This Solicitation opportunity from California was posted on October 28, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to RFB 9944 Demolition of Hillcrest Receiving Home: This document is Addendum No. 1 to Request for Bid (RFB) 9944 issued by the County of San Diego for the demolition of Hillcrest Receiving Home. Dated October 29, 2019, it modifies the original contract documents by deleting Section A - DVBE Requirements and Forms (Page A-7) and replacing it with a revised Section A (Page A-7a) that outlines Disabled Veterans Business Enterprise (DVBE) participation requirements. The addendum emphasizes a 3% DVBE subcontractor participation goal or a good faith effort to meet this goal, including submission of related plans and documentation. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to RFB 9944 Demolition of Hillcrest Receiving Home: This document is Addendum No. 2 dated November 8, 2019, for Request for Bid (RFB) 9944 concerning the demolition of the Hillcrest Receiving Home by the County of San Diego. It provides clarifications through a Q&A section addressing contractor responsibilities such as security services, licensing requirements, bond submissions, and site-specific demolition details. It also includes a deletion and replacement of a section in the Scope of Work related to construction fencing. The addendum modifies and supplements the original contract documents to guide bidders and contractors on project execution requirements.
PDF
PDF, High priority: read this firstsurvey-report
HighAI Summary for Asbestos/Lead Pre-Demolition Survey Report Addendum Hillcrest Receiving Home: This document is an addendum asbestos and lead pre-demolition survey report for the Hillcrest Receiving Home located at 4703 3rd Avenue, San Diego, dated November 7, 2019. It updates a previous 2013 survey to comply with revised Air Pollution Control District rules. The report summarizes findings of asbestos and lead presence in various building materials such as floor tiles, mastics, plaster, drywall, fire doors, and thermal insulation. It also notes hazardous materials like mercury thermometers, cleaning chemicals, and electronic waste on site. The report provides recommendations for managing these materials prior to demolition but does not include a scope of work for abatement. Contractors are advised to use this report along with the 2013 survey for comprehensive hazardous material assessment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City Stormwater Runoff Regulations Attachment B: This document contains the City of San Diego's stormwater runoff and drainage regulations as part of the Land Development Code. It includes general development regulations, construction standards for stormwater runoff control, and requirements for development within special flood hazard areas. The document references amendments effective from 2001 and 2002 and outlines responsibilities for erosion prevention, sediment control, and phased grading to protect water quality and minimize flood hazards. It serves as a technical specification for compliance with municipal stormwater management and discharge control.
PDF
PDF, High priority: read this firstdebris-management-plan
HighAI Summary for Debris Management Plan for Construction and Demolition: This Debris Management Plan form is required to be completed before obtaining a building or demolition permit in San Diego, CA. It includes sections for project and permit details, debris estimation by material type, and requirements to reduce landfill disposal by 90% for inerts and 70% for other materials by weight. The form certifies that the debris is generated only from the listed project and must be submitted with a performance guarantee to the Department of Public Works. Contact information for recycling resources is provided. The document ensures compliance with local debris handling and recycling regulations.
PDF
PDF, High priority: read this firstlabor-compliance-reference-sheet
HighAI Summary for Labor Compliance Reference Sheet - Section D Attachment E: This document is a Labor Compliance Reference Sheet updated as of August 2019. It outlines the responsibilities of the Awarding Body and Contractors under Public Works Labor Compliance, including registration, monitoring, and documentation requirements. It also details the Skilled and Trained Workforce Requirements per AB 3018, specifying workforce qualifications, apprenticeship graduation percentages, exemptions, and penalties for noncompliance. The document serves as a compliance reminder and update for contractors and awarding bodies involved in public works projects.
PDF
PDF, High priority: read this firstattachment
HighAI Summary for RFB 9944 Attachment J - DTSC Certified Appliance Recycler Program: This document is Attachment J to Request for Bid (RFB) 9944 for the Demolition of Hillcrest Receiving Home. It details the Department of Toxic Substances Control (DTSC) Certified Appliance Recycler (CAR) Program requirements for appliance recycling. The attachment explains the legal requirements for handling materials that require special handling (MRSH) in appliances, certification requirements for recyclers, and documentation needed for compliance. It also includes an updated list of approved Certified Appliance Recyclers in the San Diego area as of 8/15/2019. The document supports proper environmental and health safety practices in appliance recycling as part of the demolition project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Demolition of Hillcrest Receiving Home: This document is the pre-bid conference presentation for RFB 9944 issued by the County of San Diego Department of General Services for the demolition of Hillcrest Receiving Home. It includes the solicitation schedule with key dates such as the pre-bid conference, job walk, questions deadline, and bid due date. The RFB package contents are outlined, including bid documents, instructions to bidders, standard terms and conditions, and exhibits like the statement of work and insurance requirements. The statement of work covers contractor requirements, permits, safety, and environmental considerations. Contact information for the procurement contracting officer is provided. The document aims to guide bidders through the RFB process and requirements.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Demolition of Hillcrest Receiving Home: This document is the Request for Bid (RFB) 9944 issued by the County of San Diego Department of General Services on October 28, 2019. It solicits bids for the demolition of the Hillcrest Receiving Home located at 4307 Third Avenue, San Diego, CA. The RFB includes detailed instructions for bidders, required contractor classifications, bid submission requirements, and a schedule with key dates such as pre-bid conference, job walk, question deadline, and bid due date. The County intends to award a contract to the lowest responsive and responsible bidder with an estimated project cost between $2,000,000 and $2,500,000 and a contract duration not exceeding 130 calendar days. The package includes various sections covering scope of work, insurance, bonding, pricing, and attachments related to environmental and safety plans.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Demolition of Hillcrest Receiving Home Abstract: This document is an abstract and notice of intent to award for Request for Bid (RFB) 9944, dated 11/22/2019, for the demolition of the Hillcrest Receiving Home. It lists bidders and their bid amounts, indicating the apparent low bidder and noting conditions that may affect final award. The document also includes representations and certifications required from bidders, covering business type, local business status, certifications, debarment status, related work disclosures, and pricing certifications. It serves as a key procurement document for this demolition project under the County of San Diego Department of Purchasing and Contracting.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Section D Attachment A1 City Muni Code Noise Regulations: This document is an attachment (Section D Attachment A1) to RFB 9944, detailing the City Municipal Code regulations related to noise and other off-site development impacts. It includes general development regulations for air contaminants, noise, electrical/radioactivity disturbance, glare, and outdoor lighting. The regulations aim to minimize negative impacts from development on surrounding properties, specifying standards for emissions, noise levels, electrical interference, reflective materials, and outdoor lighting controls. The document references effective dates from 1997 and amendments up to 2001, and includes compliance requirements with California Energy Code and other local regulations.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Section D Attachment C - DEH Pre-Demo Survey Hillcrest Receiving Home: This document is a pre-demolition asbestos and lead survey report for the Hillcrest Receiving Home, located at 4307 3rd Avenue, San Diego, dated July 25, 2013. It details the presence of asbestos-containing materials such as black mastic under flooring, roofing mastic, and thermal system insulation in various buildings and trailers on the site. The lead survey found no high concentrations of lead paint but detected lead in ceramic tiles and some painted surfaces. The report includes recommendations to mitigate identified hazards prior to demolition. It serves as an attachment to RFB 9944 Section D and is critical for environmental health and safety compliance during demolition.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 9944 Section D Attachment F - Required Diversion of Demolition Debris: This document outlines the required diversion of construction and demolition debris for County projects as per Board Policy G-15 and the Construction and Demolition Recycling Ordinance. It mandates contractors to submit a Debris Management Plan with their proposal, aiming to divert 90% of inert materials and 70% of other materials from landfill disposal. The document details debris types, recycling requirements, special handling for hazardous materials, and reporting obligations including daily logs and quarterly reports. It provides guidance on compliance, exemptions, and submission instructions to the County's Solid Waste Planning and Recycling office. The document is essential for contractors bidding on County construction and demolition projects to ensure environmental compliance and waste diversion.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 9944 section d attachment i7 property record drawing 1970: This document is an attachment (i7) to Section D of Request for Bid (RFB) number 9944, dated 1970. It contains property record drawings relevant to the bid solicitation. The document serves as a technical reference for bidders to understand property details necessary for preparing their bids.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Site Specific Safety Plan Template for Contract MH20719: This document is a Site Specific Safety Plan (SSSP) Template required by the County of San Diego Department of General Services for contracted projects. It outlines the safety planning process, hazard identification, and control measures to be implemented at the project site located at 4307 Third Avenue, San Diego, CA. The plan must be reviewed and approved before operations commence and kept current and accessible on site. It includes sections on project tasks, hazard analysis, safety control measures such as demolition, traffic control, environmental protection, dust and odor control, site control, waste disposal, hazardous energy control, emergency response, fire protection, evacuation, hazardous materials release, and required safety postings. The document emphasizes compliance with California Code of Regulations Title 8 Safety Orders and Cal-OSHA standards. The template is intended to ensure thorough safety management and communication among all personnel involved in the project.
PDF
PDF, Low priorityother
LowAI Summary for City of San Diego Construction Noise Ordinance Attachment A2: This document is an attachment related to the City of San Diego's noise ordinance, specifically Division 4 Limits, Section 59.5.0404 concerning construction noise. It outlines regulations prohibiting construction noise during nighttime hours and certain holidays without a permit. The Noise Abatement and Control Administrator evaluates permit applications based on noise impact, neighborhood character, and public interest. It also sets a maximum allowable noise level of 75 decibels during daytime hours for residential zones, with exceptions for emergency work. The document was amended on January 3, 1984.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Planholders List for RFB 9944 Demolition of Hillcrest Receiving Home: This document is a planholders list for the Request for Bid (RFB) number 9944 concerning the demolition of Hillcrest Receiving Home. The bid date is November 22, 2019, at 11:00 am. The list includes companies and contact persons who have shown interest in the bid, along with their general/subcontractor status, addresses, and phone/fax numbers. The document was last updated on 11/04/2019 with entries such as Anton's Service, Inc. and TL Veteran's Construction, Inc.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Planholders List for RFB 9944 Demolition of Hillcrest Receiving Home: This document is the planholders list for the Request for Bid (RFB) number 9944 concerning the demolition of the Hillcrest Receiving Home. The bid date is November 22, 2019, at 11:00 am. The list includes companies and contact persons who have obtained the bid documents, along with their general or subcontractor status, addresses, and phone/fax numbers. The document serves as a record of interested bidders for this demolition project.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for RFB 9944 - Demolition of Hillcrest Receiving Home Job Walk Sign-In Sheet 11/06/19: This document is a sign-in sheet for the job walk related to RFB 9944, which concerns the demolition of the Hillcrest Receiving Home. Dated November 6, 2019, it lists attendees including their names, company affiliations, email addresses, and phone numbers. The sheet is intended to record participants who attended the job walk event, providing contact information for various contractors and companies involved or interested in the project.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFB 9944 Pre-Bid Conference Sign-In Sheet: This document is a sign-in sheet for the pre-bid conference related to RFB 9944, which concerns the demolition of Hillcrest Receiving Home. The conference took place on November 5, 2019. The sheet lists attendees with their names, company names, emails, and phone numbers, capturing participation details for the pre-bid meeting. It serves as a record of interested parties and potential bidders attending the conference.
PDF
PDF, Low prioritybuilding-equipment-list
LowAI Summary for RFB 9944 Section D Attachment D Building Equipment List: This document is an attachment to RFB 9944, specifically Section D Attachment D, providing a detailed list of building equipment for Hillcrest Receiving Home located at 4307 Third Avenue. It includes asset types, manufacturers, models, serial numbers, quantities, and descriptions of various equipment such as AC units, gas packs, walk-in cooler, hot water boiler, generator, and backflow preventers. The list serves as an inventory reference for the building's mechanical and HVAC equipment.
TXT
TXT
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.