RFI for LBNF FSCF - Shaft Pipe Welding

Closed
LBNF-FSCF-SPW-RFIFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 23
Federal
Industry Day: A Government-Industry Exchange on Construction Contracting - An Invitation for Industry Partners to Collaborate with the United States Space Force Operational Contracting Enterprise
Solicitation # AFICC_KS_Industry_Day_September_2026
The United States Space Force Operational Contracting Enterprise is hosting an Industry Day on September 14, 2026, in Colorado Springs and via Microsoft Teams to collaborate with general contractors on accelerating construction timelines. The event focuses on the implementation of new, flexible contracting authorities, specifically Other Transaction Authority (OTA) under 10 U.S.C. section 2808a. This initiative aims to bypass traditional FAR-based procurement bottlenecks through Commercial Solutions Openings (CSOs), allowing the government to integrate commercial best practices and innovative building methods to move from concept to capability faster. Budget projections for FY27 through FY31 indicate significant opportunities, with approximately 5.6 billion dollars for MILCON and 3.3 billion dollars for FSRM projects. Under the 2808a authority, awards must be structured as Fixed-Price Other Transactions, such as Fixed-Price Incentive or Fixed-Price Award Fee agreements. Because these OTs lack standard FAR-based protections, the government and industry partners will develop tailored articles to govern disputes, changes, and terminations. The award process is phased, beginning with a white paper evaluation based on relevance and rough order of magnitude pricing, followed by an oral pitch of constructability plans, and concluding with the joint development of a Statement of Work. Evaluation criteria emphasize industrial construction methods, schedule realism, financial health, and adherence to commercial building codes like IBC and NEC, as well as DoD Unified Facilities Criteria. While flexible, these agreements still require compliance with the Davis-Bacon Act, Service Contract Act, Miller Act, and the Buy American Act.
Air Force Space Command

POSTED

about 1 month ago

DEADLINE

in 3 days

General Info

NAICS

23 - Construction

Place of Performance

Lead, SD, USA

Set-Aside

NONE

Documents

4

Ross Headframe Photos

PDF, High priority: read this firstspecifications
High

Arup+Shaft+Piping+Package.pdf

PDF

Ross+Shaft+HeadframeDrawings.pdf

PDF

Shaft+Pipe+Welding+RFI.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more
Request for Information This is a request for Information (RFI) issued by Fermi Research Alliance, LLC (FRA), manager and operator of Fermi National Accelerator Laboratory (FERMILAB), under its Prime Contract Number DE-AC02-07CH11359 with the United States Department of Energy (DOE). FRA is leading the Long Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. Background The LBNF project (httpsw://lbnf-dune.fnal.gov/) will provide facilities to enable a world-class program in neutrino physics that can measure fundamental physical parameters, explore physics beyond the Standard Model, and better elucidate the nature of matter and anti-matter. Specifically, the LBNF Project will build a new high-intensity neutrino beam at the Fermi National Accelerator Laboratory aimed at the LBNF Far Site, located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, 1,300 km away, where the associated Deep Underground Neutrino Experiment (DUNE) will build a neutrino detector, known as the Far Detector. DUNE will also build a neutrino detector at Fermilab, known as the Near Detector, to characterize the neutrino beam as it leaves Fermilab. The experiment will be optimized for precision measurement of neutrino oscillations with the goal of searching for charge parity-violation in the neutrino sector, as well as making other precision oscillation measurements. Far Site Construction Fermi Research Alliance's Long Baseline Neutrino Facility (LBNF) Project requests your valuable input. Please see attached documents regarding shaft pipe welding for the Far Site Argon gas service pipe. The primary point of contact for the RFI is Craig Schmitz, LBNF Procurement Manager, or his designee. All questions regarding this RFI should be submitted via electronic mail to contact@example.gov by 3:00 P.M. CST on January 23, 2023. All responses to this RFI should be submitted by electronic mail to contact@example.gov by 3:00P.M. CST on January 25, 2023. This is not a Request for Proposal (RFP) or Quote (RFQ) and no submissions will be accepted as official offers for a contract. FRA will not reimburse respondents for any expenses associated with this RFI.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

10 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS