out, and gravity retaining walls. Quantities and units of measure are provided for each item, with spaces for unit prices and total bid amounts. This document is critical for bidders to prepare their pricing and submit their bids accordingly.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8458 Addendum 4 - Labor and Wage Provisions: This document is Addendum 4 to RFB 8458, providing important updates and requirements related to labor nondiscrimination, state prevailing and federal minimum wage rates, and public safety for the project. It references California Code of Regulations and the Davis-Bacon Act, emphasizing contractor responsibilities to comply with wage laws and nondiscrimination clauses. The addendum incorporates General Decision Number CA170001, Modification No. 20, as part of the contract documents, and outlines the necessity for contractors to pay the higher of state or federal wage rates. It also highlights the contractor's obligation to ensure worker safety and public safety during project execution.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 8458 Part 3 Bid Schedule Addendum 2: This document is an addendum (Addendum 2) to the bid schedule for RFB 8458, part 3. It contains a detailed continuation of the bid schedule listing item numbers, descriptions, estimated quantities, units of measure, and placeholders for unit and total prices. Items include traffic control, permeable asphalt and concrete pavement, structural and engineered soil, street trees, irrigation system, water meter, rock slope protection, manhole cover adjustment, temporary cover and soil binder, and erosion control move-in/move-out. The document is essential for bidders to prepare accurate bids for the specified construction and landscaping work.
PDF
PDF, High priority: read this firstproject-plans
HighAI Summary for RFB 8458 Project Plans Fullsize: This document contains the project standard specifications and plans for public works construction, specifically for RFB 8458. It includes references to the 2015 Standard Specifications for Public Works Construction (Greenbook), Caltrans Standard Plans from May 2015, San Diego Area Regional Standard Drawings from December 2015, and San Diego County Design Standards from October 2012. The plans cover road work details, permanent water pollution control BMPs, survey control information, and environmental notes regarding vegetation clearing and stencil placement for storm drain inlets. The document is intended to guide construction and environmental compliance for the project at Reche Rd @ Live Oak Elementary School & Potter.
PDF
PDF, High priority: read this firststructural-section-report
HighAI Summary for RFB 8458 Structural Section Report for Reche Road Improvements: This document dated November 8, 2016, from the San Diego County Department of Public Works Materials Lab, provides structural section recommendations for the Reche Road Roadway Improvements project near Fallbrook. It includes soil test results from a previous project and offers two structural section options for pavement construction based on an R-value of 44 and a traffic index of 8.0. The recommendations comply with the latest County of San Diego Public Road Standards and specify materials and compaction requirements for asphalt concrete, aggregate base, and native subgrade.
PDF
PDF, High priority: read this firstspecial-provisions
HighAI Summary for San Diego County Reche Road Improvements Technical Provisions Addendum 2: This document is Part V of the Special Provisions for the Reche Road improvements at Live Oak Elementary School and Potter Junior High School in San Diego County, Oracle Project No. 1019491. It includes detailed technical provisions covering a wide range of construction and environmental control topics such as trench safety, water pollution control, earthwork, erosion control, pavement marking, traffic control, and planting. The document serves as an addendum (Addendum 2) and provides essential technical specifications and requirements for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for San Diego Regional Standard Drawing Gravity Retaining Walls Addendum 4: This document is an addendum (Addendum 4) to the San Diego Regional Standard Drawing for Gravity Retaining Walls, last reviewed in November 2015. It includes detailed tables of wall types, heights, base dimensions, and concrete volume requirements. The document specifies concrete strength requirements, design conditions, and design data including soil and pressure parameters. It also outlines excavation and backfill procedures, compaction requirements, and drainage details. The document references revisions dating back to 1975 with metric additions and deletions. It serves as a technical amendment providing critical construction and design specifications for retaining walls.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid 8458 Planholders List for Reche Rd Improvements: This document is the planholders list for Bid 8458 concerning road improvements at Reche Rd near Live Oak Elementary School and Potter Junior High School. The bid date is November 30, 2017. The list includes company names, contact persons, general or subcontractor designation, addresses, and telephone/fax numbers of entities interested in the bid as of October 25, 2017.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Planholder's List for Bid 8458 Reche Rd Improvements: This document is the Planholder's List for Bid #8458 concerning the Reche Rd at Live Oak Elementary School and Potter Junior High School Road Improvements. Dated November 30, 2017, it lists companies and contacts who have obtained the bid documents, including their addresses, phone and fax numbers, and email contacts. The list includes general contractors and subcontractors interested in the project as of various dates in October and November 2017.
TXT
TXT
PDF
PDF
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.